Goldsky Resources Corp. · TSXV:GSKR
Goldsky Resources — First Nordic Metals — Investor Presentation (July 2024)
12 slides from Goldsky Resources's investor presentation, July 2024
Slide 1: District-Scale Gold in Northern Europe
District-Scale Gold in Northern Europe July 2024
Slide 2: Cautionary Statements
Cautionary Statements This management presentation (the “Presentation”) is not a prospectus, offering memorandum or an advertisement and was prepared as a CAUTIONARY NOTE summary overview only of the current affairs of First Nordic Metals Corp. (“First Nordic). This Presentation, and the information
Slide 3: The Gold Line Belt
The Gold Line Belt • The largest development-stage claim holder in Sweden with an interest in over 104,000 ha of mineral concessions along a contiguous +100 km strike length • FNM portfolio is underpinned by the flagship Barsele Project with 2.4Moz gold Indicated and Inferred categories, a high-grad
Slide 4: Capital Structure
Capital Structure Shareholder Distribution Basic Shares Outstanding (M) 186.09 21% 31% Warrants (avg. price 0.58) (M) 22.29 Options (avg. price 0.29) (M) 18.30 48% Fully Diluted Shares Outstanding (M) 226.70 Insiders Strategic & Institutional Retail 3 Month Price & Volume FNM Price Share Price (July
Slide 5: Barsele Project: Strategic Partnership with Agnico Eagle Mines
Barsele Project: Strategic Partnership with Agnico Eagle Mines First Nordic Joint Venture • Joint Venture: Agnico Eagle 55% / First Nordic Metals 45% • Since 2015, Agnico Eagle has operated Joint Venture • Extensive land package of 24,980 ha • US$55M JV invested to date by Agnico Eagle; • A total of
Slide 6: Barsele Project: Underpins Portfolio & Near-Term Growth
Avan Zone Central Zone Skiråsen Zone Barsele Project: Underpins Portfolio & Near-Term Growth • Current resource covers 3.6 kilometres of strike along a potential 8.0 kilometre mineralized trend • Drilling has intersected mineralization down to 925 m of depth and remains open in all directions • Geop
Slide 7: Paubäcken Project
Paubäcken Project Results and Exploration Plan Focus on Understanding Geology and Structure, & Target Generation Geochemical Sampling • B-horizon glacial till sampling has Top of Bedrock been completed on the northern Drilling two thirds of the Paubacken project • Proven technique for testing area
Slide 8: Paubäcken Project
Paubäcken Project Aida Target Top of Bedrock Drilling Results Target delineation progressing with bedrock footprint of known mineralization extended to 1.5 km 2023 Top of Bedrock Drilling Extends Mineralization • Bedrock mineralization extended to 1.5 km along Aida structural corridor. • 2023 resul
Slide 9: Storjuktan Project
Storjuktan Project Results and Exploration Plan Focus on Systematic Target Generation on 25,000 Ha Greenfields Project Area Geochemical Sampling • 4,357 B-horizon glacial till samples collected over the Nippas Target area in the central portion of the Storjuktan Project. • Surface till sampling has
Slide 10: Enhanced Management Team and Board of Directors
Enhanced Management Team and Board of Directors Taj Singh Adam Cegielski Benjamin Gelber Chief Technical Director President, CEO, Director Chief Development Officer • 18 years industry experience, specializing in orogenic • 22+ years of experience in mining • 20+ years of experience in the venture c
Slide 11: Enhanced Management Team and Board of Directors
Enhanced Management Team and Board of Directors Toby Pierce Marc Legault Gary Cope Ross Wilmot Chairman Director Director CFO, Director • 25+ years of experience in natural resources • 34 years experience working with Agnico • 35+ years of experience in capital markets • 50+ years of experience as a
Slide 12: GET IN TOUCH WITH FNM
GET IN TOUCH WITH FNM info@fnmetals.com Office: 604-687-8566 Address Suite 300 - 1055 W. Hastings Street Vancouver, BC, Canada V6E 2E9 www.fnmetals.com
First Nordic Metals — Investor Presentation (July 2024) on 6ix