Jadestone Energy Plc · LSE:JSE

Jadestone Energy — Investor Presentation (September 2017)

31 slides from Jadestone Energy's investor presentation, September 2017

  1. Slide 1: Investor Presentation September 2017

    INVESTOR PRESENTATION SEPTEMBER 2017

  2. Slide 2: Disclaimer & advisories

    Disclaimer & advisories Disclaimer You must read the following before continuing. The following applies to this document, the presentation of the information in this document, and any question-and-answer session that may follow (collectively, the "Presentation"). In viewing the Presentation, you agr

  3. Slide 3: Advisories

    Advisories Forward Looking Statements Information Certain statements in this presentation are forward looking statements and information (collectively “forward looking statements”), within the meaning of the applicable Canadian securities legislation, as well as other applicable international securi

  4. Slide 4: Advisories

    Advisories l "Operating netback" is a common non-GAAP metric used in the oil and gas industry. This measure assists management and investors to evaluate the specific operating performance by product at the oil and gas lease level. Operating netback is calculated as realised price less royalties, ope

  5. Slide 5: Overview of Jadestone Energy

    OVERVIEW OF JADESTONE ENERGY

  6. Slide 6: Jadestone Energy, corporate overview

    Jadestone Energy, corporate overview Snapshot Overview Financial Statement extract l Independent upstream oil & gas company As at, US$mm Jun-17 Jun-16 l Southeast Asia and Australia focus, onshore and shallow-water offshore Cash 15.1 4.8 l 4,300-4,800 boe/d production in Australia and Indonesia, lar

  7. Slide 7: Jadestone Energy, portfolio overview and NAV

    Jadestone Energy, portfolio overview and NAV Snapshot Select blocks, ordered by expected commercialisation1 2P 2C Target production Block W.I. (%) (mm boe) (mm boe) Operator (net WI) / status 17.8 Stag 100% N/A Jadestone 3,000-3,500bbl/d (100%) 1 Ogan Reserves estimated JOB with SC57 50% ~1,300 boe/

  8. Slide 8: Southeast Asia is a highly compelling energy market

    Southeast Asia is a highly compelling energy market High GDP growth rates, growing gas deficits, rising gas prices, and leading global E&P margins High growth outlook, GDP CAGR 2017—2019 % Significant growth of natural gas demand, bcf/d GDP growth US$/boe 2017—2019E, % Confirmed domestic supply Gap

  9. Slide 9: Jadestone Energy strategic focus

    Jadestone Energy strategic focus Asia Pacific strategic focus, a proven business model, and resilient Balance Sheet Value creation Balanced portfolio Focused approach Prioritise margin Balanced portfolio of Focus on select core areas in improvement and accretive production and APAC, a region with gr

  10. Slide 10: Jadestone Energy investment case

    Jadestone Energy investment case Delivering exceptional growth, value and cashflow through operating capability, technical excellence, regional knowledge and relationships Proven l Track record of exceptional value creation & entrepreneurial flair; deep experience with oil majors and large-cap manag

  11. Slide 11: New leadership

    New leadership Paul Blakeley brings a wealth of knowledge and experience to Jadestone with a very impressive track record running Talisman’s APAC business Talisman Asia Pacific production l Jadestone Energy is led by Paul Blakeley, who ran Talisman’s Asia Pacific business from 2005 and spent the pri

  12. Slide 12: Core management team

    Core management team Paul Blakeley’s leadership is augmented by a management team with significant operational and technical experience Experience Core management Previous employers Experience (years) Paul Blakeley 35 Chairman and CEO Michael Horn 25 EVP Corporate and Business Development Dan Young

  13. Slide 13: Management's track record of value creation

    Management’s track record of value creation Asia-Pacific focused strategy with a proven business model to create exceptional value History of value creation 1,200 2.3x Value creation levers Step-out exploration 4.8x 2.7x Commercial 1,000 Improved recovery Appraisal 800 Project execution NPV10 (US$mm

  14. Slide 14: Highlights for the quarter ended June 30, 2017

    Highlights for the quarter ended June 30, 2017 Final quarter of Stag under transitional operatorship with a heavy work period l Recorded zero reportable incidents across portfolio HSE focus ü l Ogan Komering achieves 2.5 million man hours with no LTI Production l Average production of 4,059 boe/d fo

  15. Slide 15: Financial results: quarterly cash bridge

    Financial results: quarterly cash bridge US$’000s US$’000s Cash balance Qtly ordinary cashflow Qtly non-recurring cashflow1 Before non-recurring items, Stag 30,000 was approaching cashflow positive, despite the increased downtime during the quarter 11,953 25,000 20,000 Ogan Komering 15,113 14,478 10

  16. Slide 16: Reserves & production

    Reserves & production Stag’s 2P reserves increased by over 3.5mm bbls from July 2016, including production Select comments 2P Reserves2 and 2C Resources3 net to Jadestone, mmboe mmbbls l Stag’s 2P reserves at acquisition estimated at 14.6mm bbls 100% oil 2P Reserves2, March 2017 (GCA) 20 6 18 l 2P r

  17. Slide 17: Embedded value in the current asset base

    Embedded value in the current asset base Downside de-risked with two cashflow generating assets and C$5.04+ NAV/share upside NAV bridge, US$mm NAV bridge, C$/share8 US$mm Existing JSE asset Subject to PVN pre-emption3 C$/share Existing JSE asset Subject to PVN pre-emption3 1,200 7 1,051 6 5.93 1,000

  18. Slide 18: Future Asia-Pacific opportunities

    Future Asia-Pacific opportunities Focus on known basins where we can deploy our skills to unlock trapped value Jadestone Energy core focus area Select comments l Potential M&A opportunities must meet Near sanction project providing Jadestone’s strict threshold acquisition criteria infrastructure hub

  19. Slide 19: 2017 calendar guidance

    2017 calendar guidance Key focus on H2 2017—period post transfer of Stag operatorship on July 10, 2017 Key metrics for remainder of the calendar year Other significant potential H2 2017 events l Further improvements in Stag l 4,300—4,800boe/d for the remainder of calendar 2017 performance Production

  20. Slide 20: Summary

    Summary Delivering exceptional growth, value and cashflow through operating capability, technical excellence, regional knowledge and relationships l Balanced portfolio of production and development assets, additional growth ü New and proven business from efficient capital reinvestment, infill drilli

  21. Slide 21: Select asset highlights

    SELECT ASSET HIGHLIGHTS — JADESTONE ENERGY

  22. Slide 22: Stag

    Stag Jadestone has already implemented several initiatives to boost production and lower costs at Stag, while having completed its first NOPSEMA audit Stag monthly production and operating costs, 2017 Milestones in tier 1 regulatory environment bbl/d US$mm l Digital asset live: Jun 2, 2017 4,000 Pri

  23. Slide 23: Stag production post operator change

    Stag Production post operator change Well & topside production and opex optimisation plan Stag strategic plan bbl/d First six Year one to Year three 4,000 months year three to year five Well/topside 3,500 production optimisation 3,000 Opex optimisation 2,500 Infill drilling 2,000 Start Work Overs LP

  24. Slide 24: Ogan Komering outlook

    Ogan Komering outlook Maximising returns on investment prior to PSC renewal l Adhering to highest HSE standards: 2.544 million manhours without LTI l Stable, reliable production l Process modifications at Mandala increasing sales gas by 8% with further potential to increase gas sales by re- perforat

  25. Slide 25: Ogan Komering outlook

    Ogan Komering outlook Value delivery under the new PSC Existing discoveries ready to be developed Value delivery beyond PSC renewal l Progress early development of existing gas discoveries l Jantung Baru, North Meraksa and Bandar Agung ~100 bcf (gross) l Exploration upside l P50 prospective resource

  26. Slide 26: Vietnam Block 05-1b&c PSC

    Vietnam Block 05-1b&c PSC Near term development & value accretion in a very familiar neighborhood Highlights Nam Con Son Basin Phu My Heritage Talisman block l US$14.3mm upfront purchase price for 30% participating interest (3900 MW) Other block Nhon Trach l 158bcf gas, 6mm bbls liquids 2C resource

  27. Slide 27: The evolution of Vietnam's domestic gas market

    The evolution of Vietnam’s domestic gas market Recent gas MOUs have purportedly been signed at US$9/mm BTU and above Vietnam wellhead gas pricing, US$/mmBTU Southeast Vietnam gas supply & transportation capacity, mmscfd US$/mm BTU (2016 real) mmscf/d 14 1,600 6.1 (LT-LD) 11.2 (RD) 12W (CS-Dua) 5.2 (

  28. Slide 28: Jadestone's Southwest Vietnam gas

    Jadestone’s Southwest Vietnam gas The route to commercialise Nam Du & U Minh will be the same as TLM’s PM-03 block Malay Basin detail of Jadestone’s Southwest Vietnam gas Select comments l Nam Du and U Minh discoveries are ~23km apart in adjacent Jadestone blocks Planned pipeline l Immediately to th

  29. Slide 29: Efforts to commercialise Nam Du and U Minh continue

    Efforts to commercialise Nam Du and U Minh continue Jadestone is now accelerating our preferred standalone development solution Field development plan (FDP) Outline Reserve EPC, development FEED, assessment drilling, plan EPCI bid conditioning report (RAR) installation (ODP) Gas sale agreement (GSA)

  30. Slide 30: Appendix

    APPENDIX JADESTONE ENERGY

  31. Slide 31: Attractive value vs peers

    Attractive value vs peers Valuation compares favourably on reserves, production and cash flow metrics. The development projects should provide further superior long-term growth Firm Value/2P Reserves, US$/boe Firm Value/EBITDA 2017E 15 10.0x 8.0x 10 6.0x 4.0x 5 2.0x 0 0.0x Peer 2 Peer 3 Peer 1 Peer