Metals X Limited · ASX:MLX
Metals X — Shareholder Meeting (November 2013)
32 slides from Metals X's shareholder meeting presentation, Nov 15, 2013
Slide 1: A Diversified Miner
ASX :MLX OTCQX :MTXXY For personal use only A DIVERSIFIED MINER TIN DIVISION GOLD DIVISION NICKEL DIVISION “World Class - Renison” HGO &SKO – 7.2Moz “World Class – Wingellina” Operating CMGP – 5 Moz Development Ready Strong cash flow Rover 1 – 1.2 Moz 40 yr + Project Other Tin Projects 150,000ozpa+ p
Slide 2: Project Locations
TIN NICKEL GOLD PROJECT LOCATIONS For personal use only Metals X is an Australian focused diversified miner. MLX 50% 2
Slide 3: Capital Structure
TIN NICKEL GOLD CAPITAL STRUCTURE For personal use only Major Shareholders Market ASX APAC Resources 24.1% Share Code MLX Jinchuan Group 10.7% Share Price $0.15 Board & Management 8.5% Shares on Issue 1,652M Blackrock Investments 4.4% Market Capitalisation $250M 76% Net Cash (and WC) $50M Top 50 Sha
Slide 4: Tin Division
TIN DIVISION AUSTRALIA’S ONLY SIGNIFICANT TIN PRODUCER For personal use only 4
Slide 5: Australia's Tin Resources
TIN AUSTRALIA’S TIN RESOURCES For personal use only Metals X dominates Australia’s known tin resources. 2.5( represents total resource size 2( Renison) 1.5( Grade)(%)Sn)) Outback( Collingwood) Stellar( 1( Rentails) 0.5( Bischoff( Torian( YTC( Cons.(Tin( Monto( Paradigm( Venture( Toronga( 0( 0( 10( 20
Slide 6: Renison – one of the largest tin mines ever mined
TIN RENISON – one of the largest tin mines ever mined in the world; and For personal use only still going after 45 years. Proposed Proposed Renison Infrastructure Expansion Project Renison Mine Renison Mine Infrastructure Infrastructure 6
Slide 7: Tasmanian Tin Operations (50%)
TIN TASMANIAN TIN OPERATIONS (50%) MLX For personal use only Renison • Production from 1968: 23Mt @ 1.4% Sn (225Kt recovered) • Reserves 4.12Mt @ 1.28% Sn (53Kt) • Resources 11.6Mt @ 1.76% Sn (204Kt) • 2013/14: 7,500tpa Sn @ A$15,000 est • EBITDA MLX share (50%) ~ $34Mpa at current prices, ~ $56Mpa
Slide 8: One of the Largest Tin Systems in the World
TIN ONE OF THE LARGEST TIN SYSTEMS IN THE WORLD For personal use only 2 km 8
Slide 9: Significant Expansion Potential
TIN SIGNIFICANT EXPANSION POTENTIAL For personal use only AREA 4 9
Slide 10: Rentails – The Renison Expansion Project (50%)
TIN “RENTAILS” – THE RENISON EXPANSION PROJECT (50%) For personal use only Proposed Infrastructure Proposed Renison Expansion Project Renison Mine Renison Mine Infrastructure Infrastructure
Slide 11: Rentails – The Renison Expansion Project (50%)
TIN “RENTAILS” – THE RENISON EXPANSION PROJECT (50%) For personal use only • A tailings re-treatment project applying new and proven technology. • Total JORC Resource: - 20.6 Million tonnes @ 0.45%Sn, 0.21%Cu. • Production of 5,000tpa Sn and 2,000tpa Cu for 10 years. • EBITDA MLX Share ~$30Mpa at cu
Slide 12: Forecast weeks' supply and prices
TIN For personal use only Forecast weeks’ supply and prices Weeks’ supply, price in US$/tonne 14.0 Forecast 40,000 Weeks' supply Prices 12.0 35,000 30,000 10.0 25,000 8.0 20,000 6.0 15,000 4.0 10,000 Renison Mine 2.0 Infrastructure 5,000 0.0 0 1990 1995 2000 2005 2010 2015 12 Base graph after Peter
Slide 13: Tin Supply Will Remain Tight for Many Years
TIN TIN SUPPLY WILL REMAIN TIGHT FOR MANY YEARS For personal use only Minimal projects in the pipeline, most requiring significantly higher prices for development 1 at feasibility stage 4 at scoping stage ~10 with JORC compliant 2 Years 5 Years 10 Years resources ~60 with historical resources 10 Yea
Slide 14: Gold Division
GOLD DIVISION For personal use only Higginsville (above) and South Kalgoorlie Gold Operations
Slide 15: Key Attributes of Gold Division - Westgold
GOLD KEY ATTRIBUTES OF GOLD DIVISION - WESTGOLD For personal use only Four Gold Projects 1. Higginsville Gold Operations – in production (ex. Alacer Gold). 2. South Kalgoorlie Gold Operations – in production (ex. Alacer Gold). 3. Central Murchison Gold Project – completed DFS. 4. Rover 1 Gold Projec
Slide 16: Two Production Centres
GOLD TWO PRODUCTION CENTRES For personal use only • Higginsville Operations (“HGO”)- mainly underground operation (Trident & Chalice), 1.3Mtpa CIP Plant, 1.5Moz Resource, producing at circa 150,000ozpa. • South Kalgoorlie Operations (“SKO”) is an open pit & potential underground operation. 1.2Mtpa P
Slide 17: Chalice – Ready for additional development
GOLD CHALICE – Ready for additional development For personal use only Available for stoping Approximate decline face Ready for immediate development Open at depth 17 ~1400 oz/vm
Slide 18: Chalice Mine - High Grade – Limited by Drilling
GOLD CHALICE MINE - HIGH GRADE – LIMITED BY DRILLING For personal use only Current Decline 1045 R.L Position (0930 R.L) 1020 R.L 1016 R.L Olympus 0988 – 1016 R.L* 167.2kt @ 5.1 g/t for 27.4k Oz 980 Oz / Vm 0988 R.L Olympus 0960 – 0988 R.L* 313.5kt @ 5.8 g/t for 58.7k Oz 2,097 Oz / Vm 0960 R.L Olympu
Slide 19: Existing Trident Reserve – Open at Depth
GOLD EXISTING TRIDENT RESERVE – OPEN AT DEPTH For personal use only Remnants 700,000 tonnes @ 4.5 g/t 100,000 oz Decline extension 1,300,000 tonnes @ 6.6 g/t Open at 275,000 oz depth 19
Slide 20: Trident Underground Mine – High Grade Reserves
GOLD TRIDENT UNDERGROUND MINE – HIGH GRADE RESERVES For personal use only Artemis Stoping 95kt @ 12.5 g/t for 38k Oz Helios Stoping (0550 R.L Up – Sept13 onwards) 51kt @ 10.0 g/t for 16k Oz (0550 R.L Up – Sept13 onwards) Current Decline Position (0550 R.L) Artemis 0514 – 0550 R.L* 569 Oz / Vm Helios
Slide 21: Open Pit Probable Reserves
GOLD OPEN PIT PROBABLE RESERVES For personal use only Ore Diluted Mineable Reserves Grade Ounces (k. Deposit (MT) (g/t) oz) Pluto 0.3 1.6 13.4 Wills 0.1 3.1 6.9 Mitchell 0.8 1.6 40.1 Cowan 0.9 1.7 49.9 Pioneer 0.1 1.5 3.5 Fair Play 0.3 1.8 15.7 Musket 0.2 2.9 16.4 Total 2.5 1.8 145.9 21
Slide 22: South Kalgoorlie Exploration
GOLD SOUTH KALGOORLIE EXPLORATION For personal use only • World Class Tenure continuously operated for over 25 years. • Major gold bearing faults. • Next 12 months – Toll treatment and process significant stockpiles; – Priorities exploration of identified discoveries and additional targets; – Build su
Slide 23: Central Murchison Gold Project – BFS Completed
GOLD CENTRAL MURCHISON GOLD PROJECT – BFS COMPLETED For personal use only Big Bell Total Mineral Resource - Mineral Resource 61.6Mt @ 2.52g/t 4.96Moz 43.6Mt @ 2.47g/t Au - Ore Reserves Initial Ore Reserve 9.8Mt @ 2.54g/t Au 15.5Mt @ 2.36g/t 1.2Moz Big Bell Cuddingwarra - Mineral Resource 6.25Mt @ 2.
Slide 24: Scoping Study Outcomes
GOLD SCOPING STUDY OUTCOMES For personal use only 24
Slide 25: Targeting High Grade – IOCG Mineralisation
GOLD TARGETING HIGH GRADE – IOCG MINERALISATION For personal use only 474m 3.1% Cu, 0.32g/t Au 548m 9.23g/t Au 475m 549m 9.0% Cu, 1.06g/t Au 10.30g/t Au 476m 10.9% Cu, 1.28g/t Au 550m 9.28g/t Au 551m 6.46g/t Au 477m 21.47% Cu, 1.41g/t Au 552m 478m 26.5g/t Au 0.8% Cu, 0.12g/t Au 553m 8.82g/t Au 479m
Slide 26: Nickel Division – Central Musgraves Project
NICKEL DIVISION CENTRAL MUSGRAVES PROJECT For personal use only 26
Slide 27: Central Musgrave Project
NICKEL CENTRAL MUSGRAVE PROJECT For personal use only • A major land holding – oxide & sulphide nickel, copper and platenoids. • A mining agreement covering 18,000km2 (projects + infrastructure). • The world class Wingellina Nickel Project - one of the largest undeveloped nickeliferous ‘pure oxide’
Slide 28: Wingellina Project – Phase Feasibility
NICKEL WINGELLINA PROJECT – PHASE 1 FEASIBILITY For personal use only Ore Reserves 167.5M tonnes @ 1% Ni, 0.08% Co Annual Metal Production 40,000 tonnes Ni, 3,000 tonnes Co Mine Life 40+ Years Metal Price Assumptions Ni US$20,000/t, Co US$45,000/t Exchange Rate Assumption AUD 0.85 Production Cost US
Slide 29: Wingellina - Current Status
NICKEL WINGELLINA - CURRENT STATUS For personal use only • Feasibility study (±25%) was completed in 2008. • In 2010 Metals X signed a ground breaking Mining Agreement with the native title holders, the first ever negotiated in the region. • Environmental approvals are underway and expected to comple
Slide 30: Metals X Limited - Scorecard
TIN NICKEL GOLD CASH INVESTMENTS NO DEBT METALS X LIMITED - SCORECARD For personal use only • A$50M Cash & Investments. • Market Capitalisation ~ A$250M, EV A$200M, Debt Free. • Renison - Strong Cashflows - EBITDA (50% MLX) A$30-55Mpa, 7-8,000tpa of tin. • Rentails Expansion Project (50% MLX) adds E
Slide 31: Disclaimer
TIN NICKEL GOLD DISCLAIMER For personal use only General Disclaimer This presentation has been prepared by Metals X Limited (“Metals X” or the “Company”). It should not be considered as an offer or invitation or inducement to subscribe for or the purchase of any securities in the Company. This presen
Slide 32: Thank You
ASX :MLX OTCQX :MTXXY For personal use only A DIVERSIFIED MINER TIN DIVISION GOLD DIVISION NICKEL DIVISION “World Class - Renison” HGO &SKO – 7.2Moz “World Class – Wingellina” Operating CMGP – 5 Moz Development Ready Strong cash flow Rover 1 – 1.2 Moz 40 yr + Project Other Tin Projects 150,000ozpa+ p