Metals X Limited · ASX:MLX

Metals X — Shareholder Meeting (May 2026)

27 slides from Metals X's shareholder meeting presentation, May 19, 2026

  1. Slide 1: Australia's Premier Tin Producer

    AUSTRALIA’S PREMIER TIN PRODUCER AGM PRESENTATION 19 MAY 2026 metalsx.com.au ASX|MLX

  2. Slide 2: Disclaimer

    Disclaimer This presentation has been prepared by Metals X Limited (“Metals X”, “MLX” or the “Company”) and authorised for release by its Board. GENERAL DISCLAIMER PAST PERFORMANCE This presentation should be read in conjunction with the Annual Report at 31 December 2025 Past performance information

  3. Slide 3: Board

    Board Peter Gunzburg Brett Smith Grahame White Patrick O’Connor Independent Independent Independent Executive Director Non-Executive Chairman Non-Executive Director Non-Executive Director Mr Gunzburg has over 40 years’ experience Mr Smith has participated in the development of a number Mr White is a

  4. Slide 4: CY2025 Company Highlights

    CY2025 Company Highlights1 Delivered another strong financial year, with revenue up 30% to $285.0 31 December 2025: million (CY2024: $219 million), net profit after tax of $104.6 million (CY2024: $102.3 million), and operating cash flow of $128.3 million (CY2024: $143.6 million). Closing cash increa

  5. Slide 5: Financial Summary

    Financial Summary As at 31 December Share Price Performance $1,200 $1.20 $1,000 $1.00 $800 $0.80 40% $600 $0.60 $400 $0.40 Tin Customers $200 $0.20 $0 - 60% 30-Jun-20 30-Jun-21 30-Jun-22 31-Dec-22 31-Dec-23 31-Dec-24 31-Dec-25 12-months 12-months 12-months 6-months 12-months 12-months 12-months Mala

  6. Slide 6: Financial Summary Investments

    Financial Summary Investments As at 31 December 2025 Percentage Number of Company Instrument Total Cost $ Unit Value $ Valuation $ Valuation Method6 Ownership Instruments 5 CYM N/A Con.Notes - 4 9,000,000 $45,200,000 Fair value CYM N/A Options - 4,060,000 $0.30 $1,202,000 Fair value 1SN 29.95% Share

  7. Slide 7: Investments – May 2026

    Investments – 19 May 2026 50% 2.93% 3.11% 7.43% 0.70% 29.95% 15.91% 100% 16.44% 41% RENISON and RENTAILS Page 7

  8. Slide 8: Company Tax Position

    Company Tax Position At 31 December 2025, the Group had unrecognised transferred revenue tax losses of $460.75M11, available for utilisation at a restricted utilisation rate with no expiry (31 December 2024: $482.25M). Metals X utilised the maximum portion of its transferred revenue tax losses avail

  9. Slide 9: Capital Management

    Capital Management Maintain a conservative, debt-free balance sheet with substantial cash to preserve flexibility for growth opportunities and risk management. Prioritise financing of the Rentails Project as the principal near-term call on cash, ensuring MLX can meet its share of development capital

  10. Slide 10: Renison – A World Class Tin Operation

    Renison – A World Class Tin Operation • Only ASX listed tin producer. • A significant tin operation in a favourable jurisdiction. • Renison Bell Proved and Probable Reserve 7.505Mt at 1.37% Sn for 102,700 tonnes of contained tin.12 • Mine life remains at approximately 10 years, at an annual producti

  11. Slide 11: Renison Tin Mine

    Renison Tin Mine The Renison tin mine was discovered by George Renison Bell in 1890, initially producing alluvial cassiterite. Hard rock mining commenced in 1936, with continuous operation at the current plant site since 1965. Bluestone Mines acquired Renison Renison in 2004, restarting operations i

  12. Slide 12: Renison Safety

    Renison Safety Total Recordable Injury Frequency Rate Implemented a site-wide safety reset at Renison, including updated Life Saving Rules 25 and a detailed action plan, with progress 21.3 regularly communicated to the workforce. 20 Commenced installation of dash cameras across all mobile equipment

  13. Slide 13: Renison Tin Operation

    Renison Tin Operation Production and Financial Summary (100%) Unit 2025 2024 Var. % Ore mined t ore 751,645 801,193 (6.2) Grade of ore mined % Sn 1.74 1.91 (8.9) Ore milled (after sorter upgrade) t ore 668,422 665,334 0.5 Grade of ore processed % Sn 2.01 2.12 (5.2) Mill recovery % 79.87 77.93 2.5 RE

  14. Slide 14: Capital Projects

    Capital Projects Ventilation Upgrade Mine Dewatering Surface Projects • The Leatherwoods ventilation system is currently • The new mine dewatering system is well advanced, • The new Mill Pond Tank 2 was successfully operating in a temporary configuration following the with all pumps installed and fo

  15. Slide 15: Rentails

    Rentails The Rentails Project is located adjacent to the Murchison Highway south of Lake Pieman and The Rentails Project is a tailings retreatment initiative at the covers a substantial footprint within the existing consolidated mining lease at Renison. During Renison tin mine in Tasmania, aiming to

  16. Slide 16: Near Mine Exploration

    Near Mine Exploration Key activities during CY2025 included: • Near mine exploration continued to target resource growth around existing Renison infrastructure, using integrated surface drilling, underground drilling and geophysical surveying across multiple target areas. • At the Ringrose and Acaci

  17. Slide 17: Mineral Resources (Renison Tin Operation)

    Mineral Resources (Renison Tin Operation) As at 31 March 2025 14 Reported on 100% basis – Metals X has a 50% participating interest through its Contained Metal stake in the Bluestone Mines Tasmania Joint Venture. Tonnes Tin Copper Tin Copper Project (Mt) (%Sn) (%Cu) (kt) (kt) 31-Mar-24 Renison Bell

  18. Slide 18: Ore Reserves (Renison Tin Operation)

    Ore Reserves (Renison Tin Operation) Ore Reserves Estimates15 – Consolidated Summary & Annual Comparison The Ore Reserve estimates are a subset of the Mineral Resource estimates Reported on 100% basis – Metals X has a 50% participating interest through its stake in the Bluestone Mines Tasmania Joint

  19. Slide 19: First Tin

    First Tin TARONGA, NSW, AUSTRALIA • Deposit >50kt Sn Significant shareholders over 3% Reserves Tonnage Assay Contained Tin Classification (Mt) (% Sn) (Tonnes) OECD Number of Total share Stakeholders Shares % Proved 26 0.14 36,000 Major Tin Probable 13 0.12 16,000 TELLERHÄUSER & Consuming Metals X Lt

  20. Slide 20: Stellar Resources

    Stellar Resources The Key Upcoming Catalysts timing presented on this slide are based on Stellar’s own project projections and should be interpreted in conjunction with the forward-looking statements disclaimer set out on Slide 2. 16 Refer to ASX Announcements 4 September 2023: Heemskirk Tin Project

  21. Slide 21: Elementos

    METALS » LIMITED Elementos (ASX:ELT) is developing two strategic tin projects Andalucia, Spain SO RRSaARAA Tasmania, Australia The EU’s only advanced tin mining project and one of the few vertically integrated tin supply Historic tin mine under re-evaluation as a tin, chains in the world (mine-to-me

  22. Slide 22: Oropesa Mineral Resource Estimate & Maiden Ore Reserve Tables

    Elementos Oropesa Mineral Resource Estimate17 & Maiden Ore Reserve 18 Tables 17 Refer ELT ASX announcement 14 February 2023: “Oropesa Tin Project – 2023 Mineral Resource Update”, and 29 November 2023: “Maiden Zinc Mineral Resource at Oropesa Tin Project” 18 Refer ELT ASX announcement 04 April 2025 “

  23. Slide 23: Cleveland Mineral Resource Estimates & Exploration Target

    Elementos Cleveland Mineral Resource Estimates19 & Exploration Target20 19 Refer ELT ASX announcements 3 August 2015: “Cleveland Tailings Ore Reserve” and 26 September 2018: “Substantial Increase in Cleveland Open Pit Project Resources following Revised JORC Study” 20 Refer ELT ASX announcement 4 Fe

  24. Slide 24: Cleveland Tin Project Exploration Target

    Cleveland Tin Project Exploration Target Competent Persons Statement ‘¢ The information in this Presentation that relates to the Cleveland Exploration Target is based on, and fairly represents, information and supporting documentation compiled or reviewed by Mr Chris Creagh. Mr Creagh is a Member of

  25. Slide 25: Competent Persons and Compliance Statements

    Competent Persons and Compliance Statements COMPETENT PERSONS STATEMENT Metals X Competent Persons Statements The information in this announcement that relates to Mineral Resources has been compiled by Bluestone Mines Tasmania Joint Venture Pty Ltd technical employees under the supervision of Mr Col

  26. Slide 26: Competent Persons and Compliance Statements

    Competent Persons and Compliance Statements COMPETENT PERSONS STATEMENT Stellar Resources Competent Persons Statements23 The information in this announcement that relates to exploration results, exploration targets and mineral resources for the Heemskirk Tin Project has been compiled by Mr Ross Corb

  27. Slide 27: Contact

    CONTACT ENQUIRIES Mr Brett Smith | Executive Director brett.smith@metalsx.com.au Phone: +61 8 9220 5700 Unit 202, Echelon, 77 South Perth Esplanade, South Perth WA 6151 Australia metalsx.com.au ASX|MLX

Metals X — Shareholder Meeting (May 2026) on 6ix