Titan Minerals Ltd · ASX:TTM

Titan Minerals — Investor Presentation (August 2026)

23 slides from Titan Minerals's investor presentation, August 2026

  1. Slide 1: Dynasty Gold Project

    Dynasty Gold Project Rapidly Growing 3.9M ounces Gold & 26.1M ounces Silver Ecuador’s Next Major Gold Camp Significant upside remaining Investor Presentation | August 2026 ASX:TTM This presentation is released with the authority of the board of Titan Minerals Ltd.

  2. Slide 2: Disclaimer and Cautionary Statements

    Disclaimer and Cautionary Statements SUMMARY INFORMATION This document contains a summary of information about Titan and its activities that is current as at the date of this document. The information in this document is general in nature and does not purport to be complete or to contain all the inf

  3. Slide 3: Disclaimer and Cautionary Statements

    Disclaimer and Cautionary Statements METAL EQUIVALENT VALUES – REQUIREMENTS UNDER THE JORC CODE Copper Equivalent. Assumed commodity prices for calculation of Copper Equivalent (Cu Eq) is Cu US$4.50/lb, Au US$3,000/oz, Mo: US$15/lb and Ag US$35/oz. Recoveries are assumed from similar deposits: Cu =

  4. Slide 4: Investment Highlights

    Investment Highlights Emerging large-scale gold developer with copper optionality 100% Owned Dynasty Gold Project Big Copper Potential Across Multiple Projects ▪ Total Resource of 3.9Moz gold @ 1.85 g/t Au & ▪ Hancock spending up to US$120M to earn 80% of 26.1Moz silver @ 12.38 g/t Ag Linderos Coppe

  5. Slide 5: Corporate Snapshot │ ASX: TTM

    Corporate Snapshot │ ASX: TTM Strong balance sheet provides clear pathway to growth and development Share Price1 Market Capitalisation Total Shares on Issue A$0.74 A$206M 288M Net Cash 2 Enterprise Value Options on Issue A$8.5M A$198M 26M EV ~A$50/oz gold Institutions 23% Other 32% 3 month share pri

  6. Slide 6: Board & Management Team

    Board & Management Team Proven track record in discovery, development, mine operation and deal making PETER COOK MATTHEW CARR BARRY BOURNE NON- EXECUTIVE CHAIRMAN EXECUTIVE DIRECTOR NON-EXEC DIRECTOR Geologist & Mineral Economist Entrepreneur & Project Developer Geologist and Geophysicist • 40 years

  7. Slide 7: Highly prospective projects in Andean copper belt, Ecuador

    Highly prospective projects in Andean copper belt, Ecuador DYNASTY GOLD PROJECT (100%) Infrastructure in place to support growing mining industry • Resource/ Pre-Development Stage • Gold-Silver-Copper Exploration & Small-Scale Mining Permits ▪ Permits in place for drilling and small-scale mining LIN

  8. Slide 8: Ecuador: An Emerging Tier 1 Mining Jurisdiction

    Ecuador: An Emerging Tier 1 Mining Jurisdiction Investment has surged, driven by strategic interest in securing gold and critical minerals ▪ Dec 2025: Jiangxi Copper Corporation launched takeover bid for SolGold at a 43% premium to the share price, which had seen a 300% appreciation in 12 months! Ca

  9. Slide 9: DYNASTY GOLD PROJECT (100%)

    DYNASTY GOLD PROJECT (100%) TITAN MINERALS LTD ASX: TTM 9

  10. Slide 10: Dynasty Gold Project: 3.9Moz gold & 26.1Moz silver and growing

    Dynasty Gold Project: 3.9Moz gold & 26.1Moz silver and growing 100% owned, scale, growth… Long Section SE 100% Owned Dynasty Gold Project ▪ 3.9Moz gold and high-grade epithermal gold system Plan View Cerro Verde Deposit ▪ Potential for large scale, low cost, long life open pit mine ▪ Significant sco

  11. Slide 11: Dynasty: MRE Update Delivers Strong Growth at Cerro Verde

    Dynasty: MRE Update Delivers Strong Growth at Cerro Verde Robust resources set for further growth and conversion ▪ March 2026 resource delivered increase of 41% gold Cerro Verde Deposit and 34% silver, at a discovery cost of ~US$6.30/oz gold ▪ Cerro Verde deposit contains 70% of resources- 50Mt @ 1.

  12. Slide 12: Cerro Verde Extensional Drilling Delivers New Discovery

    Cerro Verde Extensional Drilling Delivers New Discovery Latest results point towards much larger mineral system with strong northwest structural control ▪ Extensive zone of shear and vein hosted gold-silver mineralisation discovered, returning a significant intercept of 33.5m @ 6.6 g/t Au, 55.5 g/t

  13. Slide 13: Dynasty: Porphyry System Growing

    Dynasty: Porphyry System Growing Porphyry hosted gold-silver +/- copper mineralisation from surface at Cerro Verde Cerro Verde Long Section Significant Porphyry Drill Intersections ▪ 102.7m @ 1.6 g/t Au Eq. from 46.5m in CVD072 ▪ 216.6m @ 0.6 g/t Au Eq. from 4m in CVDD25-157 ▪ 159.9m @ 0.7 g/t Au Eq

  14. Slide 14: Dynasty: The Porphyry Upside

    Dynasty: The Porphyry Upside New porphyry copper targets unveiled and set to be tested Multiple Untested Gold and Copper Targets ▪ Mineralisation across all MRE deposits remains ‘open’ ▪ 30,000m of drilling planned to target further resource growth and upgrades ▪ All permits in place and full flexib

  15. Slide 15: Dynasty: Key Derisking Workstreams Completed

    Dynasty: Key Derisking Workstreams Completed Updated MRE to drive upcoming mine studies and scoping study for Dynasty Mineral Resource Estimate Update Environmental Baseline Studies ▪ MRE update complete in March 2026, next MRE ▪ Routine monitoring of soil, water, stream sediment, update planned for

  16. Slide 16: Social, Environmental and Corporate Governance at the Fore

    Social, Environmental and Corporate Governance at the Fore Commitment to transparency, education, employment and inclusion ENVIRONMENTAL RESPECT BIG IDEAS 1 Responsible exploration ensuring minimal disturbance to 3 Exploring blue-sky opportunities in fertile systems for native vegetation and natural

  17. Slide 17: COPPER PROJECTS

    COPPER PROJECTS TITAN MINERALS LTD ASX: TTM 17

  18. Slide 18: Linderos Copper Project (49% TTM/ 51% Hancock)

    Linderos Copper Project (49% TTM/ 51% Hancock) Hancock Prospecting to spend up to US$120M to earn 80% % % Earn-in Status Commitment1 Earned Earned Period (cumula (years) Activities Expenditure tive) USD - $2M 5% 5% 0 COMPLETE 10,000m drilling $8M 25% 30% 3 COMPLETE 15,000m drilling $12M 21% 51% 7 CO

  19. Slide 19: Copper Duke Project (100%)

    Copper Duke Project (100%) Potential tier 1 porphyry copper discovery set to be unveiled ▪ 7km porphyry alteration footprint highlighted by multiple datasets ▪ Same magma type as global Tier 1 porphyry systems and mineralisation the same age as mega-porphyry copper deposits of Peru ▪ Multiple outcro

  20. Slide 20: Forward Value Drivers

    Forward Value Drivers TITAN MINERALS LTD ASX: TTM 20

  21. Slide 21: Our Strategy

    Our Strategy Build a +5Moz standalone gold mine & deliver non-dilutive porphyry copper discoveries GOLD COPPER Growth and Value Add Discovery through JV Partnerships 1 Focus on initial open pit initial mine life and Secure JV partners to fund porphyry copper complete drilling and studies to achieve

  22. Slide 22: Milestones & Objectives

    Milestones & Objectives Poised for growth with a strategic partner, strong funding, drilling underway and gold at all time highs • 3.9Moz Gold resource • Strong discovery potential through • Feasibility studies to understand • Growth of 0.8Moz (increase of 25% aggressive exploration programs opportu

  23. Slide 23: @titanminerals info@titanminerals.com.au

    @titanminerals info@titanminerals.com.au +61 8 6555 2950

Titan Minerals — Investor Presentation (August 2026) on 6ix