Goldsky Resources Corp. · TSXV:GSKR
Goldsky Resources — Investor Presentation (January 2026)
25 slides from Goldsky Resources's investor presentation, Jan 28, 2026
Slide 1: Transformational acquisition to become 100% owner of the Barsele Gold Project in Sweden
Transformational acquisition to become 100% owner of the Barsele Gold Project in Sweden January 2026 1
Slide 2: Disclaimer
Disclaimer This management presentation (this "presentation") is dated [l] and has been prepared by Goldsky Technical Reports and Qualified Persons Forward -Looking Statements Resources Corp. (formerly Goldsky Metals Corp.) (“Goldsky”) based on information available to Goldsky at the time of prepari
Slide 3: Goldsky: A New Premier Gold Developer in the Nordics
Goldsky: A New Premier Gold Developer in the Nordics Background September 2025: • Merger announced between First Nordic Metals and Mawson Finland • Russell Bradford appointed CEO FNM • Announcement of new board to be appointed • Successful C$80m equity fundraising with new investors December 2025: •
Slide 4: The Transaction
The Transaction Key Terms • Transaction value: US$166m • Goldsky to pay Agnico: • US$20m in cash at closing • 75,509,577 common shares of Goldsky issued to Agnico • 2% NSR with buyback US$50m • Post transaction, Agnico will become 32.5% shareholder inGoldsky • Goldsky will take over the Barsele tech
Slide 5: Barsele Gold Project - Sweden's largest undeveloped gold deposit
Barsele Gold Project - Sweden’s largest undeveloped gold deposit Key Barsele Project Metrics • ~ 25,000 ha within the Fennoscandian Shield, ~600 km north of Stockholm • Indicated and Inferred Resources: Indicated: 7.88 Mt grading 1.27 g/t Au containing 320,781 oz Au;Inferred: 28.75 Mt grading 1.98 g
Slide 6: Barsele Gold Project – Significant work undertaken to date
Barsele Gold Project – Significant work undertaken to date Historic Agnico exploration activity 2015-2025 • 174,509m drilled • 478 holes drilled • 12,2777 assays • 58,487 soil samples • 1,786 BOT holes • 454m avg depth • 2,639km ground Mag survey • In 2025 the joint venture undertook Exposed mineral
Slide 7: Barsele Gold Project – cross section shows significant potential at depth
Barsele Gold Project – cross section shows significant potential at depth TSXV: GSKR | FNSE: GSKRSDB 7
Slide 8: Barsele Gold Project – National Interest Status
Barsele Gold Project – National Interest Status • Barsele Project was granted Mining Concession status • Barsele project was designated as a National interest under Chapter 3, section 7 of Swedish Environmental code TSXV: GSKR | FNSE: GSKRSDB 8
Slide 9: Exploration upside on the Barsele license area
Exploration upside on the Barsele license area Risberget Project • Located 10km south-east of Barsele resource • Hosted in volcano-sedimentary rocks • NE-SW trending structure and mineralisation open at depth • Mineralization in multiple lenses with thickness varying from 5m-160m • Continued explora
Slide 10: Barsele Gold Project – Project Facilities
Barsele Gold Project – Project Facilities Barsele storage facility and offices -5700m2 Core storage facility - 4558m 2 Core logging facility XRF scanning facility Office and lunch facility TSXV: GSKR | FNSE: GSKRSDB 10
Slide 11: Barsele Gold Project – Location with excellent infrastructure
Barsele Gold Project – Location with excellent infrastructure • Storuman is located at an intersection between two European highways and two railroads • 6000 inhabitants • Approx 750km north Stockholm • 20km from Barsele project • Power generation – Hydro and wind at a significantly low cost of US2.
Slide 12: Barsele Gold Project – Environmental monitoring and community engagement
Barsele Gold Project – Environmental monitoring and community engagement • Water sampling, bird and nature surveys, environmental studies, fish studies, Geochemical studies • Archaeology study Four Sami consultations • Waterflow studies annually TSXV: GSKR | FNSE: GSKRSDB 12
Slide 13: Barsele complements Goldsky's existing licences on Sweden's Gold Line Belt
Barsele complements Goldsky’s existing licences on Sweden’s Gold Line Belt The Gold Line Belt | Multi -kilometer long Orogenic Gold System • Goldsky holds licence’s immediately north and south of Barsele • The Paubäcken project is a 17,097 ha land package • The Aida target is a +4 km structural corr
Slide 14: Proposed Programme to commence at Barsele
Proposed Programme to commence at Barsele Drill program in the range of 40,000 -60,000m drilling Q1 Q2 Q3 Q4 What to expect from 2026 work program Close acquisition • Integrated team Integration program with • Expanded resource Agnico • Increased category resource Project review of Agnico data • Pub
Slide 15: Summary
Summary • Transformational acquisition to become 100% owner of Barsele • Agnico to become 32.5% shareholder • Engagement of Mine development team with previous experience from LionOre, Mantra, Asanko • Significant value to be unlocked at Barsele with simplified ownership structure • Goldsky is fully
Slide 16: Appendix
_ i corvsky ’ ] Appendix 16
Slide 17: A Premier Gold Developer in the Nordics
A Premier Gold Developer in the Nordics Finland #1 and Sweden #6 globally for mining investment attractiveness, 2024 3 • Long history of mining • Renewable hydro and cheap power costs • Low political risk - mature, well-defined environmental and permitting procedures in a mining friendly countries •
Slide 18: Corporate Highlights
Corporate Highlights Shareholding Structure Shareholder Structure Analyst Coverage 255,222,335 6,722,652 12% Shares Options 32.50% 20% 10,300,905 272,245,892 Warrants Fully Diluted 35.50% *Subject to final calculations from FNM; Final numbers may vary due to individual rounding Agnico Eagle Retail I
Slide 19: GOLDSKY'S New Leadership with Proven Operational Experience
GOLDSKY’S New Leadership with Proven Operational Experience Peter Breese Russell Bradford Noora Ahola Marc Legault Non-Exec Chairman CEO & Exec. Director Exec. Director & MD, Nordics Non-Exec. Director • +35 years executive & • +35 years of project • Forestry Engineer with a • +40 year of experience
Slide 20: GOLDSKY'S New Leadership with Proven Operational Experience
GOLDSKY’S New Leadership with Proven Operational Experience Karilyn Farmer Jeff Couch Darren Morcombe Non-Exec. Director Board Director Special Advisor • Geologist, mining, construction, and • London-based capital markets executive • +30 years of international experience in strategy professional wit
Slide 21: Responsible Development
Responsible Development ESG is core to GOLDSKY’s operating model GOLDSKY is committed to GOLDSKY operates within mature GOLDSKY creates long-term value responsible mining in the Nordics, Nordic permitting frameworks, for stakeholders through Nordic- advancing high-grade gold and ensuring comprehensi
Slide 22: Finland: Overview of Projects
Finland: Overview of Projects Finland Rajapalot Project (100% owned) • Gold-cobalt project (spin-out of Mawson Gold / Southern Cross Gold) • Inferred Resource: 9.8 Mt at 2.8 g/t Au and 441 ppm Co (0.9Moz Au / 4,311 t Co) • 2023 PEA: US$211M NPV5% and 27% after -tax IRR at US$1,700/oz Au and US$60,00
Slide 23: The Nordic Advantage
The Nordic Advantage Finland Sweden Strategic, Responsible & Prospective Historic and Established • World-leading mining jurisdiction: Finland ranked #1 globally • 1,000+ years of mining heritage, spanning copper, iron, gold, for investment attractiveness (Fraser Institute 2024–25). and silver. • Si
Slide 24: Infrastructure – Politically and Socially Stable Country
Infrastructure – Politically and Socially Stable Country Finland is politically stable • Consistently ranked as a lowest risk country globally. • Ranks for clearly defined mining policy and legislation • High safety and responsibility standards mining practices. Northern Finland is an active mining
Slide 25: Iiico
Y SK LD Iiico
Goldsky Resources — Investor Presentation (January 2026) on 6ix