  1. Slide 1: Re-lodgement of Investor Presentation 22 August 2025

    27 August 2025 Cannindah Resources Ltd Re-lodgement of Investor Presentation 22 August 2025 Cannindah Resources Ltd (ASX:CAE, the Company) refers to the Investor Presentation lodged with For personal use only the ASX on Friday 22 August 2025 and attaches a replacement Investor Presentation, noting t

  2. Slide 2: Building a Critical Metal's Company focused on Copper

    For personal use only Building a Critical Metal’s Company focused on Copper ASX : CAE 1 August 2025 Update

  3. Slide 3: Statements and Disclaimer

    Statements and Disclaimer This presentation includes certain forward looking statements, estimates and projections with respect to the future performance of Cannindah Resources Limited. Such statements, estimates and projections reflect various assumptions concerning anticipated results, which assum

  4. Slide 4: Investment Thesis

    Investment Thesis Base Case – What we currently have….. ➢ Current Resource containing 159Kt Cu1 Equiv2 (14.5Mt @ 1.09% Cu Equiv – discovery cost AUD $0.035 lb) For personal use only ➢ Metallurgical testwork2 delivered favourable results for Cu Au Ag ➢ Strategically located with excellent infrastruct

  5. Slide 5: Corporate Snapshot

    Corporate Snapshot Metric Share Price Performance For personal use only Shares on Issue 728m Share Price (as of 18 August 2025) $0.020 Market Capitalisation $14.50m Top 20 shareholders 67% Board and Management Role Michael Hansel Chairman Interim CEO Cameron Switzer Exploration Manager Tony Rovira N

  6. Slide 6: Upside Case - Breccia Extension Targets

    Upside Case - Breccia Extension Targets 1 Plan Plan • Structurally controlled breccia 200RL • For personal use only TARGET Our understanding indicates that changes in strike and dip of breccia critical to the development EXTENSION Plan 275 RL of mineralisation1 • Evidence for the development of “sho

  7. Slide 7: Upside Case - Breccia Drill Target Extensions

    Upside Case - Breccia Drill Target Extensions CAE020, CAE023, CAE026, CAE027 collared in CAE018 Hanging wall, did not intersect interpreted ore CAE017 CAE020 shoot3 For personal use only CAE023 Open ended fertile fault, structure trends to the NE3 CAE026 CAE027 Open ended fertile fault with 700m str

  8. Slide 8: Upside Case - Transformational Targets

    Upside Case - Transformational Targets ➢ Two (2) targets outlined so far For personal use only ➢ Size of the targets is equivalent to many global porphyry Cu Au signatures 14.5Mt @ 1.09% Cu1 including Cadia Hill ➢ Targets defined by a coincidence of Eastern Target 1. Soil sampling results 2. Rock ch

  9. Slide 9: Southern Target

    Southern Target 14.5Mt @ 1.09% Cu1 For personal use only Target defined by ➢ A 1400m by 100m - 500m @ + 1000ppm Cu anomaly4 ➢ Coincident Au anomaly @ 0.1 gt and Mo anomaly @ 70ppm4 ➢ Large volume skarns are observed as well as porphyry A, B and C veins – geology supports the target4 ➢ Halo drill hol

  10. Slide 10: Coincident Au Mo geochemistry – further support

    Coincident Au Mo geochemistry – further support For personal use only Source: Behre Dolbear Independent Technical Review to Queensland Ores Limited, (ASX:QOL 30 March 2005) (images same scale) 9

  11. Slide 11: Halo Holes and Geology Support Target

    Halo Holes and Geology Support Target ➢ Historic shallow holes are 30m to 60m, only several to 200m For personal use only ➢ Halo holes important for footprint definition and for “pencil” vectoring ➢ Porphyry systems have +1500m vertical extent requiring drilling to 1800m. There is only one hole on t

  12. Slide 12: Southern Target Schematic Interpretation

    Southern Target Schematic Interpretation For personal use only ➢ Historic shallow halo holes are drilled in outer pyrite halo zone ➢ Many of the holes display the key indicator of increasing Cu grades downhole ➢ No previous deep drilling to +1000m completed testing for “Pencil” high grade porphyry t

  13. Slide 13: Eastern Target – earlier stage but large

    Eastern Target – earlier stage but large ➢ Predominantly under cover – not a focus of previous exploration (no For personal use only soils etc) ➢ Anomalous rocks to 0.3% Cu, 0.3 gt Au associated with magnetite where subcrop observed4 Eastern Target ➢ Skarns intersected in drill holes with halo resul

  14. Slide 14: Conclusions – No Cu junior has Two Tier size targets in their portfolio

    Conclusions – No Cu junior has Two (2) Tier 1 size targets in their portfolio • Cannindah Breccia resource is a great starter, discovery cost AUD$0.035c lb For personal use only Base Case • 100% owned, infrastructure advantages, critical commodity • 5% of identified mineral system has been explored

  15. Slide 15: Appendix Cannindah Breccia Mineral Resource (MRE)

    Appendix 1 Cannindah Breccia Mineral Resource (MRE) On 3 July 2024 Cannindah Resources Limited announced a significant upgrade of the Mineral Resource Estimate (MRE) for the Mt Cannindah project (ASX:CAE “Significant update to Mt Cannindah Resource”). For personal use only The MRE was prepared by in

  16. Slide 16: Appendix – Copper Equivalent

    Appendix 2 – Copper Equivalent Formula for Copper Equivalent calculations For personal use only Copper equivalent has been used to report the wider copper bearing intercepts that carry Au and Ag credits, with copper being dominant e.g. have confidence that existing metallurgical processes would reco

  17. Slide 17: Appendix – Historic Data

    Appendix 3 – Historic Data Previous exploration has been conducted by multiple companies. The Mt Cannindah Project has an exploration history in excess of 60 years. Cannindah Resources has generally confirmed the veracity of the historic data. Data used for evaluating the Mt Cannindah project includ

  18. Slide 18: Discovery History – Example Ridgeway NSW

    Discovery History – Example Ridgeway NSW6 ➢ Target identified by drilling an IP anomaly along strike from 6 Moz’s Au For personal use only ➢ It took Four (4) phases of drilling to deliver the initial economic 1 3 high grade intersection ➢ The mine produced 7 Moz’s Au Equiv at negative ASIC (cash cow