Xpedra Resources Limited · ASX:XPD

Xpedra Resources — Valor Resources — Investor Presentation (November 2017)

24 slides from Xpedra Resources's investor presentation, November 2017

  1. Slide 1: Taking the Berenguela Copper-Silver Project to the Next Level

    TAKING THE BERENGUELA COPPER-SILVER PROJECT TO THE NEXT LEVEL BERENGUELA PROJECT Investor Presentation November 2017 Valor Resources Limited - Investor Presentation November 2017

  2. Slide 2: Forward Looking Statements & Disclaimer

    FORWARD LOOKING STATEMENTS & DISCLAIMER This presentation contains forward looking statements. Forward looking statements are often, but not always, identified by the use of words such as "seek", “target”, "anticipate", “forecast”, "believe", "plan", "estimate", "expect“ and "intend“ and statements

  3. Slide 3: Berenguela Project Summary & Investment Highlights

    BERENGUELA PROJECT SUMMARY & INVESTMENT HIGHLIGHTS TAKING BERENGUELA TO THE NEXT LEVEL 100% ownership of the Berenguela Project, an advanced stage copper-silver asset located in the Puno Department of Peru. Excellent Drill Results from 2017 Program Approximately 9,100 metres drilled Substantial incr

  4. Slide 4: Company Overview

    COMPANY OVERVIEW TOP 20 TOP 50 CORPORATE SNAPSHOT SHAREHOLDERS SHAREHOLDERS ASX Code VAL Shares on Issue 1.45 bil Market capitalisation (at $0.02 per share) ~$29.2m Options on issue at $0.02 (exp. 31 Dec 18) 25,000,000 ~57% ~70% Options on issues at $0.004 (exp. 15 Dec 18) 133,333,334 Cash at bank (

  5. Slide 5: Achievements and Upcoming Milestones

    ACHIEVEMENTS AND UPCOMING MILESTONES SIGNIFICANT VALUE DRIVERS WITH A CLEAR PATH TO PFS 2017: 2018: Completed 9,100m drill DECEMBER programme with outstanding Model high grade high grade results silver and copper mineralisation Raised $3.1m in EARLY FEBRUARY APRIL-AUGUST/SEPTEMBER JUNE oversubscribe

  6. Slide 6: Berenguela Project Location

    BERENGUELA PROJECT LOCATION GREAT LOCATION NEAR VITAL INFRASTRUCTURE BERENGUELA PROJECT ECUADOR COLOMBIA BRAZIL PERU PACIFIC OCEAN Berenguela concessions are located within the Department of Puno, approximately 50km west of the city of Juliaca and CENTRAL POINT East: 331,400 6km NE of the town of Sa

  7. Slide 7: Peru's Copper Belt

    PERU’S COPPER BELT ONE OF THE WORLD’S MOST PROLIFIC COPPER BELTS Berenguela is within a well known and mature minerals belt in Southeastern Peru, which hosts several very large mines, deposits and projects. LAS BAMBAS - MMG 7.7 mil tonnes of HAQUIRA - FIRST QUANTUM contained Cu 2.3 mil tonnes of con

  8. Slide 8: Land Package & Deposit

    LAND PACKAGE & DEPOSIT 6,594 HECTARES OF CONCESSIONS WITH NEAR SURFACE MINERALISATION Berenguela central deposit comprises about 2.1% (approximately 140 hectares Mineralisation starts at surface and deposit is open at depth. - in black outline) of the total Berenguela land package Deposit extends fo

  9. Slide 9: Outstanding Drill Results: Central Zone

    OUTSTANDING DRILL RESULTS HIGH GRADE, NEAR SURFACE MINERALISATION IN CENTRAL ZONE 2017 Drill Holes in RED 57 m @ 0.96% Cu + 151.1 g/t Ag + 7.15% Mn + 0.97% Zn (from 3m): 32m @ 2.07% Cu + 143.64 g/t Ag + 10.59% Mn + 0.35% Zn (from 59m): 50 m @ 1.39 Cu% + 130.77 Ag g/t + 11.63 Mn% + 0.34 Zn% (from 14

  10. Slide 10: Outstanding Drill Results: Western Limb

    OUTSTANDING DRILL RESULTS HIGH GRADE, NEAR SURFACE MINERALISATION IN WESTERN LIMB 2017 Drill Holes in RED 96 metres at 0.85% Cu + 126.12 g/t Ag + 7.00% Mn + 0.28% Zn from 0 metres, including: 42 metres at 0.98% Cu + 124.93 g/t Ag + 9.26% Mn + 0.32% Zn from 46 metres. 32 metres at 0.89% Cu + 170.42 g

  11. Slide 11: Berenguela Deposit Site

    BERENGUELA DEPOSIT SITE 1.4 KILOMETRES Near surface mineralisation amenable to open pit mining 1.4 kilometre of strike, open at depth Valor Resources Limited - Investor Presentation November 2017 11

  12. Slide 12: JORC Resource Update

    JORC RESOURCE UPDATE 564 MILLION POUNDS OF CONTAINED COPPER (CIRCA 257,000 TONNES); & 93 MILLION OUNCES OF CONTAINED SILVER (89% INDICATED & 11% INFERRED) Tonnes Ag Grade Cu Grade Mn Grade Zn Grade CuEq JORC (millions) (g/t) (%) (%) (%) (%) Indicated 22.61 113.91 1.002 9.93 0.36 1.687 Inferred 2.92

  13. Slide 13: 2018 Drilling Program

    2018 DRILLING PROGRAM TARGETING FURTHER HIGH GRADE EXTENSIONS & RESOURCE EXPANSION 2018 Drilling program designed to target high grade extensions of the Berenguela deposit. Approximately 7,000 metres of total RC and Diamond Drilling planned. Targeting increase in strike length as well as resource ex

  14. Slide 14: Further Resource Expansion

    FURTHER RESOURCE EXPANSION INCREASING RESOURCE WITH MINERALISED INTERCEPTS OUTSIDE THE INFERRED RESOURCE SHELL Identified 3 new, mineralised extension zones outside of the previous Inferred Shell. 2 deeper zones have been identified. 2017 Expansion holes include: 36 m @ 1.18% Cu + 78.48 g/t Ag + 10.

  15. Slide 15: Investment Summary

    INVESTMENT SUMMARY DRIVING POSITIVE OUTCOMES FOR INCREASED FUTURE VALUE FOR SHAREHOLDERS Significantly increased JORC Resource expansion drill Significant exploration potential – Resource with potential upgrades programme to commence early current resource only 2.1% of 6,594 to follow 2018 hectare l

  16. Slide 16: Contact

    CONTACT 22 Lindsay Street, Perth, WA Australia, 6000 Tel: +61 8 9200 3467 www.valorresources.com.au Mark Sumner, Chairman msumner@valorresources.com.au Brian McMaster, Non-Executive Director bmcmaster@valorresources.com.au Follow us on Twitter @valorresources Valor Resources Limited - Investor Prese

  17. Slide 17: Appendix 1: Board & Management Background

    APPENDIX 1: BOARD & MANAGEMENT BACKGROUND HIGHLY EXPERIENCED TEAM Mark Sumner - Executive Chairman Founder and MD of Kiwanda Group LLC, a US-based investment and venture capital business focused on mining and exploration projects in South America. Mark has over 10 years of experience financing and d

  18. Slide 18: Appendix 2: Peru Overview

    APPENDIX 2: PERU OVERVIEW SUPPORTIVE INVESTMENT CLIMATE, ACTIVELY SEEKING FOREIGN COLOMBIA ECUADOR INVESTMENT Establishing itself a premier mining jurisdiction in South America Stable, presidential democratic republic BRAZIL PERU Focused on economic growth, reducing bureaucratic red tape and driving

  19. Slide 19: Appendix 3: Upgrading the Resource

    APPENDIX 3: UPGRADING THE RESOURCE SIGNIFICANT INCREASE IN INDICATED TONNAGE Inferred (Brown): 11% of Total Resources Indicated (green): 89% of Total Resources NORTH Valor Resources Limited - Investor Presentation November 2017 19

  20. Slide 20: Appendix 4: High Grade Copper Model

    APPENDIX 4: HIGH GRADE COPPER MODEL HIGH GRADE COPPER INTERCEPTS DELINEATE NEW TARGETS Intercept Cu Grade Ag Grade Platform Drill Hole (m) (%) (g/t) Dark Orange – High Grade Cu over 1.5% BEP002 BER235 7 2.18 1,719 BEP005 BER251 8 3.12 455.50 BEP022 BER272 13 2.57 79.62 BEP029 BER244 9 3.02 107.11 BE

  21. Slide 21: Appendix 5: High Grade Silver Model

    APPENDIX 5: HIGH GRADE SILVER MODEL HIGH GRADE SILVER INTERCEPTS DELINEATE NEW TARGETS Intercept Cu Grade Ag Grade Platform Drill Hole (m) (%) (g/t) Dark Blue – High Grade Silver BEP001 BER290 7 1.39 257.42 BEP002 BER235 7 2.18 1,719 BEP005 BER251 8 3.12 455.50 BEP007 BER227 13 1.34 319 BEP025 BER27

  22. Slide 22: Appendix 6: High Grade Silver Zone

    APPENDIX 6: HIGH GRADE SILVER ZONE BONANZA GRADE SILVER INTERCEPTS Full Mineralisation Analysis for BER-246 (High Grade Silver Zone): 2005-2006 High Grade Silver Intercepts in adjacent area: 16 m @ 1.88% Cu + 1,243.31 g/t Ag + 10.43% Mn + 0.39% Zn (from 59m) 430 g/t across 2005 Section 10400N 8m @ 2

  23. Slide 23: Appendix 7: Community Relations

    APPENDIX 7: COMMUNITY RELATIONS EXCELLENT RELATIONS WITH LOCAL COMMUNITIES & LANDOWNERS Positive relationships with local landowners and communities Land use agreements were signed in 2016 and good through 2021 Continues the Berenguela tradition of hiring local geologists and field support workers f

  24. Slide 24: Appendix 8: CuEq Calculations

    APPENDIX 8: CuEq CALCULATIONS Copper Equivalent Calculations & Recoveries Assumptions The calculation formula used to calculate the reported Copper Equivalent (CuEq %) is as follows: Cu Eq (%) = Cu G (%) + ((Ag G / 10000) x Ag P x C x ReAg) / (Cu P x ReCu) + (Zn% x Zn P x ReZn) / (Cu P x ReCu) Equat