Bengal Energy Ltd. · TSX:BNG
Bengal Energy — Investor Presentation (December 2013)
33 slides from Bengal Energy's investor presentation, December 2013

Slide 1: High Impact International Exploration & Production
HIGH IMPACT INTERNATIONAL EXPLORATION & PRODUCTION DECEMBER 2013

Slide 2: Investment Highlights
INVESTMENT HIGHLIGHTS Material production and cash flow growth potential High-quality light oil through near-term development / appraisal & gas assets in low- risk, stable countries: Large acreage positions; inventory of Australia & India underdeveloped pools & significant resource play potentia

Slide 3: Corporate Profile
CORPORATE PROFILE Financial TSX Ticker TSX: BNG Common Shares Outstanding – Basic 64.3MM Production up -Fully Diluted (FD) 69.8MM Insider Holdings (FD) 24.5% Net Debt Market Cap (@ $0.60 / share) ~$8MM $38MM 46% Australia only P+P Reserve Value PV10(1) $40.6MM @ 30.357% interest $48.7MM Over prior q

Slide 4: Bengal Leadership Team
BENGAL LEADERSHIP TEAM Management Board of Directors Chayan Chakrabarty, PhD (Pet Eng), MBA - Ian Towers, P.Eng – Chairman President, CEO & Director Dolomite Energy; Former President & CEO, Rio Alto President, CEO & Director International Formerly Daylight Resources, Verenex, Ross Smith Energy Group

Slide 5: Defined Business Strategy
DEFINED BUSINESS STRATEGY Capture near term value through low risk inventory of development DEVELOP drilling in proven petroleum systems Leverage experience and core competencies to further de-risk at the APPRAISE prospect level Enhance value through proven expertise, technology utilization and cost

Slide 6: Recent Highlights
RECENT HIGHLIGHTS Successful Cuisinier drilling program of 6 wells Transitioned from yielded 100% success rate pure exploration to production Drilled first exploration well in Tookoonooka at Caracal-1, new light oil discovery; 52 API Secured Beach Energy farm out, valued up to Advanced commis

Slide 7: Asset Overview
ASSET OVERVIEW Assets in proven, producing basins Large and under-explored acreage offers significant growth opportunity 2.2 MM acres total High potential impact without typical international risk Cooper Basin; Well-established regulatory framework with British Australia resource play common

Slide 8: Cooper Basin Highlights
COOPER BASIN HIGHLIGHTS Cooper Most prolific onshore basin in Australia Basin Under explored & under exploited: creates opportunity Transfer knowledge and technology from mature basins to enhance recovery & success factors Resource play potential Pipeline and transportation infrastructure

Slide 9: Assets Situated in Oil Prone Flanks
QUEENSLAND ASSETS SITUATED IN OIL PRONE FLANKS SOUTH NEW AUSTRALIA SOUTH WEST FLANK IS PROVEN WALES EXPLORATION AREA Partner, Beach Energy targeting CUISINIER ~10,000 boe/d of net production in CARACAL West Flank* WEST FLANK Four onshore permits span entire GAS FAIRWAY exploration to production

Slide 10: Bengal's Cooper Basin Operations
QUEENSLAND BENGAL’S COOPER BASIN OPERATIONS SOUTH NEW AUSTRALIA SOUTH BARTA BLOCK: WALES 360,000 acres BARTA 30.4% working interest(1) CUISINIER BARROLKA TOOKOONOOKA DISCOVERY Cuisinier light oil discovery (52° API) CARACAL-1 Partnered with experienced area operator DISCOVERY ASPEN WOMPI TOOKOON

Slide 11: Barta Permit (PL 303): Cuisinier
BARTA PERMIT (PL 303): CUISINIER 2013 PROGRAM SET THE STAGE FOR MORE AGGRESSIVE CUISINIER NORTH 3D DEVELOPMENT PROGRAM IN 2014 14 wells drilled to date; 100% success Attractive cash flow potential with strong operating netbacks in Cuisinier(1) coupled with rising production CUISINIER Continued

Slide 12: Creating Value in Cuisinier
CREATING VALUE IN CUISINIER CONTINUED SUCCESS EXPANDS POOL AREA Petroleum Lease (PL303) granted, Cuisinier oil processed at Cook facility Pipeline connectivity eliminates production CUISINIER FIELD curtailments due to trucking capacity 3D seismic to high grade areas of better COOK TO sand deve

Slide 13: Tookoonooka Permit (ATP 732P)
KENMORE TOOKOONOOKA PERMIT (ATP 732P) 13.6MMBbls(1) CARACAL DISCOVERY SUPPORTS IPUNDU 4.3MMBbls(2) ONGOING DEVELOPMENT Amidst some of onshore Australia’s largest producing fields First well, Caracal 1, cased as future light oil producer (52° API) Caracal-1 Discovery Beach Energy …..says Beach En

Slide 14: ATP 732, Caracal – Appraisal & Development
ATP 732, CARACAL – APPRAISAL & DEVELOPMENT LONGER TERM POTENTIAL AT TOOKOONOOKA TRIODIA-1 WYANDRA OIL SHOW Future appraisal wells targeting thicker Lower Wyandra section TANGALOOMA-1 WYANDRA Second well at Caracal APPRAISAL & HUTTON TEST (Tangalooma-1) to test both Wyandra and deeper Hutton targ

Slide 15: ATP 732, Caracal – Targeting the Deeper Hutton
ATP 732, CARACAL – TARGETING THE DEEPER HUTTON Targeting the deeper Hutton sandstone Next well to be drilled, Tangalooma-1, will target crest of the structure (missed by Triodia-1 in 1997) Hutton pressured by bottom water drive contributing to significant initial production (IP) rates & high r

Slide 16: India Overview & Cauvery Basin
INDIA OVERVIEW & CAUVERY BASIN BENGAL’S ONSHORE BLOCK ~946 km 2 INDIA 30% working interest Light oil prone (35 - 52˚ API) Bengal’s 600 km2 3D completed Onshore Block Near term, high impact drilling - 3 wells planned CY-ONN-2005/1 in Q1 calendar 2014 for US$4.1MM (fully funded) Bengal’s Partn

Slide 17: Cauvery Onshore – Cochise Prospect
CAUVERY ONSHORE – COCHISE PROSPECT 600 Km2 of 3D shot & interpreted; 3 drill locations finalized Each location tests a different play type in a different part of the permit. First well to spud before end March 2014 Cochise Prospect targets Lower Cretaceous Andimadam Formation Cochise Locatio

Slide 18: Building the Value Chain
BUILDING THE VALUE CHAIN Cuisinier – Current cash flow, near and longer term drilling – proven oil DEVELOP potential across a broad area, represents resource play potential Tookoonooka – Prospective with substantial partner, discovery / APPRAISE appraisal mode. Future exploration upside India – Expl

Slide 19: Upcoming Operational Catalysts
UPCOMING OPERATIONAL CATALYSTS(1) 2013 2014 2015 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 CUISINIER Tie-in 6th well of 2013/14 drilling campaign Close acquisition of additional interest Drill 8 wells (6 development / 2 appraisal) Drill 1 exploration well TOOKOONOOKA (BEACH FARM-IN) Drill 1st well under Beach Farm-In

Slide 20: Reserves Growth
RESERVES GROWTH ANNUAL PROVED PLUS PROBABLE RESERVES (MBOE) BENGAL NET RESERVES(1) AS AT YEAR END MARCH 31 167% growth year over year 1,698 mboe 1,698 9% 7,465 growth year over year mboe 585 637 2011 2012 2013 Proved + Probable Possible (1) Based on independent, qualified reserves evaluator GLJ Petr

Slide 21: Bengal Production Growth
BENGAL PRODUCTION GROWTH NET AVERAGE DAILY PRODUCTION VOLUMES – QUARTERLY ACTUALS (BOE/D) Natural Gas (boe/d) Production growth directly linked to Cuisinier drilling 518 Crude Oil & Liquids (boe/d) 33 356 325 40 38 203 18 485 316 287 65 185 27 38 30-Sep-12 31-Dec-12 31-Mar-13 Jun-30-13 30-Sep-13 21

Slide 22: Value Creation for Shareholders
VALUE CREATION FOR SHAREHOLDERS PRODUCTION PER SHARE GROWTH (NET) Average daily production (boe/d) per million basic shares outstanding 8.1 (not debt adjusted) 6.2 5.8 3.9 1.2 30-Sep-12 31-Dec-12 31-Mar-13 30-Jun-13 30-Sep-13 22

Slide 23: Bengal Cash Flow Growth
BENGAL CASH FLOW GROWTH BENGAL FUNDS FLOW FROM (USED IN) OPERATIONS(1) $2,063 Funds from (used in) operations $1,732 Per Share (basic) $1,151 $0.03 $0.03 $481 $0.02 $0.01 Q1/13 Q2/13 Q3/13 Q4/13 Q1/14 Q2/14 ($62) ($471) ($0.00) ($0.01) Quarter Ending (1) Funds flow from operations is a non-IFRS meas

Slide 24: Bengal Offers Lower Risk with Higher Reward
BENGAL OFFERS LOWER RISK WITH HIGHER REWARD COUNTRY RISK RATING SCALE(1): HIGHER RATING = LOWER RISK Lower risk, Lower risk, higher netbacks 90 Lower netbacks (Most desirable) 80 TAO NZ 70 BNG AEN Higher Rating = Lower Risk 60 Country Risk Rating: 50 CNE SRN PTA VLE 40 MMT SKO BNK CYG 30 KUB SDX 20

Slide 25: Strong Cash Flow Drivers
STRONG CASH FLOW DRIVERS OPERATING NETBACKS FOR TSX/TSXV LISTED INTERNATIONAL PRODUCERS (C$/BOE) $90 $77.87 Cuisinier operating netback as $80.67 reported in Q2 fiscal 2014 $80 $77.23 $73.30 $72.51 $70 $63.09 $59.58 $58.90 $60 $57.88 $51.01 $49.85 $50 $47.91 $45.08 $40.90 $40 $30.34 $30 $20 $10 $- P

Slide 26: Why Bengal?
WHY BENGAL ? Material production, cash flow & reserves CASH FLOW growth potential GROWTH Large acreage positions; sizeable inventory of low risk drilling underpins organic growth EXPANDING Very strong cash flow drivers: high netbacks + PRODUCTION & production growth RESERVES Significant near

Slide 27: Appendix
APPENDIX

Slide 28: Fiscal 2014 Preliminary Appraisal Plan
FISCAL 2014 PRELIMINARY APPRAISAL PLAN 2013 drilling program – drilled 6 appraisal Murta Depth Structure locations – all successful oil wells Program success has now set the stage for more aggressive development program starting in 2014 with 8 development & appraisal wells planned Significant

Slide 29: Tookoonooka, ATP 732P Caracal
TOOKOONOOKA, ATP 732P CARACAL Caracal 1, cased as future oil producer (52° light oil) Located on a large, robust structure Core analysis has highlighted better reservoir development in lowermost Wyandra sand. Pool analogies show this Lower sands has better effective porosity & permeability CAR

Slide 30: Forward-Looking Statements
FORWARD-LOOKING STATEMENTS Certain information regarding Bengal set forth in this document contains forward-looking statements or financial outlooks (collectively, "forward-looking statements") under applicable securities law. The use of any of the words “plan”, “expect”, “project”, “intend”, “belie

Slide 31: Forward-Looking Statements
FORWARD-LOOKING STATEMENTS Readers are cautioned that the foregoing list of factors is not exhaustive. Additional information on these and other factors that could effect Bengal’s operations and financial results are included in reports on file with Canadian securities regulatory authorities and may

Slide 32: Fundamental Resource Definitions
FUNDAMENTAL RESOURCE DEFINITIONS Total Petroleum Initially-In-Place (TPIIP) is that quantity of petroleum that is estimated to exist originally in naturally occurring accumulations. It includes that quantity of petroleum that is estimated, as of a given date, to be contained in known accumulations,

Slide 33: Cautionary Statements
CAUTIONARY STATEMENTS Analogous Information: Certain noted drilling, completion, production, reserve and resource data provided in this document may constitute “analogous information” under applicable securities legislation, such as reserve and resource estimates or the reserves and resources presen
Source: Internet Archive copy of bengalenergy.ca
More decks from Bengal Energy Ltd.
Shareholder Meeting (September 2026)13 slides · Sep 17, 2026
QEC Investment Showcase 20239 slides · May 2, 2023
Investor Presentation (October 2022)11 slides · October 2022
Investor Presentation (May 2022)18 slides · May 2022
Investor Presentation (February 2022)23 slides · Feb 11, 2022
Shareholder Meeting (September 2021)23 slides · Sep 28, 2021