Nex Metals Exploration Ltd · ASX:NME

Nex Metals Exploration — Nex Metals Explorations — Shareholder Meeting (November 2011)

16 slides from Nex Metals Exploration's shareholder meeting presentation, Nov 30, 2011

  1. Slide 1: Nex Metals Explorations Ltd

    Explorations Ltd www.nexmetals.com

  2. Slide 2: Disclaimer

    For personal use only Disclaimer • This presentation is provided to you for the sole purpose of providing preliminary background technical, financial and other information to enable you to review the business activities of Nex Metals Explorations Ltd. • The material provided to you does not constitu

  3. Slide 3: Corporate Information

    For personal use only C O R P O R AT E I N F O R M AT I O N • Heap Leach • Navigator Toll Treating Agreement • A1 Toll Treating Agreement • Funding • Orient Well Mill

  4. Slide 4: Located in Historical Mining Area

    For personal use only Located in Historical Mining Area 200km north of Kalgoorlie on a bitumised all weather highway. Bus in bus out (Kalgoorlie) workforce

  5. Slide 5: Kookynie

    For personal use only KOOKYNIE • 23 deposits with JORC- compliant resource estimations. • Total inventory of 769,000 ounces of gold. • Pit optimisations ti i ti being b i conducted by Minecomp Pty Ltd of Kalgoorlie, 13 completed. p • Exploration upside along mineralised structures.

  6. Slide 6: For personal use only

    For personal use only • 23 deposits with JORC- compliant resource estimations. estimations • Total inventory of 769,000 ounces of gold. • Pit optimisations being conducted by Minecomp Pty Ltd of Kalgoorlie Kalgoorlie, 13 completed. • Exploration upside along mineralised i li d structures.

  7. Slide 7: For personal use only

    For personal use only • 23 deposits with JORC- compliant resource estimations. estimations • Total inventory of 769,000 ounces of gold. • Pit optimisations being conducted by Minecomp Pty Ltd of Kalgoorlie Kalgoorlie, 13 completed. • Exploration upside along mineralised i li d structures.

  8. Slide 8: For personal use only

    For personal use only • 23 deposits with JORC- compliant resource estimations. estimations • Total inventory of 769,000 ounces of gold. • Pit optimisations being conducted by Minecomp Pty Ltd of Kalgoorlie Kalgoorlie, 13 completed. • Exploration upside along mineralised i li d structures.

  9. Slide 9: For personal use only

    For personal use only • 23 deposits with JORC- compliant resource estimations. estimations • Total inventory of 769,000 ounces of gold. • Pit optimisations being conducted by Minecomp Pty Ltd of Kalgoorlie Kalgoorlie, 13 completed. • Exploration upside along mineralised i li d structures.

  10. Slide 10: Yundamindera

    For personal use only YUNDAMINDERA • Airborne Ai b magnetic ti and d LiDAR survey flown over most of property. • Aircore drill program ongoing testing geophysical and gold anomalies. anomalies • Continuing earn-in toward the 70/30 JV with Saracen Mineral Holdings Ltd.

  11. Slide 11: Butterfly Open Pit - Summary

    For personal use only B U T T E R F LY O P E N P I T - S U M M A R Y • Originally mined by Diamond Ventures in 2002 to a depth of 20m from surface. • Nex to continue mining from the 400mRL down to the 360mRL, total depth of 60m below surface. • Toll Treating Ore – 186,000t at 2.60g/t (15,548 ounces)

  12. Slide 12: Butterfly Pit Extension

    Nex Metals ¢ Butte ing fly Pit” o Proposcc SY er ly Pit Extension WEX METALS EXPLORATIONS LTD ; S/ , _

  13. Slide 13: Butterfly Open Pit - Going Forward

    For personal use only B U T T E R F LY O P E N P I T – G O I N G F O R WA R D • GRADE CONTROL – DRILL/BLAST – MINING – ORE HAULAGE • 1,000 metres infill grade control, high possibility of increasing toll ore tonnes. • 10m bench height design to minimise dilution and reduce costs. • Target g of 1,200

  14. Slide 14: Environment Report

    For personal use only ENVIRONMENT REPORT Annual Environmental Report • documents all disturbed areas currently in place on all tenements • identified rehabilitation that has been completed by previous owners, very little to date • identified the materials available for rehabilitation • set targets f

  15. Slide 15: Water Quality Management Plan

    For personal use only Water Quality Management Plan •Department of Health requirement for campsites •Provides quality assurance for mine personnel •Ongoing monthly monitoring required Heap Leach Licence •Completed requirements with DEC Crusher and Screener •Completed C l t d requirements i t with it

  16. Slide 16: For personal use only

    For personal use only

Nex Metals Explorations — Shareholder Meeting (November 2011) on 6ix