Gt Resources Inc · TSXV:GT

Gt Resources — Palladium One Mining — Investor Presentation (March 2022)

26 slides from Gt Resources's investor presentation, March 2022

  1. Slide 1: Corporate Presentation March 2022

    CORPORATE PRESENTATION MARCH 2022 TSX-V: PDM OTCQB: NKORF FRA: 7N11 1

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements TSXV: PDM OTCQB: NKORF This presentation contains certain forward-looking statements that may involve a number of risks and uncertainties. Actual events or results could differ materially from Palladium One Mining Inc’s (the “Company”) expectations and projections. The TSX

  3. Slide 3: Leadership Team

    Leadership Team TSXV: PDM OTCQB: NKORF Derrick Weyrauch, CPA CA Neil Pettigrew, M.Sc., P.Geo Dr. Peter C. Lightfoot, P.Geo President, CEO and Director VP, Exploration and Director Independent Director (Audit and Comp Committee) • 30+ years of executive and • A geologist with over 20 years of corpora

  4. Slide 4: Corporate Snapshot

    Overview TSXV: PDM OTCQB: NKORF Corporate Snapshot  Portfolio of PGE & “green energy” metal assets  Strong institutional shareholder base  Tier 1 jurisdictions: Finland & Canada  Well financed to advance strategy  Scale to attract a senior partner  Strong share performance Research Coverage Sh

  5. Slide 5: Palladium Market Overview

    Palladium Market Overview TSXV: PDM OTCQB: NKORF Significant Jurisdictional Risk: Major Constraint to Increase Supply: Strategic Minerals Supply by Region Mine Supply Canada European Union 23% 10% United States 49% 39% 41% 38% South Africa Russia Rest of World Primary mine production Platinum by-pro

  6. Slide 6: Investment Highlights

    Investment Highlights TSXV: PDM OTCQB: NKORF  Provides Leverage to Green Transportation  Battery Electric; Hybrid; Hydrogen Fuel Cell; & Clean ICE  Large PGE-Copper-Nickel Project in Tier 1 Jurisdiction  Läntinen Koillismaa (LK) is an open pit deposit  566,000 Pd_Eq ounces of Indicated Resource

  7. Slide 7: Project Portfolio Overview: Finland

    Project Portfolio Overview: Finland TSXV: PDM OTCQB: NKORF LÄNTINEN KOILLISMAA (“LK”) KOSTONJÄRVI (“KS”) • ~38 km (3,674 hectares) of favourable basal contact. • 20,000 hectares of prospective feeder dyke. • Disseminated sulphides. • High-grade massive magmatic sulphide target • NI 43-101 open pit c

  8. Slide 8: LK: Open Pit Disseminated Sulphide

    LK: Open Pit Disseminated Sulphide TSXV: PDM OTCQB: NKORF • Hosted by the laterally extensive basal phase of Koillismaa Complex • Post intrusion deformation has extensively exposed favourable basal phase at surface • High-tenor, palladium dominated sulphide (3Pd:1Pt) Cross section of the original sh

  9. Slide 9: LK Project: Rock Types and Property Outline

    LK Project: Rock Types and Property Outline TSXV: PDM OTCQB: NKORF • Exploration Permits outlined in yellow, reservations in red, 2020 geophysics program (IP and Mag) in blue A new Kaukua Area NI43-101 resource scheduled for Q1 2022 * Pd_Eq calculated using prices: $1,600/oz Pd, $1,100/oz Pt, $1,650

  10. Slide 10: LK: Open Along Strike and Down Plunge

    LK: Open Along Strike and Down Plunge TSXV: PDM OTCQB: NKORF  Yellow outline = existing NI43-101 MRE, 22 million tonnes  Target 100+ million tonnes in Greater Kaukua Area  Red outline = Q1 2022 MRE area  Resource definition drilling completed. * Pd_Eq calculated using prices: $1,600/oz Pd, $1,10

  11. Slide 11: LK: Mineralized Area Remains Unconstrained

    LK: Mineralized Area Remains Unconstrained TSXV: PDM OTCQB: NKORF * Pd_Eq calculated using prices: $1,600/oz Pd, $1,100/oz Pt, $1,650/oz Au, $3.50 Cu, and $7.50 Ni 11

  12. Slide 12: Metallurgy @ Kaukua Area: Results in Q4

    Metallurgy @ Kaukua Area: Results in Q4 TSXV: PDM OTCQB: NKORF • LK is a disseminated, palladium-rich, high tenor sulphide deposit • Preliminary metallurgical work demonstrated salable concentrate by bulk floatation • Final concentrate grades of 16-17% Cu+Ni have been obtained • MgO below 4%, no sme

  13. Slide 13: KS: Gravity and Magnetic Anomalies

    KS: Gravity and Magnetic Anomalies TSXV: PDM OTCQB: NKORF • At 100% sulphide, LK hosts ~58 g/t palladium, ~84 g/t total-precious-metals (TPM), 10% nickel and 13% copper. • High tenor LK mineralization suggests massive sulphides could be very high value. • 3,000 m GTK hole in progress, first to test

  14. Slide 14: Tyko Sulphide Copper-Nickel Project

    Tyko Sulphide Copper-Nickel Project TSXV: PDM OTCQB: NKORF Multi-line VTEM anomalies highlighted by dashed black lines, known nickel-copper showings in yellow triangles • High-Grade Sulphide Nickel discovery • Property 250 km2 - 25,000 hectares • 9.9% Ni_eq (23% Cu_eq) over 3.8m at surface • 55km NE

  15. Slide 15: Smoke Lake: High-Grade Discovery

    Smoke Lake: High-Grade Discovery TSXV: PDM OTCQB: NKORF • 9.9% Nickel_eq • 218 lbs/tonne • 23% Copper_eq • 30.1 g/t Gold_eq • over 3.8 meters • 9.5% Nickel_eq • 210 lbs/tonne • 22% Copper_eq • 29.5 g/t Gold_eq • Over 1.7 meters • 7.4% Nickel_eq • 164 lbs/tonne • 23.7% Copper_eq • 30.5 g/t Gold_eq •

  16. Slide 16: Tyko Sulphide Nickel-Copper

    Tyko Sulphide Nickel-Copper TSXV: PDM OTCQB: NKORF Archean mafic-ultramafic intrusion. • Indications of active feeder-type system - abundant rip-up clasts. • Metamorphosed gabbro and pyroxenite, intruded by later granitoid rocks. • Nickel-rich - Ni:Cu ratio of ~2:1 • Massive magmatic sulphides (Smok

  17. Slide 17: Tyko Nickel-Copper

    Tyko Nickel-Copper TSXV: PDM OTCQB: NKORF Significant Soil Survey Significant, multi-line VTEM anomalies. Results  Up to 891 ppm copper, and 142 ppm cobalt on the Bulldozer South anomaly  Up to 519 ppm copper and 139 ppm nickel on the Cupa Lake anomaly  Up to 153 ppm copper and 116 ppm nickel on

  18. Slide 18: Investment Highlights

    Investment Highlights TSXV: PDM OTCQB: NKORF  Provides Leverage to Green Transportation  Battery Electric; Hybrid; Hydrogen Fuel Cell; & Clean ICE  Large PGE-Copper-Nickel Project in Tier 1 Jurisdiction  Läntinen Koillismaa (LK) is an open pit deposit  566,000 Pd_Eq ounces of Indicated Resource

  19. Slide 19: Contact: Derrick Weyrauch, President & CEO

    CONTACT: DERRICK WEYRAUCH PRESIDENT & CEO DERRICK@PALLADIUMONEINC.COM FOLLOW US ON @PALLADIUM_ONE PALLADIUM-ONE-MINING TSX-V: PDM OTC: NKORF FRA: 7N11 19

  20. Slide 20: Finland

    Finland TSXV: PDM OTCQB: NKORF  Fraser Institute Ranking  #1 Globally – Mining Policy  #2 Globally – Investment Attractiveness  Local mining history  Existing infrastructure decreases development capital  Paved road(s) access  Railway  High-voltage power on property  Labour, Skilled Trades

  21. Slide 21: Kaukua: NI43-101 Resource Estimate

    Kaukua: NI43-101 Resource Estimate TSXV: PDM OTCQB: NKORF • 566,000 Pd_Eq ounces of Indicated Resources (1.60 g/t Pd_Eq, 11 million tonnes)** • 459,000 Pd_Eq ounces of Inferred Resources (1.31 g/t Pd_Eq, 11 million tonnes)** • Low 3:1 strip ratio • Low cost open pit Whittle Pit Optimization Assumpti

  22. Slide 22: Haukiaho: NI43-101 Resource Estimate

    Haukiaho: NI43-101 Resource Estimate TSXV: PDM OTCQB: NKORF • 1,210,000 Pd_Eq ounces of Inferred Resources (1.15 g/t Pd_Eq, 32.7 million tonnes) • Low 1:1 strip ratio • Low cost, optimized, open pit Whittle Pit Optimization Assumptions Value Currency USD Royalties n/a Processing cost (incl. G&A) $15

  23. Slide 23: Finland: Elephant Country Geology

    Finland: Elephant Country Geology TSXV: PDM OTCQB: NKORF • The Fennoscandia shield hosts a wealth of Cu-Ni-PGE deposits • Includes world class deposits such as Pechenga (nickel) and Suhanko (palladium) Koillismaa Complex including the LK & KS Projects 23

  24. Slide 24: Palladium & Environmental Benefits

    Palladium & Environmental Benefits TSXV: PDM OTCQB: NKORF Cleaner Air - Reduced Hydrocarbons • Critical in reducing harmful emissions 3-stage auto-catalyst • Stricter environmental standards = increasing demand • Diesel being phased out for gas = increasing demand • Unique properties better suited t

  25. Slide 25: Commodity Price Assumptions

    Commodity Price Assumptions TSXV: PDM OTCQB: NKORF $2,500 3 year Avg 2022 2023 2024 2025 LT PDM $2,000 Metal Price (US$/oz) $1,500 $1,000 $500 $1,684 $1,650 $2,087 $1,600 $1,100 $957 - Gold (US$/oz) Palladium (US$/oz) Platinum (US$/oz) $10 3 year Avg 2022 2023 2024 2025 LT PDM $9 $8 Metal Price (US$

  26. Slide 26: Tyko Assay Results: Phase II Drill Program

    Tyko Assay Results: Phase II Drill Program TSXV: PDM OTCQB: NKORF Table 1: Tyko 2021 Phase II Drill Results from the Smoke Lake Zone PGE g/t From Width Ni_Eq Cu_E Au_Eq Ni Cu Co (Pd+Pt+ Pd Pt Hole (m) To (m) (m) % q% g/t* % % % Au) g/t g/t TK21-029 30.4 37.0 6.6 3.97 9.25 12.29 3.08 1.59 0.04 0.56 0

Palladium One Mining — Investor Presentation (March 2022) on 6ix