Malaysia Marine & Heavy Engineering Holdings Bhd. · MYX:MHB

Malaysia Marine & Heavy Engineering Holdings Bhd — Q4 2017 Earnings Presentation

34 slides from Malaysia Marine & Heavy Engineering Holdings Bhd's earnings presentation, Feb 7, 2018

  1. Slide 1: Quarterly IR Updates: 4th Quarter 2017 Financial Results & Updates

    Slide 1: Quarterly IR Updates: 4th Quarter 2017 Financial Results & Updates

    QUARTERLY IR UPDATES 4th Quarter 2017 Financial Results & Updates 7th February 2018 Malaysia Marine and Heavy Engineering Holdings Berhad

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    2 Disclaimer This Presentation is not intended to form the basis of any investment decision with respect to Malaysia Marine and Heavy Engineering Holdings Berhad (MHB). Neither this presentation nor anything contained herein shall form the basis of, or be relied upon in connection with, any contract

  3. Slide 3: Contents

    Slide 3: Contents

    3 Contents • Overview • Projects • Financials • Highlights • Moving Forward Malaysia Marine and Heavy Engineering Holdings Berhad

  4. Slide 4: Overview

    Slide 4: Overview

    Overview Malaysia Marine and Heavy Engineering Holdings Berhad

  5. Slide 5: Key Highlights

    Slide 5: Key Highlights

    5 Key Highlights  FINANCIALS • Revenue of RM956.4 mil • Pretax Profit of RM11.0 mil  PROJECTS Heavy Engineering Unit (HEU) Milestones: Offshore • Sail-away of F12 Kumang WHP topside and jacket • Sail-away of Besar-A topside • Sail-away of Baronia CPP jacket, bridge & piles • Sail-away of PETRONAS

  6. Slide 6: Projects

    Slide 6: Projects

    Projects Malaysia Marine and Heavy Engineering Holdings Berhad

  7. Slide 7: Besar-A WHP Topside, Jacket & HUC

    Slide 7: Besar-A WHP Topside, Jacket & HUC

    7 Sail-away of Topside on 3rd March 2017 Besar-A WHP Topside, Jacket & HUC Malaysia Marine and Heavy Engineering Holdings Berhad

  8. Slide 8: F12 Kumang WHP Topside, Jacket & HUC

    Slide 8: F12 Kumang WHP Topside, Jacket & HUC

    8 Sail-away of Topside on 3rd March 2017 F12 Kumang WHP Topside, Jacket & HUC Malaysia Marine and Heavy Engineering Holdings Berhad

  9. Slide 9: Baronia CPP Jacket, Bridge & Piles

    Slide 9: Baronia CPP Jacket, Bridge & Piles

    9 Sail-away of Jacket on 7th March 2017 Baronia CPP Jacket, Bridge & Piles Malaysia Marine and Heavy Engineering Holdings Berhad

  10. Slide 10: Petronas PFLNG 2 Turret system

    Slide 10: Petronas PFLNG 2 Turret system

    10 Sailed away on 2nd December 2017 Petronas PFLNG 2 Turret system Malaysia Marine and Heavy Engineering Holdings Berhad

  11. Slide 11: FSO Benchamas 2 External Turret

    Slide 11: FSO Benchamas 2 External Turret

    11 Completed integration of external turret on 22nd November 2017 FSO Benchamas 2 External Turret Malaysia Marine and Heavy Engineering Holdings Berhad

  12. Slide 12: Facilities Improvement Project

    Slide 12: Facilities Improvement Project

    12 Completed modification and rejuvenation work on 30th September 2017 Facilities Improvement Project Malaysia Marine and Heavy Engineering Holdings Berhad

  13. Slide 13: RAPID Package 22

    Slide 13: RAPID Package 22

    13 Completion of plate rolling on 30th June 2017 RAPID Package 22 Malaysia Marine and Heavy Engineering Holdings Berhad

  14. Slide 14: RAPID Package 3 Area 3

    Slide 14: RAPID Package 3 Area 3

    14 Completion of piping and pipe support pre-fabrication on 31-Mar-2017 RAPID Package 3 Area 3 Malaysia Marine and Heavy Engineering Holdings Berhad

  15. Slide 15: Bokor CPP EPCIC

    Slide 15: Bokor CPP EPCIC

    15 Progress at 6.04% Bokor CPP EPCIC Malaysia Marine and Heavy Engineering Holdings Berhad

  16. Slide 16: Sepat – A WHP EPCIC

    Slide 16: Sepat – A WHP EPCIC

    16 Progress at 28.33% Sepat – A WHP EPCIC Malaysia Marine and Heavy Engineering Holdings Berhad

  17. Slide 17: RAPID Projects - Package 5 Centralised Piping Fabrication (CPF)

    Slide 17: RAPID Projects - Package 5 Centralised Piping Fabrication (CPF)

    17 Progress at 99.43% RAPID Projects - Package 5 Centralised Piping Fabrication (CPF) Malaysia Marine and Heavy Engineering Holdings Berhad

  18. Slide 18: RAPID Projects – Package 5 ROG

    Slide 18: RAPID Projects – Package 5 ROG

    18 Progress at 55.26% RAPID Projects – Package 5 ROG Malaysia Marine and Heavy Engineering Holdings Berhad

  19. Slide 19: RAPID Projects – Package 3 Area 2

    Slide 19: RAPID Projects – Package 3 Area 2

    19 Progress at 79.76% RAPID Projects – Package 3 Area 2 Malaysia Marine and Heavy Engineering Holdings Berhad

  20. Slide 20: RAPID Projects – Package 14

    Slide 20: RAPID Projects – Package 14

    20 Progress at 42.13% RAPID Projects – Package 14 Malaysia Marine and Heavy Engineering Holdings Berhad

  21. Slide 21: FSO “Nautica Bergading”

    Slide 21: FSO “Nautica Bergading”

    21 Refurbishment and Conversion (99.80% Progress) FSO “Nautica Bergading” Malaysia Marine and Heavy Engineering Holdings Berhad

  22. Slide 22: FSO “Benchamas-2”

    Slide 22: FSO “Benchamas-2”

    22 RLE and Conversion (93.40% Progress) FSO “Benchamas-2” Malaysia Marine and Heavy Engineering Holdings Berhad

  23. Slide 23: Dangote (CALM) Buoy

    Slide 23: Dangote (CALM) Buoy

    23 Fabrication, procurement, construction, testing and pre-commissioning (93.80% Progress) Dangote (CALM) Buoy Malaysia Marine and Heavy Engineering Holdings Berhad

  24. Slide 24: Financials

    Slide 24: Financials

    Financials Malaysia Marine and Heavy Engineering Holdings Berhad

  25. Slide 25: Income Statement, Sequential Quarter

    Slide 25: Income Statement, Sequential Quarter

    25 Financial Updates Income Statement, Sequential Quarter • Revenue Income Statement (RM 'm) 4Q 2017 3Q 2017 • HEU – Higher revenue contributed by new Revenue 247.954 215.350 projects. Heavy Engineering 162.277 117.627 • MBU – Lower revenue due to lower value Marine 85.677 97.723 and number of vesse

  26. Slide 26: Income Statement, Year-on-Year

    Slide 26: Income Statement, Year-on-Year

    26 Financial Updates Income Statement, Year-on-Year • Revenue • HEU – Completion of several offshore projects Income Statement (RM 'm) 12M 2017 12M 2016 whilst revenue from new projects will be mainly Revenue 956.414 1,191.298 recognised in 2018. Heavy Engineering 591.324 746.666 Marine 365.090 444.

  27. Slide 27: Balance Sheet

    Slide 27: Balance Sheet

    27 Financial Updates Balance Sheet Balance Sheet (RM 'm) Dec 2017 Dec 2016* Non-Current Assets 1,839.433 1,857.528 Inventories 2.399 10.747 Receivables 848.379 1,052.111 • Total assets of RM3.386bn Cash 674.968 671.128 • Receivables & Payables – completion of Others 20.864 11.007 offshore projects T

  28. Slide 28: Backlog & Order Intake

    Slide 28: Backlog & Order Intake

    28 Financial Updates Backlog & Order Intake Backlog RM million Backlog 2,556 1,772 1,575 1,023 1,273 629 Dec12 Dec13 Dec14 Dec15 Dec16 Dec17 Backlog CPP Bokor December 2017 1 RM1,273.4m Benchamas Order Intake RM million Sepat Phase 2A Besar A Rapid (4 Packages) 550 Dangote CALM Buoy Others Marine Bu

  29. Slide 29: Shareholding Information

    Slide 29: Shareholding Information

    29 Corporate Updates Shareholding Information Technip SA Share Price RM 8.50% 2.00 Lembaga Tabung Haji 6.69% 1.50 As at PNB & PNB As at 1.00 0.92 Unit Trust 31 Dec 2016 Funds 2.07% 29 Dec 2017 EPF 1.53% 0.82 1.00 29/12/2017 Other Malaysian Shareholders 11.83% 0.50 2016 2017 Foreign Investors 2.88% M

  30. Slide 30: Highlights

    Slide 30: Highlights

    Highlights Malaysia Marine and Heavy Engineering Holdings Berhad

  31. Slide 31: MMHE EPIC Marine & Services Sdn Bhd (MEMS)

    Slide 31: MMHE EPIC Marine & Services Sdn Bhd (MEMS)

    31 MMHE EPIC Marine & Services Sdn Bhd (MEMS) • Incorporated on 16 August 2016 as a JV between Malaysia Marine and Heavy Engineering Sdn Bhd (MMHE) and Eastern Pacific Industrial Corporation Berhad (EPIC) • 1st floating dock in East Peninsular Malaysia. A 5,000 tons floating dock with maximum liftin

  32. Slide 32: Dry Dock 3 (DD3)

    Slide 32: Dry Dock 3 (DD3)

    32 Dry Dock 3 (DD3) • FID approved by the Board of Directors on 26 April 2017 • DD3 offers flexibility to cater various types of vessel, especially LNG Carrier • Dock size of 350m (L) x 80m (W) x 14m (D) • Overall progress is 15.4% as at 30 Dec 2017 • DD3 is expected to commence operation in Q3 2020

  33. Slide 33: Moving Forward

    Slide 33: Moving Forward

    33 Moving Forward • Strategy & Initiatives • ~ RM4.0 billion ongoing HEU tenders • Developing Onshore Construction & Fabrication capabilities through process module and non O&G industry • Seizing available Floater Conversion opportunities in international market • Developing Oil & Gas Services for o

  34. Slide 34: Malaysia Marine and Heavy Engineering Holdings Berhad

    Slide 34: Malaysia Marine and Heavy Engineering Holdings Berhad

    Malaysia Marine and Heavy Engineering Holdings Berhad

Source: Internet Archive copy of mhb.com.my

More decks from Malaysia Marine & Heavy Engineering Holdings Bhd.

All 35 Malaysia Marine & Heavy Engineering Holdings Bhd decks