Apex Resources Inc. · TSXV:APX
Apex Resources — Investor Presentation (June 2024)
19 slides from Apex Resources's investor presentation, June 2024
Slide 1: Corporate Presentation June 2024
Corporate Presentation June 2024 NEWLithium New LITHIUM Brine BRINE DEPOSIT Deposit DISCOVERY POTENTIAL Discovery Potential IN NEVADA U.S.A. APXRESOURCES.COM TSX-V : APX
Slide 2: Cautionary Statement
Cautionary Statement All information included in this presentation, including any information as to the Company’s future financial or operating performance, and other statements that express management’s expectations or estimates of future performance, other than statements of historical fact, const
Slide 3: Opportunity
Opportunity New Discovery Potential Tier 1 Mining Jurisdiction Epicenter of US Battery Industry The Lithium Creek project is a • Nevada is consistently rated Close proximity to industry district scale exploration a Tier 1 Mining district.* leaders like Tesla, who are project that has never been • Ne
Slide 4: Location
Jindalee (ASX: JRL) Surge Battery Metals (TSX: Lithium Americas (TSX:LAC) Location Thacker Pass Project (Claystone) McDermitt Project (Claystone) NILI) Nevada North Lithium (Claystone) The Reno area is an Reno-Tahoe Industrial Center epicenter for the US Battery Industry The Lithium Creek Project is
Slide 5: Geological Model – Lithium Brine
Geological Model – Lithium Brine Target’s geological setting is modeled on Albemarle’s Silver Peak Lithium Project – the longest producing Lithium project in the USA. Exploration for a new Lithium Brine Discovery The oldest active lithium production site in the USA is Albemarle’s Silver Peak solar e
Slide 6: Lithium Creek Project
Two discoveries of lithium and boron in brine waters have been made close in Lithium Creek Project proximity in Churchill County, Nevada, each displaying brines with lithium in anomalous concentrations at shallow depths. • Laboratory analyses indicate total lithium concentrations range from approxim
Slide 7: Recent Exploration Results
Summary of Lab Results Recent Exploration Results • Collection of surface water samples at the Lithium Creek sampling locations consisted of LC-1 on the ESW prospect and LC-2 on the ESW-S prospect. • Collection of surface water from historic evaporation vats at Leete’s Eagle Salt Works on the ESW pr
Slide 8: Geological Setting and Basic Conceptual Model
Geological Setting and Basic Conceptual Model Project Area • The ESW, ESW-E, ESW-S and Li claims are within the Fernley Sink area which is the transition zone between the Walker Lane faulting zone and the Basin and Range Province. • A dextral (right lateral strike-slip) motion diffuses into northwes
Slide 9: Brady's Hot Springs Area
101 075 Brady’s Carson Existing or Proposed Geothermal Power Facility Hot Springs Desert BLM Project Claims (Open) Area 2,013 Sq Miles BOR Project Claims (Closed) Terminus of 1,288,320 Acres Major River Basin Boundary Brady’s 178 Sq Miles Desert Peak Humboldt River Geothermal Geothermal 113,920 Acre
Slide 10: Conceptual Model Characteristics
Conceptual Model Characteristics Clayton Valley Lithium Creek Structurally closed basin with no outflow. Evaporative sink environment. Precipitation in surrounding mountains delivers water into the system through infiltration and surface flow. Water is sourced from surrounding basins through
Slide 11: Project Visuals
Project Visuals
Slide 12: Lithium Creek Infrastructure
Lithium Creek Infrastructure Just a 30 min drive east of the Reno Battery hub, the Lithium Creek project is ideally located and RENO supported by extensive infrastructure. NEVADA Road Access Power Geothermal Rail LAS VEGAS Drive up property 45 Grid access with power Abundant geothermal Rail line tra
Slide 13: Value Creation through Discovery
Value Creation through Discovery Initial Geological Work Phase One Exploration Phase Two Exploration Claim staking to acquire Geophysics including Additional geophysics maximum amount of district MT survey to define to refine geologic (On-going) geological setting model Initial survey Surficial wate
Slide 14: Clean Lithium Extraction
Clean Lithium Extraction The Lithium Creek Project’s potential as a lithium brine deposit Direct Lithium Extraction is becoming a makes it a candidate for using clean Direct Lithium Extraction game changer for the lithium industry. (“DLE”) while taking advantage of green energy sources available in
Slide 15: Made in North America Inflation Reduction Act
Made in North America Inflation Reduction Act Signed into law earmarked $70 billion towards 40% EV and battery supply chains across the United States. US battery mineral content found or processed in the In 2024, 40% of critical minerals found in EV USA in 2024 batteries will have to be extracted or
Slide 16: Share Structure
Share Structure TSX Venture Exchange: APX Common Shares – outstanding 63,162,445 Stock Options 2,039,000 Warrants 20,100,000 Fully Diluted 85,301,445 DLE Extraction Plant
Slide 17: Lithium Creek Project – Transaction Summary
Lithium Creek Project –Transaction Summary - Pursuant to the share purchase agreement with 1434001 B.C. Ltd.,who has an option on the Lithium Creek Project, US$80,000 cash payment (paid) and 18,000,000 common shares (issued) and subject to TSXV Tier 2 Value Escrow Agreement. - Pursuant to the option
Slide 18: Team
Team Management & Board Ronald (Ron) Lang Dennis Cojuco Adam Pankratz Brett Kagetsu President / CEO / Director Chief Financial Officer Independent Director Independent Director Over 35 years of executive Over 15 years of financial Professor of Economics and A senior corporate finance and management
Slide 19: Exploration for a new Lithium Brine Discovery
Exploration for a new Lithium Brine Discovery Contact: info@apxresources.com WWW.APXRESOURCES.COM Apex Resources Inc Suite 615, 650 Howe Street Vancouver, BC, V6C2T6