Central Asia Metals Plc · LSE:CAML

Central Asia Metals — H1 2018 Earnings Presentation

40 slides from Central Asia Metals's earnings presentation, September 2018

  1. Slide 1: H1 2018 Results Presentation

    H 1 2 0 1 8 R E S U LT S P R E S E NTAT I O N SEPTEMBER 2018

  2. Slide 2: Disclaimer

    1 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS DISCLAIMER The information contained in this confidential document (“Presentation”) has been prepared by Central Asia Metals plc (the “Company”). It has not been fully verified and is subject to material updating, revision and further amendment

  3. Slide 3: H1 2018 Performance

    2 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS H1 2018 PERFORMANCE ▪ H1 2018 dividend 6.5p (H1 2017: 6.5p) H1 2018 Cu production H1 2018 revenue ▪ Kounrad copper production 6,747t (H1 2017: 7,027t) 6,747t $102.4m ▪ Sasa production ‒ Zinc 11,020t H1 2017: 7,027t H1 2017: $38.6m ‒ Lead 14,386

  4. Slide 4: Operational Review

    3 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS OPERATIONAL REVIEW

  5. Slide 5: CAML CSR Approach

    4 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS CAML CSR APPROACH Health and safety Community ▪ LTI Kounrad, 2 - LTI free hours to end H1 2018, 77,626 ▪ Kounrad Charitable Foundation approached with 29 requests during H1 2018 ▪ LTI Sasa, 2 (sub-contractors) - LTI free hours to end H1 2018, 1

  6. Slide 6: Kounrad, Overview

    5 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS KOUNRAD, OVERVIEW Eastern Dumps ▪ Commenced leaching Q2 2012 ▪ Average dump height 20m, average leach time 8 months ▪ Average copper recovery 45-50% ▪ Leached 65,295t from Eastern Dumps ‒ c.14,000t recoverable remaining Western Dumps ▪ Commence

  7. Slide 7: Western (ILA) and Eastern Dump Resources

    6 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS WESTERN (ILA) AND EASTERN DUMP RESOURCES Western Dumps ILA copper recovery Eastern Dumps 45 40 6 16 35 5 30 7 Cu recovery % 25 20 22 15 2 Actual recovery ( Irrigated 14 blocks ) 10 5 Forecast leach curve 9-10 0 0 100 200 300 400 500 600 700 Lea

  8. Slide 8: Kounrad, Production Update and Outlook

    7 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS KOUNRAD, PRODUCTION UPDATE AND OUTLOOK Copper production 4.5 80 Cumulative copper production (kt) 4.0 70 Quarterly copper production (kt) ▪ 2017 copper production 14,103t 3.5 60 3.0 ▪ H1 2018 copper production 6,747t 2.5 50 40 2.0 ▪ Total coppe

  9. Slide 9: Kounrad, H1 2018 Operational Overview

    8 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS KOUNRAD, H1 2018 OPERATIONAL OVERVIEW H1 2018, stable operations 2012 2013 2014 2015 2016 2017 H1 2018 ▪ H1 2018, 2 LTIs LTI 0 0 1 2 0 0 2 ‒ LTI free hours reset, now 77,626 Cu production, t 6,586 10,509 11,136 12,071 14,020 14,103 6,747 ▪ Prod

  10. Slide 10: H1 2018 Kounrad Copper C1 Cash Cost

    9 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS H1 2018 KOUNRAD COPPER C1 CASH COST H1 2018 C1 cash cost $0.53/lb Processing H1 2018 $/lb H1 2017 $/lb Reagents 0.08 0.06 Local G&A, Power 0.07 0.06 $0.07 Payroll 0.12 0.10 Materials 0.04 0.04 Consulting & other 0.07 0.05 Processing total 0.38

  11. Slide 11: Sasa, Production Update and Outlook

    10 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS SASA, PRODUCTION UPDATE AND OUTLOOK H1 2018 production and sales Units Q1 2018 Q2 2018 H1 2018 2017 Ore mined t 192,372 198,560 390,932 792,068 ▪ Underground ore production 390,932t Plant feed t 196,364 197,241 393,605 793,332 ▪ Zinc in concen

  12. Slide 12: Sasa Production Statistics

    11 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS SASA PRODUCTION STATISTICS 2017 – H1 2018 ore mined 2017 – H1 2018 plant availability 70,000 100 90 60,000 80 plant availability (%) 50,000 70 ore mined (t) 40,000 60 50 30,000 40 20,000 30 20 10,000 10 0 0 2017 – H1 2018 combined grade Produc

  13. Slide 13: H1 2018 Sasa Zinc Eq. C1 Cash Cost

    12 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS H1 2018 SASA ZINC EQ. C1 CASH COST H1 2018 C1 cash cost $0.44/lb Unit costs, Run of Mine (RoM) H1 2018 2017 Processing, Mining, $000 7,449 14,413 Mining , $0.16 $0.08 Processing, $000 3,816 7,499 Local G&A, $000 2,497 5,019 Total operating cos

  14. Slide 14: Sasa for the Future

    13 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS SASA FOR THE FUTURE Mine and processing plant activities ▪ A well capitalised mine ▪ Infrastructure to access stoping block between 830 and 750 levels continued in 2018 ▪ Installation of new SMD mill ▪ Current exploration objective is to repla

  15. Slide 15: Tailings Storage Facility (TSF4)

    14 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS TAILINGS STORAGE FACILITY 4 (TSF4) TSF4 under construction View looking north ▪ Currently using TSF3.2 ▪ Construction of TSF4 commenced TSF3.2 face in Q2 2017 ‒ Completion expected H2 2018 ‒ Designed to contain 6.5+Mt tailings starter wall ‒ S

  16. Slide 16: Shuak Update

    15 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS SHUAK UPDATE 2018 exploration underway ▪ Exploration commenced May 2018 ▪ 19,461m of core hydrotransport (CHT) undertaken, programme now complete ▪ Diamond drilling commenced August 2018, focusing on Kyzyl-Sor oxide potential ‒ 1,050m diamond

  17. Slide 17: Financial Review

    16 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS FINANCIAL REVIEW

  18. Slide 18: H1 2018 Market Conditions

    17 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS H1 2018 MARKET CONDITIONS Post period Copper 8000 end fall in metal prices ▪ Price decreased by 7% to $6,646/t ▪ 2018 broker consensus price $6,878/t (September) 7000 ▪ H1 2018 realised price $6,672/t Zinc 6000 ▪ Price decreased by 11% to $2,9

  19. Slide 19: H1 2018 Income Statement

    18 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS H1 2018 INCOME STATEMENT Increased Group EBITDA reflects Sasa acquisition H1 2018 H1 2017 % $m $m change ▪ H1 2018 results reflect full period for both Kounrad and Sasa Gross revenue 102.4 38.6 +165% ▪ Kounrad ‒ Gross revenue $40.5m (H1 2017:

  20. Slide 20: H1 2018 Cash Costs

    19 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS H1 2018 CASH COSTS Kounrad copper C1 cash cost $0.53/lb H1 2018 H1 2017 2017 $/lb $/lb $/lb ▪ Remains firmly in lowest quartile of industry cash Kounrad copper C1 cash cost 0.53 0.45 0.52 cost curve Sasa zinc eq. C1 cash cost 0.44 - 0.44* ▪ In

  21. Slide 21: H1 2018 Fully Inclusive Cu Eq. Unit Cost

    20 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS H1 2018 FULLY INCLUSIVE CU EQ. UNIT COST H1 2018, $1.51/lb H1 2018 2017* ▪ Sasa and Kounrad fully inclusive copper eq. unit New Historic New Historic method reported method reported cost $1.51/lb $/lb $/lb $/lb $/lb ‒ Increase as a result of i

  22. Slide 22: H1 2018 Capex

    21 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS H1 2018 CAPEX Sasa H1 2018 $m ▪ Major capex items include Total Sasa capex 7.2 ‒ Underground mine development $1.3m ‒ SMD mill, $0.7m - Sasa sustaining capex 3.3 ‒ Granby wagons, $0.2m - Sasa tailings dam construction 3.9 ▪ Construction of new

  23. Slide 23: H1 2018 Balance Sheet

    22 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS H1 2018 BALANCE SHEET Net debt $125.2m H1 2018 2017 $m $m ▪ Group continues to report a strong net asset position at 30 June 2018 PPE 440.6 461.0 ▪ Manageable debt levels Intangible assets 67.2 70.3 Cash 37.6 43.0 ▪ Other liabilities includes

  24. Slide 24: H1 2018 Cash Flow

    23 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS H1 2018 CASH FLOW $m

  25. Slide 25: Delivering Shareholder Value

    24 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS DELIVERING SHAREHOLDER VALUE H1 2018 dividend 6.5p CAML dividend policy 160 $144.1m 140 Total dividend per share 120 since 2012, 83p “CAML will return to shareholders a target 100 range of between 30% and 50% of free cash flow, defined as net

  26. Slide 26: Outlook

    25 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS OUTLOOK ▪ Strong H1 2018 CAML financial performance with EBITDA and EPS accretion demonstrating Sasa acquisition rationale ▪ Attractive cash flow based dividend policy – H1 2018, 6.5p ▪ Two low cost, low capex operations in prospective jurisdi

  27. Slide 27: Investor Relations Contact

    26 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS INVESTOR RELATIONS CONTACT Louise Wrathall 11 Albemarle Street London W1S 4HH louise.wrathall@centralasiametals.com Tel: +44 (0) 20 7898 9001 www.centralasiametals.com

  28. Slide 28: Appendix

    27 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS APPENDIX

  29. Slide 29: CAML Summary Financial Performance

    28 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS CAML SUMMARY FINANCIAL PERFORMANCE Total H1 2018 2017 2016 2015 2014 2013 2012 (74 months) (Sasa 2 months) (8 months) Kounrad Cu production, tonnes 75,173 6,747 14,103 14,020 12,071 11,136 10,509 6,586 Sasa Pb production, tonnes 19,337 14,386

  30. Slide 30: Share Price and Shareholders

    29 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS SHARE PRICE AND SHAREHOLDERS 350 12,000 350 300 300 10,000 250 250 8,000 Copper ($/t) 200 Price (p) 200 Price (p) 6,000 150 150 4,000 100 100 2,000 50 50 0 0 0 Sep 10 May 11 Jan 12 Sep 12 May 13 Jan 14 Sep 14 May 15 Jan 16 Sep 16 May 17 Jan 18

  31. Slide 31: CAML Relative Share Price Performance

    30 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS CAML RELATIVE SHARE PRICE PERFORMANCE 180 160 140 Rebased to 100 120 100 80 60 40 20 0 Jan-18 Feb-18 Mar-18 Apr-18 May-18 Jun-18 Jul-18 Aug-18 Sep-18 CAML ATYM KAZ ANTO GFM TV TECK Source: Peel Hunt

  32. Slide 32: Central Asia Metals Operations

    31 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS CENTRAL ASIA METALS OPERATIONS SHUAK (80%) KAZAKHSTAN 197km2 exploration licence, northern Population, 18.0 million Kazakhstan GDP per capita, $8,837 Potential for copper oxide and sulphide resources Extensively explored in Soviet times 22,000

  33. Slide 33: Board of Directors

    32 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS BOARD OF DIRECTORS

  34. Slide 34: Director Biographies

    33 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS DIRECTOR BIOGRAPHIES NICK CLARKE, CHAIRMAN. Nick has over 40 years of mining experience, including 16 DAVID SWAN, NON-EXECUTIVE DIRECTOR. David is a chartered accountant with years spent within senior management positions in production and tec

  35. Slide 35: Senior Management Biographies

    34 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS SENIOR MANAGEMENT BIOGRAPHIES HOWARD NICHOLSON, TECHNICAL DIRECTOR. Howard is a metallurgist with PAVEL SEMENCHENKO, GENERAL DIRECTOR, KOUNRAD. With over 17 years’ 35 years of experience in project development and mine operations experience of

  36. Slide 36: Corporate Structure

    35 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS CORPORATE STRUCTURE

  37. Slide 37: Kounrad Resource and Technology

    36 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS KOUNRAD RESOURCE AND TECHNOLOGY Category Quantity, Mt Grade (%) Contained copper, kt Eastern Dumps Indicated 89.7 0.10 85.8 Inferred 79.6 0.10 81.7 Total 169.3 0.10 167.5 Western Dumps Indicated 296.4 0.10 282.4 Inferred 181.5 0.09 164.3 Total

  38. Slide 38: Kounrad, PLS and Groundwater Model

    37 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS KOUNRAD, PLS AND GROUNDWATER MODEL

  39. Slide 39: Sasa, Reserves and Resources

    38 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS SASA, RESERVES AND RESOURCES ▪ Sasa is a zinc / lead skarn deposit Category Quantity Grade Contained Mt Pb (%) Zn (%) Ag (g/t) Pb (kt) Zn (kt) Ag (koz) ▪ Ore body dips at approximately 35°, with 2-3 parallel Svinja Reka, Reserves lenses, 1km s

  40. Slide 40: Sasa Processing Flow Sheet

    39 CENTRA L A SIA META LS PLC BUILDING A BIGGER BUSINESS SASA PROCESSING FLOW SHEET LEAD CONDITIONER LEAD ROUGHER AND SCAVENGERS LEAD THICKENER PRIMARY/ SECONDARY CRUSHING ORE FROM LEAD FILTER MINE TO BALL MILL LEAD LEAD CLEANERS CONCENTRATE TO BALL MILL ROD MILL ZINC CONDITIONER ZINC THICKENER ZINC

Central Asia Metals — H1 2018 Earnings Presentation on 6ix