Bengal Energy Ltd. · TSX:BNG
Bengal Energy — Shareholder Meeting (September 2026)
13 slides from Bengal Energy's shareholder meeting presentation, Sep 17, 2026
Slide 1: Annual General Meeting Presentation
BENGAL ENERGY ANNUAL GENERAL MEETING PRESENTATION SEPTEMBER 17, 2026
Slide 2: Forward-Looking Statements, Cautionary Statements and Oil & Gas Advisories
Forward-Looking Statements, Cautionary Statements and Oil & Gas Advisories Certain information regarding Bengal Energy Ltd. ("Bengal" or the "Company") set forth in this document contains forward-looking statements or financial outlooks (collectively, "forward-looking statements") under applicable s
Slide 3: Cautionary Statements (cont'd)
Cautionary Statements (cont’d) Future Oriented Financial Information This document contains future oriented financial information ("FOFI") within the meaning of applicable securities laws. The FOFI has been prepared by Bengal's management to provide an outlook of the Company's activities and results
Slide 4: Corporate Snapshot
CORPORATE SNAPSHOT CAPITAL STRUCTURE Exploring and producing hydrocarbon assets in Australia for more than 15 years, TSX code BNG Bengal Energy has a producing asset together with diverse operated growth opportunities and positive working TSX share price C$0.025 capital. The Company has successfully
Slide 5: Non-Executive Board members
Non-Executive Board members Experienced and Committed Industry Experts Dr. Brian Moss, Ph.D. (Geol) Bill Wheeler, CFA Neal Grant, P.Eng., MBA Chairman of the Board Director Director Brian Moss has more than 25 years of international Private investor. Co-founder of Leith Wheeler Based in Adelaide, Au
Slide 6: High Impact Oil and Gas Projects
TOP-TIER JURISDICTION HIGH IMPACT OIL Production, development and exploration assets in Australia’s Cooper Basin, Joint Venture ROFR exercise allowed. Proximity to Asia provides significant advantage to supply developing AND GAS PROJECTS markets. IN AUSTRALIA’S COOPER BASIN HIGH GROWTH POTENTIAL Str
Slide 7: Current Strategy in a Low-Cost Environment
FOCUS ON INITIATING AND ENABLING ACTIVITIES NEAR-TERM • Management is focused on a number of high-impact projects. • Projects targeted primarily at effecting activities on 100% owned and operated oil assets. CURRENT STRATEGY COST-CUTTING MEASURES IMPLEMENTED IN A LOW-COST ENVIRONMENT • As press-rele
Slide 8: Cuisinier Crude Oil: World-Class Realized Pricing
CUISINIER CRUDE OIL: WORLD-CLASS REALIZED PRICING • Cuisinier oil historically transported through Santos's infrastructure and sold at Pt. Bonython in South Australia for Asian markets • Average realized price consistently at a significant premium to Dated Brent: ~26% fiscal year to date / ~6% over
Slide 9: Acreage Position Queensland's Cooper Basin
ACREAGE POSITION Queensland’s Cooper Basin Cuisinier 2P Reserves 5.78 MMbbls FOUND HYDROCARBON OIL FIELD – 100% • Ramses-2 Jurassic Oil found; flowed oil to surface, and tested – awaiting longer duration testing PCA 332 TOOKOONOOKA – 100% • Cretaceous (e.g., Caracal-1 oil discovery) and Jurassic oil
Slide 10: Ramses-2 Poolowanna Oil Test
Ramses-2 Poolowanna Oil Test Ramses-2Tested Oil & Ramses Pool Oil Development: 100% Owned PL 188 • Ramses-2 DST1 (7654-7674ftRT) Jurassic Poolowanna • DST’d at 588 bopd at 2 hrs; insufficient data for analysis • FMT pressure ~3440 psi • 37oAPI at 60 degF, Pour point 36 degC. Recovery 49 Bbl Oil • Ca
Slide 11: Tookoonooka Project – Permit PCA 332, 100% WI
TOOKOONOOKA PROJECT – Permit PCA 332, 100% WI SE Oil Province – Cooper Basin, Queensland PROJECT DETAILS • PCA 332 (332 Km2) - lies within the SE Cooper oil province • Recoveries from adjacent fields range from 3 – 6 MMstb to date (still producing) * • Primary reservoirs: Hutton Sst, Birkhead Fm, an
Slide 12: Sustainable Development
SUSTAINABLE DEVELOPMENT Bengal Energy strives to be an active player of local communities and promote sustainable work practices 01 02 03 04 HEALTH AND ENVIRONMENTAL SOCIAL PEOPLE FIRST SAFETY STEWARDSHIP RESPONSIBILITY • Maximizing local • Health and safety is Bengal’s • Targeting a low carbon • In
Slide 13: Thank You
THANK FOR MORE INFORMATION: www.bengalenergy.ca YOU Suite 640 630 6th Ave S.W. https://bengalenergy.ca/technology/early-gas-production-system Calgary, AB, Canada, T2P 0S8 https://bengalenergy.ca/technology/early-oil-production-system/ E: investor.relations@bengalenergy.ca T: +1-403-205-2526