Central Asia Metals PLC · LSE:CAML

Central Asia Metals — Non-Deal Roadshow (November 2026)

33 slides from Central Asia Metals's roadshow presentation, November 2026

  1. Slide 1: Strong cash generation supporting growth and shareholder returns

    Slide 1: Strong cash generation supporting growth and shareholder returns

    November 2026 Strong cash generation supporting growth and shareholder returns Toronto Roadshow

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    DISCLAIMER IMPORTANT – You must read the following before continuing This is a presentation (together with any accompanying documents and oral presentation of these slides, including talks given by the presenters, any question and answer session, and any material distributed in connection with this

  3. Slide 3: Disclaimer

    Slide 3: Disclaimer

    DISCLAIMER Not investment or financial advice This Presentation, and the information in it, does not constitute financial product, legal, tax, accounting or investment advice and is not a recommendation to investors or potential investors. This Presentation, and the information contained within it,

  4. Slide 4: Disclaimer

    Slide 4: Disclaimer

    DISCLAIMER Future performance and forward-looking statements This Presentation contains references to forecasts, estimates, assumptions and other forward-looking statements. Forward-looking statements are often, but not always, identified by the use of words such as "seek", "anticipate", “forecast”,

  5. Slide 5: Disclaimer

    Slide 5: Disclaimer

    DISCLAIMER Market data Certain market data used in connection with or referenced in this Presentation, may have been obtained from public filings, research, surveys or studies contracted by third parties, including as published in industry-specific or general publications. Neither CAML nor its advis

  6. Slide 6: H1 2026 Results Summary

    Slide 6: H1 2026 Results Summary

    H1 2026 RESULTS SUMMARY Safety highlights Group financial highlights Lost-time injuries (LTIs) EBITDA EBITDA margin Kazakhstan North Macedonia 52% 2 $75.5m Copper cathode Zinc-in-concentrate Lead-in-concentrate H1 2025: nil H1 2025: $39.9m H1 2025: 40% production production production 6,304t 9,094t

  7. Slide 7: Growth backed by strong cash flow and proven skills

    Slide 7: Growth backed by strong cash flow and proven skills

    INVESTMENT CASE GROWTH BACKED BY STRONG CASH FLOW AND PROVEN SKILLS GROWTH CASH GENERATION CAPITAL ALLOCATION  A balanced portfolio of  H1 2026 FCF of $46.8m,  Dividend policy of 30-50% growth assets and cash 189% increase YoY of free cash flow generative operations  Group EBITDA margin for  Co

  8. Slide 8: CAML Asset Portfolio

    Slide 8: CAML Asset Portfolio

    CAML ASSET PORTFOLIO Chibougamau Exploration Kounrad Chibougamau CAML Sasa Exploration Aberdeen MEDIUM-TERM GROWTH FROM LONG-TERM GROWTH FROM CASH FLOW GENERATING ASSETS DEVELOPMENT EXPLORATION Two highly cash generative operations producing base High-grade development stage project Expanding portfo

  9. Slide 9: Trading Comparisons – Selected Peers

    Slide 9: Trading Comparisons – Selected Peers

    TRADING COMPARISONS – SELECTED PEERS 8.1x 6.5x 6.3x 5.9x 5.9x 5.0x 4.8x 4.2x EV / 2026E EBITDA 2.1x Trekor Lundin Mining Sandfire Hudbay Capstone Ero Atalaya Median CAML 1.17x 0.89x 0.89x 0.76x 0.78x 0.75x 0.78x CONSENSUS 0.71x 0.62x* P / NAV Capitalization Trekor Lundin Mining Sandfire Hudbay Capst

  10. Slide 10: High-grade copper-gold project in a tier-one jurisdiction

    Slide 10: High-grade copper-gold project in a tier-one jurisdiction

    CHIBOUGAMAU HIGH-GRADE COPPER-GOLD PROJECT IN A TIER-ONE JURISDICTION  Located in Central Québec, approximately 480km due north of Montreal Location  ~10km from local town of Chibougamau; no remote camp required  Collection of five high-grade copper-gold deposits, most of which are located within

  11. Slide 11: Fast tracked for development

    Slide 11: Fast tracked for development

    CHIBOUGAMAU – INFRASTRUCTURE IN PLACE FAST TRACKED FOR DEVELOPMENT CHIBOUGAMAU PROJECT INFRASTRUCTURE  Existing 900ktpa processing facility and TSF (replacement value >C$150m) provide operational flexibility  Power lines to site; sealed roads to site 900ktpa Processing Facility TSF  Full site off

  12. Slide 12: Kounrad Operational Highlights

    Slide 12: Kounrad Operational Highlights

    OPERATIONAL HIGHLIGHTS  Copper cathode production in first 9m of 2026 of 9,758t  9m 2026 copper sales of 9,746t  Firmly on track to meet full-year 2026 guidance of 12,000–13,000t  One LTI in 9m 2026  Cumulative production from Kounrad’s SX-EW plant now more than 188,000t since start of producti

  13. Slide 13: Kounrad Outlook

    Slide 13: Kounrad Outlook

    KOUNRAD OUTLOOK  Record-high copper prices in 9m 2026 (up 43% compared with 9m 2025) leveraged strong operational performance  Operational focus remains on maximising efficiency to sustain Kounrad’s industry-leading margins  Updated Mineral Resource and maiden Ore Reserve Statements published Aug

  14. Slide 14: Kounrad C1 Copper Cash Cost

    Slide 14: Kounrad C1 Copper Cash Cost

    KOUNRAD C1 COPPER CASH COST H1 2026 C1 cash cost $0.91/lb (H1 2025: $0.79/lb)  $0.12/lb YoY increase in C1 cost H1 2026 H1 2025 H1 2026 H1 2025 C1 cash cost $m $m $/lb $/lb  Cathode production of 6,304t (H1 2025: 6,218t) Reagents 1.9 1.7 0.14 0.13  C1 costs of $12.5m (H1 2025: $10.8m), increase P

  15. Slide 15: Sasa Operational Highlights

    Slide 15: Sasa Operational Highlights

    OPERATIONAL HIGHLIGHTS  Ore mined 606,144t in first 9m of 2026, ~3% higher than 9m 2025  9m 2026 production 14,062t zinc-in-concentrate and 20,568t lead-in- concentrate, up 9% and 11%, respectively, on 9m 2025  Firmly on track to meet guidance of 18,000-20,000t zinc and 26,000- 28,000t lead Raise

  16. Slide 16: Improvement Programme at Sasa

    Slide 16: Improvement Programme at Sasa

    IMPROVEMENT PROGRAMME AT SASA  Continuous business improvement programme:  Driving targeted improvements across mine planning, processing throughput, productivity, staffing levels and overall cost control  Mining initiatives in H1 2026:  increase in advance per blast in lateral development  enh

  17. Slide 17: Sasa Costs

    Slide 17: Sasa Costs

    SASA COSTS SASA C1 COSTS DOWN 4%  Site operating costs broadly stable, up 2% to $26.1m H1 2026 H1 2025 H1 2026 H1 2025  Increase driven by weaker USD by 7% and $1.0m increase in C1 cash cost $m $m tailings disposal costs for new tailings disposal methods RoM, t 403,665 394,156  Mining costs lower

  18. Slide 18: Growth and Outlook

    Slide 18: Growth and Outlook

    Growth and Outlook Disciplined capital allocation for sustained value creation CENTRAL ASIA METALS PLC 18 TORONTO ROADSHOW NOVEMBER 2026

  19. Slide 19: Resource Growth Opportunity

    Slide 19: Resource Growth Opportunity

    RESOURCE GROWTH OPPORTUNITY Prospective Geological Setting with Multiple Known  Potentially increase the resource base at the Chibougamau project through low-risk brownfield exploration Open Targets Historical Production & (1)  Chibougamau has a rich mining history having produced nearly 1Mt of co

  20. Slide 20: Growth Exploration in Kazakhstan

    Slide 20: Growth Exploration in Kazakhstan

    GROWTH EXPLORATION IN KAZAKHSTAN YUZHNOE TENIZ BASIN SHAINDY  Maiden drilling completed: 2,100m across  Extensive geochemical and geophysical  Geophysics, surface sampling and mapping seven diamond holes surveys completed during Q3 2026 support interpretation of a porphyry and  Wide copper miner

  21. Slide 21: Summary and Outlook

    Slide 21: Summary and Outlook

    SUMMARY AND OUTLOOK Q4 2026 OUTLOOK  Continued high prices for copper and zinc  Kounrad and Sasa both on track to achieve 2026 full-year guidance  Work on integrating the newly-acquired Chibougamau copper-gold project in Québec under way  TSX listing completed, North American marketing commenced

  22. Slide 22: Investor Relations

    Slide 22: Investor Relations

    Investor Relations Richard Morgan Investor Relations Manager rm@caml.uk +44 (0)20 7898 9001 www.centralasiametals.com /camlmetals LinkedIn Financial Times

  23. Slide 23: Appendix

    Slide 23: Appendix

    TAB ONE TAB TWO TAB THREE TAB FOUR Appendix CENTRAL ASIA METALS PLC 23

  24. Slide 24: Board of Directors

    Slide 24: Board of Directors

    CAPITAL BOARD OF DIRECTORS OVERVIEW FINANCIALS OPERATIONS ALLOCATION OUTLOOK Roger Davey Mike Prentis NED Alison Baker Senior Independent Nigel Robinson Director Dr Gillian Davidson Chair NED Dr Mike Armitage - Technical Committee Nick Clarke NED NED NED Chair NED Member - Audit Committee Non-Execut

  25. Slide 25: Base metals in H1 2026

    Slide 25: Base metals in H1 2026

    CAPITAL MARKET CONDITIONS OVERVIEW FINANCIALS OPERATIONS ALLOCATION OUTLOOK Base metals in H1 2026 Commodity market Macroeconomic and treatment charges  Copper: prices continued to strengthen significantly during H1 Treatment Charges (TCs) 2026, peaking at $14,096/t in May, close to record highs du

  26. Slide 26: H1 2026 Income Statement

    Slide 26: H1 2026 Income Statement

    CAPITAL H1 2026 INCOME STATEMENT OVERVIEW FINANCIALS OPERATIONS ALLOCATION OUTLOOK EBITDA EBITDA EBITDA up by 89% YoY $68.0m $19.3m (H1 2025: $38.3m) (H1 2025: $11.9m)  Revenue: Up 46% YoY  Driven by higher sales volumes and commodity prices: Cu +39%, Zn 78% INCREASE YoY 62% INCREASE YoY +26%, Ag

  27. Slide 27: H1 2026 Capex

    Slide 27: H1 2026 Capex

    CAPITAL H1 2026 CAPEX OVERVIEW FINANCIALS OPERATIONS ALLOCATION OUTLOOK GROUP CAPEX OF $9.5m (H1 2025: $7.4m)  Sasa capex of $8.1m includes $2.4m underground development, $2.1m of underground equipment and vehicles and raise boring of $1.4m  Kounrad: $1.4m including $0.3m dripper pipes, $0.2m new

  28. Slide 28: Statement of Financial Position

    Slide 28: Statement of Financial Position

    CAPITAL STATEMENT OF FINANCIAL POSITION OVERVIEW FINANCIALS OPERATIONS ALLOCATION OUTLOOK STRONG BALANCE SHEET 30 June 31 December 2026 2025  Assets $m $m  PP&E decreased reflecting depreciation and adverse FX PP&E 226.3 238.8 movements Intangible assets 24.2 22.9  Intangible assets increased ref

  29. Slide 29: H1 2026 FCF and Cash Flow

    Slide 29: H1 2026 FCF and Cash Flow

    CAPITAL H1 2026 FCF AND CASH FLOW OVERVIEW FINANCIALS OPERATIONS ALLOCATION OUTLOOK H1 2026 H1 2025 Free cash flow $m $m Net cash generated from operations 51.5 17.9 Capex (9.5) (7.4) Exploration (1.8) (0.5) Interest received 1.0 1.2 Adj: Capital Projects - 1.1 160 Adj: Cash settled SBP 0.5 1.0 71.4

  30. Slide 30: Sustainability Progress H1 2026

    Slide 30: Sustainability Progress H1 2026

    SUSTAINABILITY PROGRESS H1 2026 Maintaining health and safety Community investment Caring for the environment  Launched the Group Safety Culture  Continued the Kounrad Foundation’s STEAM  Completed biodiversity management and Programme, with site-specific plans under programme across 16 Balkhash

  31. Slide 31: Chibougamau Project Mineral Resource Estimate

    Slide 31: Chibougamau Project Mineral Resource Estimate

    CHIBOUGAMAU PROJECT MINERAL RESOURCE ESTIMATE Mineral Resource Statement for Chibougamau project (effective date of 30 August 2025) Grades Contained metal Classification Deposit Mt Cu (%) Au (g/t) Ag (g/t) Cu (kt) Au (koz) Ag (koz) Measured Devlin 0.13 2.73 0.29 0.48 4 1 2 Total Measured 0.13 2.73 0

  32. Slide 32: Sasa Mineral Resource Estimate and Ore Reserve Statement

    Slide 32: Sasa Mineral Resource Estimate and Ore Reserve Statement

    SASA MINERAL RESOURCE ESTIMATE Audited Mineral Resource Statement for Sasa (effective date of 31 December 2025) Grades Contained metal Classification Deposit Mt Zn (%) Pb (%) Ag (g/t) Zn (kt) Pb (kt) Ag (koz) Indicated Svinja Reka 9.6 3.0 4.2 32.8 290 404 10,100 Golema Reka 1.8 1.3 4.1 13.8 24 75 81

  33. Slide 33: Kounrad Mineral Resource Estimate and Ore Reserve Statement

    Slide 33: Kounrad Mineral Resource Estimate and Ore Reserve Statement

    KOUNRAD MINERAL RESOURCE ESTIMATE Audited Mineral Resource Statement for Kounrad (effective date of 31 December 2025) Classification Tonnes Cu Contained Cu metal (Mt) (%) (kt) Measured - - - Indicated 595.1 0.07 407.9 Inferred - - - Notes 1. Mineral Resources are reported in accordance with the guid

Source: company website