Zeotech Limited · ASX:ZEO

Zeotech — Shareholder Meeting (November 2026)

15 slides from Zeotech's shareholder meeting presentation, Nov 12, 2026

  1. Slide 1: AGM Presentation

    Slide 1: AGM Presentation

    rsonal use only AGM Presentation 12 November 2026 ASX: ZEO www.zeotech.com.au

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer These Presentation Materials are for information purposes only. They do not comprise a prospectus, product disclosure The production targets and forecast financial information in the PFS were based on the June 2025 Mineral Resource. They statement, or other offering document under Austral

  3. Slide 3: Corporate Snapshot

    Slide 3: Corporate Snapshot

    Corporate Snapshot $153m $0.075 2.05Bn rsonal use only $6.6m 0.055-0.092c Market Cash position1 Share price Shares on issue 52-week range capitalisation Share price and volume Board & Management 0.10 20 18 0.09 16 Sylvia Tulloch James Marsh 0.08 14 Non-Executive Chair Chief Executive Officer 12 0.07

  4. Slide 4: Toondoon Kaolin Project

    Slide 4: Toondoon Kaolin Project

    Toondoon Kaolin Project The cornerstone of Zeotech’s Kaolin DSO and AusPozz production strategy rsonal use only 2026 Delivered 2027 Next Resource Key approvals Mine plan and Final Site First DSO Customer upgrade secured logistics approvals infrastructure exports qualification ~4,000 m of drilling Mi

  5. Slide 5: Australia's largest Kaolin DSO offtake agreement

    Slide 5: Australia's largest Kaolin DSO offtake agreement

    Australia’s largest Kaolin DSO offtake agreement¹ Australia’s highest-grade known raw ore kaolin resource held under an approved Mining Lease rsonal use only Contracted offtake volumes (kt) Kaolin DSO Cosmetic Kaolin DSO >$200m >45% sales, initial 5-year rolling average margin4 offtake2 210 kt 200 k

  6. Slide 6: Updated Mineral Resource Estimate (2026)

    Slide 6: Updated Mineral Resource Estimate (2026)

    Updated Mineral Resource Estimate (2026) Resource more than doubles – supporting the evaluation of a multi-decade AusPozz project rsonal use only Total Mineral Resource Measured + Indicated AusPozz Theoretical Feed Drillhole database 45.6 Mt 36.7 Mt 29.9 Mt 246 holes +124% on 2025 MRE +100% on 2025

  7. Slide 7: Mineral Resource up 124% to 45.6 Mt

    Slide 7: Mineral Resource up 124% to 45.6 Mt

    Mineral Resource up 124% to 45.6 Mt Mineral Resource by lithology, 2025 vs 2026 (Mt) rsonal use only 2025 MRE 4.6 6.6 2.2 3.0 4.0 20.4 Mt 45.6 Mt 2026 MRE 15.6 13.8 2.1 4.4 9.8 +25.2 Mt · +124% Bauxitic Kaolin Grey Kaolin Pink Kaolin White Kaolin Sandy Kaolin +11.0 Mt +7.2 Mt −0.1 Mt +1.4 Mt +5.8 Mt

  8. Slide 8: Mineral Resource by JORC Classification

    Slide 8: Mineral Resource by JORC Classification

    Mineral Resource by JORC Classification Measured and Indicated Resource doubles rsonal use only Measured + Indicated 2025 MRE 2026 MRE 22.3 14.4 36.7 Mt 11.8 +18.3 Mt or 100% 8.9 80% of the 2026 MRE is in 6.6 the high-confidence Measured and Indicated categories 2.0 Measured Indicated Inferred + 117

  9. Slide 9: 29.9 Mt of Theoretical AusPozz Feed and 20-Yrs DSO

    Slide 9: 29.9 Mt of Theoretical AusPozz Feed and 20-Yrs DSO

    29.9 Mt of Theoretical AusPozz Feed and 20-Yrs DSO From Mineral Resource to commercialisation rsonal use only 2026 Mineral Resource Estimate (Mt) 45.6 Mt AusPozz Feedstock 29.9 3.1 12.6 20-yr DSO Resource below product cutoffs AusPozz Theoretical Feedstock by Lithology (Mt) 29.9 Mt +104% (15.2 Mt) 1

  10. Slide 10: AusPozz Project

    Slide 10: AusPozz Project

    AusPozz Project Leading the transition to high-performance, low-carbon building materials rsonal use only 2026 Delivered 2027 Next Industry Paste-backfill Mining Commercial Testing and Project collaboration results applications supply specification demonstrations Expanded industry Independent test D

  11. Slide 11: AusPozz technical advantages

    Slide 11: AusPozz technical advantages

    AusPozz technical advantages Lower carbon footprint and multiple performance benefits1 rsonal use only 79% >50% strength gain (UCS)2 with less cement, reduction in embodied carbon vs cement lowering cost per m3 ↑ IMPROVES ↓ REDUCES Durability – eliminates concrete cancer for Shrinkage longer asset l

  12. Slide 12: Market Opportunity

    Slide 12: Market Opportunity

    Market Opportunity A large, policy-driven market for proven, standards-compliant metakaolin rsonal use only 8% ~30M m³ >10 Mt of global CO2 emissions come from of concrete used in Australia each year, of cement is consumed in Australia each cement production1 the immediate addressable market2 year t

  13. Slide 13: Broad Economic, Environmental & Social Benefits

    Slide 13: Broad Economic, Environmental & Social Benefits

    Broad Economic, Environmental & Social Benefits Powering Low-Cost Decarbonisation, Economic Growth, and Resilient Regional Communities rsonal use only DECARBONISATION COMPETITIVENESS REGIONAL RESILIENCE INNOVATION PRODUCTIVITY 230–590 kt Lower costs ~249 jobs Longer life Cost relief CO₂-e removed pe

  14. Slide 14: Landfill Methane Control

    Slide 14: Landfill Methane Control

    Landfill Methane Control Developing the zeoteCH₄® product as a technology for controlling landfill methane emissions rsonal use only 2026 Delivered1 2027 Next Live field trial 92% methane Positive patent Extended Additional landfill National-phase complete reduction search report monitoring trials p

  15. Slide 15: Thank you

    Slide 15: Thank you

    rsonal use only Thank you PRESENTED BY James Marsh Chief Executive Officer www.zeotech.com.au | ASX: ZEO

Source: ASX announcement, Nov 12, 2026

More decks from Zeotech Limited

All 21 Zeotech decks