Titan Minerals Ltd · ASX:TTM
Titan Minerals — Investor Presentation (March 2026)
25 slides from Titan Minerals's investor presentation, March 2026
Slide 1: Dynasty Gold Project
Dynasty Gold Project Rapidly Growing 3.9M ounces Gold & 26.1M ounces Silver Ecuador’s Next Major Gold Camp Significant upside remaining Investor Presentation | March 2026 ASX:TTM This presentation is released with the authority of the board of Titan Minerals Ltd.
Slide 2: Disclaimer and Cautionary Statements
Disclaimer and Cautionary Statements SUMMARY INFORMATION This document contains a summary of information about Titan and its activities that is current as at the date of this document. The information in this document is general in nature and does not purport to be complete or to contain all the inf
Slide 3: Disclaimer and Cautionary Statements
Disclaimer and Cautionary Statements METAL EQUIVALENT VALUES – REQUIREMENTS UNDER THE JORC CODE Copper Equivalent. Assumed commodity prices for calculation of Copper Equivalent (Cu Eq) is Cu US$4.50/lb, Au US$3,000/oz, Mo: US$15/lb and Ag US$35/oz. Recoveries are assumed from similar deposits: Cu =
Slide 4: Investment Highlights
Investment Highlights Emerging large-scale gold developer and porphyry copper optionality 100% Owned Dynasty Gold Project Big Copper Potential Across Multiple Projects/ Resource of 3.9Moz gold @ 1.85 g/t Au & 26.1Moz Hancock spending up to US$120M to earn 80% of silver @ 12.38 g/t Ag extending f
Slide 5: Corporate Snapshot
Corporate Snapshot │ ASX: TTM Strong balance sheet provides clear pathway to growth and development Share Price1 Market Capitalisation Total Shares on Issue A$1.02 A$291M 287.5M Net Cash 2 Enterprise Value Options on Issue A$17.2M A$274M 26M EV ~A$70/oz gold Institutions 23% Other 32% 6 month share
Slide 6: Board & Management Team
Board & Management Team Proven track record in discovery, development, mine operation and deal making PETER COOK MATTHEW CARR BARRY BOURNE NON- EXECUTIVE CHAIRMAN EXECUTIVE DIRECTOR NON-EXEC DIRECTOR Geologist & Mineral Economist Entrepreneur & Project Geologist and Geophysicist Developer +35 years'
Slide 7: Highly prospective projects in Andean copper belt
Highly prospective projects in Andean copper belt Exposure to meaningful scale copper and gold DYNASTY GOLD PROJECT (100%) Key Infrastructure & Permits • Resource/ Pre-Development Stage Infrastructure rich and workforce ready • Gold-Silver-Copper Permits in place for drilling and small-scale min
Slide 8: Ecuador- Rich in Infrastructure and Natural Resources
Ecuador- Rich in Infrastructure and Natural Resources Ports, highways, hydropower, two large-scale commercial mines in operation Key Infrastructure for Mining Logistics in Southern Ecuador Daily flights from Quito Pan-American and coastal Highway network connecting to infrastructure and ports
Slide 9: Ecuador: An Emerging Tier 1 Mining Jurisdiction
Ecuador: An Emerging Tier 1 Mining Jurisdiction Chinese investment has surged, driven by strategic interests in securing gold and critical minerals May 2025: Solaris Resources Inc. secured a US$200 million financing package from Royal Gold to advance its Warintza copper- gold-moly project, with M&
Slide 10: Re-rate Driven by Third Party Endorsement
Re-rate Driven by Third Party Endorsement Significant Value Added, But Not Yet Realised 2023-2025 TTM Value Add & Derisking: • Project wide surface geochemistry and mapping at Dynasty, 2020-2023- TTM Value Add: Linderos & Copper Duke Dynasty MRE • Complete overhaul of company management and systems
Slide 11: DYNASTY GOLD PROJECT (100%)
DYNASTY GOLD PROJECT (100%) TITAN MINERALS LTD ASX: TTM 11
Slide 12: Dynasty Gold Project: 3.9Moz gold & 26.1Moz silver and growing
Dynasty Gold Project: 3.9Moz gold & 26.1Moz silver and growing A meaningful standalone development with significant scope to grow 100% Owned Dynasty Gold Project Large high-grade epithermal gold and copper-gold porphyry system hosting 3.9Moz gold and 26.1Moz silver Potential for large scale, lon
Slide 13: Dynasty: MRE Update Delivers 25% growth in Contained Ounces of Gold
Dynasty: MRE Update Delivers 25% growth in Contained Ounces of Gold Robust resources set for conversion and growth Cerro Verde prospect- contains 70% of MRE MRE of 2.7Moz gold and 16.2Moz silver @ 1.66 g/t Au, 9.89 g/t Ag MRE growth of 0.8Moz Au and 4.1M oz silver, an increase of 41% gold and 34
Slide 14: Dynasty: Early Mining Optionality with Large Oxide Resource
Dynasty: Early Mining Optionality with Large Oxide Resource Dynasty MRE fully permitted for small-scale mining (~1Mtpa) Oxide resources at Cerro Verde total 12.1Mt @ 1.88 g/t Au, 11.20 g/t Ag for 734k ounces of gold and 4.37M oz silver, for 27% of the MRE Dynasty total MRE sits across three mine
Slide 15: Dynasty: Porphyry System Growing
Dynasty: Porphyry System Growing Porphyry hosted gold-silver +/- copper unveiled in recent drilling from surface at Cerro Verde Porphyry Drill Intersections 102.7m @ 1.6 g/t Au Eq. from 46.5m in CVD072 216.6m @ 0.6 g/t Au Eq. from 4m in CVDD25-157 159.9m @ 0.7 g/t Au Eq. from 2.1m in CVDD25-18
Slide 16: Dynasty: The Porphyry Upside
Dynasty: The Porphyry Upside New porphyry targets unveiled and set to be tested Multiple Untested Gold and Copper Targets Mineralisation across all MRE deposits remains ‘open’ 30,000m of drilling planned to target further MRE growth, both total ounces across the project, and Indicated ounces at
Slide 17: Dynasty: Key Derisking Workstreams Completed
Dynasty: Key Derisking Workstreams Completed Updated MRE to drive upcoming mine studies and scoping study for Dynasty Dynasty Ore Specimens A Mineral Resource Estimate Update MRE update complete Next steps- Infill drilling to maximise Indicated resources within pit optimisation Infrastructur
Slide 18: Social, Environmental and Corporate Governance at the Fore
Social, Environmental and Corporate Governance at the Fore Commitment to transparency, education, employment and inclusion ENVIRONMENTAL RESPECT BIG IDEAS 1 Responsible exploration ensuring minimal disturbance to 3 Exploring blue-sky opportunities in fertile systems for native vegetation and natural
Slide 19: COPPER PROJECTS
COPPER PROJECTS TITAN MINERALS LTD ASX: TTM 19
Slide 20: Linderos Copper Project (70% TTM/ 30% Hancock)
Linderos Copper Project (70% TTM/ 30% Hancock) Hancock Prospecting to spend up to US$120M to earn 80% % % Earned Earn-in Status Commitment1 Earned (cumulat Period ive) (years) Activities Expenditure USD - $2M 5% 5% 0 COMPLETE 10,000m drilling $8M 25% 30% 3 COMPLETE 15,000m drilling $12M 21% 51% 7 UN
Slide 21: Copper Duke Project (100%)
Copper Duke Project (100%) Potential tier 1 porphyry copper discovery set to be unveiled 7km porphyry alteration footprint highlighted by multiple datasets Same magma type as global Tier 1 porphyry systems and mineralisation the same age as mega-porphyry copper deposits of Peru Multiple outcro
Slide 22: Forward Value Drivers
Forward Value Drivers TITAN MINERALS LTD ASX: TTM 22
Slide 23: Our Strategy
Our Strategy Build a +5Moz standalone gold mine & deliver non-dilutive porphyry copper discoveries GOLD COPPER Growth and Value Add Discovery through JV Partnerships Focus on initial open pit 10-15 year mine life and 1 Secure JV partners to fund porphyry copper complete drilling and studies to achie
Slide 24: Milestones & Objectives
Milestones & Objectives Poised for growth with a strategic partner, strong funding, drilling underway and gold at all time highs • 3.9Moz Mineral Resource Estimate • Strong discovery potential through • Feasibility studies to understand • Growth of 0.8Moz (25%) over 14 aggressive exploration program
Slide 25: @titanminerals info@titanminerals.com.au
@titanminerals info@titanminerals.com.au +61 8 6555 2950