Parkd Ltd. · ASX:PKD

Parkd — Investor Presentation (November 2022)

17 slides from Parkd's investor presentation, November 2022

  1. Slide 1: Company Update 2022 Investor Presentation

    COMPANY UPDATE 2022 INVESTOR Presentation 2ϵth November 2022 SMARTER CAR PARKING SOLUTIONS

  2. Slide 2: Disclaimer

    DISCLAIMER This presentation does not constitute investment advice. Neither this presentation nor the information contained in it constitutes an offer, invitation, solicitation or recommendation in relation to the purchase or sale of shares in any jurisdiction. This presentation does not take into a

  3. Slide 3: PARKD Limited (ASX: PKD)

    PARKD LIMITED (ASX: PKD) WHO WE ARE WHAT WE DO OUR MISSION PARKD is a Market leading We are a Construction Deliver built form solutions Technology Company offering that offer outstanding specialists in the delivery of turn key solutions for the sustainable, cost and low turn-key construction and des

  4. Slide 4: What We Do

    WHAT WEDO WE DESIGN AND BUILD MODULAR CAR PARKS CAR PARKS DESIGN BUILD CAR PARK Turnkey delivery CONSULTING FUNDING SERVICES

  5. Slide 5: The PARKD Car Park System

    THE PARKD CAR PARK SYSTEM SUSTAINABILITY AT THE HEART OF OUR SOLUTIONS I NNOVATION Our R&D has resulted in the registration of Patents in USA, Japan and South countries for our innovative CVB (Continuously Voided Beam) technology utth Africa along with pending system gyy and syst peending registrati

  6. Slide 6: System Performance

    SYSTEM PERFORMANCE The PARKD System is a marriage between existing construction technology; Hollowcore and light weight slab systems. Column, slab and beam modules are prefabricated minimizing construction complexity and waste. COMPONENTS SPECIFICATION Beams Meets all relevant Australian Standards C

  7. Slide 7: Nationwide Industry Partnership

    NATIONWIDE INDUSTRY PARTNERSHIP PRECAST –PREFABRICATED -MODULAR Our supply chain partners can reach all states and territories around Australia with our system components and have supplied technical and pricing support for projects up to $100M and consist of the following companies: CVB Tm (Hollowco

  8. Slide 8: Designed for Sustainable Outcomes

    DESIGNED FOR SUSTAINABLE OUTCOMES Delivering Smart Solutions We have created a sustainable Our adoption of modular and environmentally friendly design principles to create modular construction system a ‘kit of parts’ that are manufactured off site We are utilising existing provides unprecedented con

  9. Slide 9: FY22 Overview

    FY22 OVERVIEW Technical Advisory Approx. $500k in works managed & delivered Successful conversion of Technical works to construction projects Contract Works Approx. $1.7M in works managed & delivered R&D Significant improvement in: Regional protection Complete System IP Development Licencing Opportu

  10. Slide 10: Operational Overview

    OPERATIONAL OVERVIEW $ 000's REVENUE - FY 2022 Revenue increase > $2M 900 800 768.185 Cash burn steady 700 Strengthen performance in Auto 600 500 Retail Sector 387.17 400 Establishment of building company 300 200 162.15 161.185 138.95 149 Project performance demonstrates 100 62.35 79.913 113.94 syst

  11. Slide 11: 2022 PARKD Design Technical Advisory

    Audi Centre Myaree Fiveight 2022 PARKD DESIGN • Integrated dealership facility delivered by PARKD Construction • Extension to existing Car Park TECHNICAL ADVISORY • Build to remove • Adopting the latest Audi • Build to relocate Corporate Identity designs • Vertical extension • Change of use (commerc

  12. Slide 12: 2022 PARKD Construction

    2022 PARKD CONSTRUCTION John Hughes Group Site and Development Construction inside existing warehouse Un-propped construction method Cost $1.5M Gross vehicle storage: Approx. 160 Area: 1800m2 Structure Type: Permanent System Assembly: 16 Crane days Concrete Pour: 1 day Fit-out: 6 weeks

  13. Slide 13: 2023 Delivering Outcomes

    Delivery Of Technical Works 2023 DELIVERING Current and completed OUTCOMES technical contracts for the development of Multi-level Car Parks for Commuter and Health Sectors, positions PARKD well for the delivery of these projects. Execute Construction Contracts CONSTRUCTION PROJECTS FUNDED PROJECTS D

  14. Slide 14: Clients

    CLIENTS FASTER I CHEAPER I SUSTAINABLE IFLEXIBLE CLIENT SIDE TECH ADVISORY SOLUTION SERVICES Note: Includes all recent and past consultancy services

  15. Slide 15: Advisory

    ADVISORY FASTER I CHEAPER I SUSTAINABLE IFLEXIBLE CLIENT SIDE TECH ADVISORY SOLUTION SERVICES Note: Includes all recent and past consultancy services

  16. Slide 16: JV & Construction Partners

    JV & CONSTRUCTION FASTER I CHEAPER I SUSTAINABLE IFLEXIBLE PARTNERS JOINT VENTURES IP R&D PROJECT SOLUTION Note: Includes all recent and past consultancy services

  17. Slide 17: The Sustainable Partner for Parking Infrastructure

    THE SUSTAINABLE PARTNER FOR PARKING INFRASTRUCTURE BRONTE HOWSON PETER MCUTCHEN bhowson@parkdgroup.com pmcutchen@parkdgroup.com +61 8 9429 8863 +61 431020429 TRANSFORMATIONAL CAR PARKS FOR A CHANGING WORLD.

PARKD — Investor Presentation (November 2022) on 6ix