Gt Resources Inc · TSXV:GT
Gt Resources — Palladium One Mining — Investor Presentation (March 2022)
26 slides from Gt Resources's investor presentation, March 2022
Slide 1: Corporate Presentation March 2022
CORPORATE PRESENTATION MARCH 2022 TSX-V: PDM OTCQB: NKORF FRA: 7N11 1
Slide 2: Forward Looking Statements
Forward Looking Statements TSXV: PDM OTCQB: NKORF This presentation contains certain forward-looking statements that may involve a number of risks and uncertainties. Actual events or results could differ materially from Palladium One Mining Inc’s (the “Company”) expectations and projections. The TSX
Slide 3: Leadership Team
Leadership Team TSXV: PDM OTCQB: NKORF Derrick Weyrauch, CPA CA Neil Pettigrew, M.Sc., P.Geo Dr. Peter C. Lightfoot, P.Geo President, CEO and Director VP, Exploration and Director Independent Director (Audit and Comp Committee) • 30+ years of executive and • A geologist with over 20 years of corpora
Slide 4: Corporate Snapshot
Overview TSXV: PDM OTCQB: NKORF Corporate Snapshot Portfolio of PGE & “green energy” metal assets Strong institutional shareholder base Tier 1 jurisdictions: Finland & Canada Well financed to advance strategy Scale to attract a senior partner Strong share performance Research Coverage Sh
Slide 5: Palladium Market Overview
Palladium Market Overview TSXV: PDM OTCQB: NKORF Significant Jurisdictional Risk: Major Constraint to Increase Supply: Strategic Minerals Supply by Region Mine Supply Canada European Union 23% 10% United States 49% 39% 41% 38% South Africa Russia Rest of World Primary mine production Platinum by-pro
Slide 6: Investment Highlights
Investment Highlights TSXV: PDM OTCQB: NKORF Provides Leverage to Green Transportation Battery Electric; Hybrid; Hydrogen Fuel Cell; & Clean ICE Large PGE-Copper-Nickel Project in Tier 1 Jurisdiction Läntinen Koillismaa (LK) is an open pit deposit 566,000 Pd_Eq ounces of Indicated Resource
Slide 7: Project Portfolio Overview: Finland
Project Portfolio Overview: Finland TSXV: PDM OTCQB: NKORF LÄNTINEN KOILLISMAA (“LK”) KOSTONJÄRVI (“KS”) • ~38 km (3,674 hectares) of favourable basal contact. • 20,000 hectares of prospective feeder dyke. • Disseminated sulphides. • High-grade massive magmatic sulphide target • NI 43-101 open pit c
Slide 8: LK: Open Pit Disseminated Sulphide
LK: Open Pit Disseminated Sulphide TSXV: PDM OTCQB: NKORF • Hosted by the laterally extensive basal phase of Koillismaa Complex • Post intrusion deformation has extensively exposed favourable basal phase at surface • High-tenor, palladium dominated sulphide (3Pd:1Pt) Cross section of the original sh
Slide 9: LK Project: Rock Types and Property Outline
LK Project: Rock Types and Property Outline TSXV: PDM OTCQB: NKORF • Exploration Permits outlined in yellow, reservations in red, 2020 geophysics program (IP and Mag) in blue A new Kaukua Area NI43-101 resource scheduled for Q1 2022 * Pd_Eq calculated using prices: $1,600/oz Pd, $1,100/oz Pt, $1,650
Slide 10: LK: Open Along Strike and Down Plunge
LK: Open Along Strike and Down Plunge TSXV: PDM OTCQB: NKORF Yellow outline = existing NI43-101 MRE, 22 million tonnes Target 100+ million tonnes in Greater Kaukua Area Red outline = Q1 2022 MRE area Resource definition drilling completed. * Pd_Eq calculated using prices: $1,600/oz Pd, $1,10
Slide 11: LK: Mineralized Area Remains Unconstrained
LK: Mineralized Area Remains Unconstrained TSXV: PDM OTCQB: NKORF * Pd_Eq calculated using prices: $1,600/oz Pd, $1,100/oz Pt, $1,650/oz Au, $3.50 Cu, and $7.50 Ni 11
Slide 12: Metallurgy @ Kaukua Area: Results in Q4
Metallurgy @ Kaukua Area: Results in Q4 TSXV: PDM OTCQB: NKORF • LK is a disseminated, palladium-rich, high tenor sulphide deposit • Preliminary metallurgical work demonstrated salable concentrate by bulk floatation • Final concentrate grades of 16-17% Cu+Ni have been obtained • MgO below 4%, no sme
Slide 13: KS: Gravity and Magnetic Anomalies
KS: Gravity and Magnetic Anomalies TSXV: PDM OTCQB: NKORF • At 100% sulphide, LK hosts ~58 g/t palladium, ~84 g/t total-precious-metals (TPM), 10% nickel and 13% copper. • High tenor LK mineralization suggests massive sulphides could be very high value. • 3,000 m GTK hole in progress, first to test
Slide 14: Tyko Sulphide Copper-Nickel Project
Tyko Sulphide Copper-Nickel Project TSXV: PDM OTCQB: NKORF Multi-line VTEM anomalies highlighted by dashed black lines, known nickel-copper showings in yellow triangles • High-Grade Sulphide Nickel discovery • Property 250 km2 - 25,000 hectares • 9.9% Ni_eq (23% Cu_eq) over 3.8m at surface • 55km NE
Slide 15: Smoke Lake: High-Grade Discovery
Smoke Lake: High-Grade Discovery TSXV: PDM OTCQB: NKORF • 9.9% Nickel_eq • 218 lbs/tonne • 23% Copper_eq • 30.1 g/t Gold_eq • over 3.8 meters • 9.5% Nickel_eq • 210 lbs/tonne • 22% Copper_eq • 29.5 g/t Gold_eq • Over 1.7 meters • 7.4% Nickel_eq • 164 lbs/tonne • 23.7% Copper_eq • 30.5 g/t Gold_eq •
Slide 16: Tyko Sulphide Nickel-Copper
Tyko Sulphide Nickel-Copper TSXV: PDM OTCQB: NKORF Archean mafic-ultramafic intrusion. • Indications of active feeder-type system - abundant rip-up clasts. • Metamorphosed gabbro and pyroxenite, intruded by later granitoid rocks. • Nickel-rich - Ni:Cu ratio of ~2:1 • Massive magmatic sulphides (Smok
Slide 17: Tyko Nickel-Copper
Tyko Nickel-Copper TSXV: PDM OTCQB: NKORF Significant Soil Survey Significant, multi-line VTEM anomalies. Results Up to 891 ppm copper, and 142 ppm cobalt on the Bulldozer South anomaly Up to 519 ppm copper and 139 ppm nickel on the Cupa Lake anomaly Up to 153 ppm copper and 116 ppm nickel on
Slide 18: Investment Highlights
Investment Highlights TSXV: PDM OTCQB: NKORF Provides Leverage to Green Transportation Battery Electric; Hybrid; Hydrogen Fuel Cell; & Clean ICE Large PGE-Copper-Nickel Project in Tier 1 Jurisdiction Läntinen Koillismaa (LK) is an open pit deposit 566,000 Pd_Eq ounces of Indicated Resource
Slide 19: Contact: Derrick Weyrauch, President & CEO
CONTACT: DERRICK WEYRAUCH PRESIDENT & CEO DERRICK@PALLADIUMONEINC.COM FOLLOW US ON @PALLADIUM_ONE PALLADIUM-ONE-MINING TSX-V: PDM OTC: NKORF FRA: 7N11 19
Slide 20: Finland
Finland TSXV: PDM OTCQB: NKORF Fraser Institute Ranking #1 Globally – Mining Policy #2 Globally – Investment Attractiveness Local mining history Existing infrastructure decreases development capital Paved road(s) access Railway High-voltage power on property Labour, Skilled Trades
Slide 21: Kaukua: NI43-101 Resource Estimate
Kaukua: NI43-101 Resource Estimate TSXV: PDM OTCQB: NKORF • 566,000 Pd_Eq ounces of Indicated Resources (1.60 g/t Pd_Eq, 11 million tonnes)** • 459,000 Pd_Eq ounces of Inferred Resources (1.31 g/t Pd_Eq, 11 million tonnes)** • Low 3:1 strip ratio • Low cost open pit Whittle Pit Optimization Assumpti
Slide 22: Haukiaho: NI43-101 Resource Estimate
Haukiaho: NI43-101 Resource Estimate TSXV: PDM OTCQB: NKORF • 1,210,000 Pd_Eq ounces of Inferred Resources (1.15 g/t Pd_Eq, 32.7 million tonnes) • Low 1:1 strip ratio • Low cost, optimized, open pit Whittle Pit Optimization Assumptions Value Currency USD Royalties n/a Processing cost (incl. G&A) $15
Slide 23: Finland: Elephant Country Geology
Finland: Elephant Country Geology TSXV: PDM OTCQB: NKORF • The Fennoscandia shield hosts a wealth of Cu-Ni-PGE deposits • Includes world class deposits such as Pechenga (nickel) and Suhanko (palladium) Koillismaa Complex including the LK & KS Projects 23
Slide 24: Palladium & Environmental Benefits
Palladium & Environmental Benefits TSXV: PDM OTCQB: NKORF Cleaner Air - Reduced Hydrocarbons • Critical in reducing harmful emissions 3-stage auto-catalyst • Stricter environmental standards = increasing demand • Diesel being phased out for gas = increasing demand • Unique properties better suited t
Slide 25: Commodity Price Assumptions
Commodity Price Assumptions TSXV: PDM OTCQB: NKORF $2,500 3 year Avg 2022 2023 2024 2025 LT PDM $2,000 Metal Price (US$/oz) $1,500 $1,000 $500 $1,684 $1,650 $2,087 $1,600 $1,100 $957 - Gold (US$/oz) Palladium (US$/oz) Platinum (US$/oz) $10 3 year Avg 2022 2023 2024 2025 LT PDM $9 $8 Metal Price (US$
Slide 26: Tyko Assay Results: Phase II Drill Program
Tyko Assay Results: Phase II Drill Program TSXV: PDM OTCQB: NKORF Table 1: Tyko 2021 Phase II Drill Results from the Smoke Lake Zone PGE g/t From Width Ni_Eq Cu_E Au_Eq Ni Cu Co (Pd+Pt+ Pd Pt Hole (m) To (m) (m) % q% g/t* % % % Au) g/t g/t TK21-029 30.4 37.0 6.6 3.97 9.25 12.29 3.08 1.59 0.04 0.56 0
Palladium One Mining — Investor Presentation (March 2022) on 6ix