Apex Resources Inc. · TSXV:APX

Apex Resources — Investor Presentation (February 2025)

20 slides from Apex Resources's investor presentation, February 2025

  1. Slide 1: Corporate Presentation

    Corporate Presentation February 2025 NEWLithium New LITHIUM Brine BRINE DEPOSIT Deposit DISCOVERY POTENTIAL Discovery Potential IN NEVADA U.S.A. APXRESOURCES.COM TSX-V : APX

  2. Slide 2: Cautionary Statement

    Cautionary Statement All information included in this presentation, including any information as to the Company’s future financial or operating performance, and other statements that express management’s expectations or estimates of future performance, other than statements of historical fact, const

  3. Slide 3: Opportunity

    Opportunity New Discovery Potential Tier 1 Mining Jurisdiction Epicenter of US Battery Industry • District scale exploration • Nevada is consistently rated Close proximity to industry project. a Tier 1 Mining district.* leaders like Tesla, who are • Never systemically • Nevada is highly supportive b

  4. Slide 4: Location

    Surge Battery Metals (TSX: Location Lithium Americas (TSX:LAC) Jindalee (ASX: JRL) McDermitt Project (Claystone) NILI) Thacker Pass Project (Claystone) Nevada North Lithium (Claystone) The Reno area is an Reno-Tahoe Industrial Center epicenter for the US Battery Industry The Lithium Creek Project is

  5. Slide 5: Geological Model – Lithium Brine

    Geological Model – Lithium Brine Target’s geological setting is modeled on Albemarle’s Silver Peak Lithium Project – the longest producing Lithium project in the USA. Exploration for a new Lithium Brine Discovery The oldest active lithium production site in the USA is Albemarle’s Silver Peak solar e

  6. Slide 6: Lithium Creek Project

    Legend 7 2024 New Placer Claims (CS and HS Claims) @ Existing Project Placer Mining Claims (ESW, DSW, LC and CS Claims) # Legacy ESW Claims (BOR-Closed) AP. APEX RESOURCES INC. Las Vegas os + Carson Cty \ se Nevada\ w= State Map \" Li Creek Project Location and Claim Area Map Google Earth Imagery Pr

  7. Slide 7: Lithium Creek Project

    a a Legend 2024 New HS 2024 New Placer Claims (CS and HS Claims) Placer Claims Legacy ESW Claims (BOR-Closed) ; monstsen\ Faas Re oe z i : 2024 New ESW Claims {BOR Closed) ESW-S Clain Letidings s ci r ‘ ‘aS p1esimy ¢ @ Existing Project Placer Mining Claims (ESW, DSW, LC and CS Claims) eo Pe" tb by L

  8. Slide 8: Recent Exploration Results

    Summary of Lab Results Recent Exploration Results • Collection of surface water samples at the Lithium Creek sampling locations consisted of LC-1 on the ESW prospect and LC-2 on the ESW-S prospect. • Collection of surface water from historic evaporation vats at Leete’s Eagle Salt Works on the ESW pr

  9. Slide 9: Additional Exploration Results

    Additional Exploration Results Lithium Boron Potassium Sodium Hole ID Comments (mg/L) (mg/L) (mg/L) (mg/L) 393 774 17,900 110,000 LiCk-8-082024 Shallow Test Hole LiCk-29-082124 310 222 7,240 8,650 Shallow Test Hole LiCk-9-082124 163 178 6220 84,700 Shallow Test Hole LiCk-12-082124 112 111 6,640 55,4

  10. Slide 10: Geological Setting and Basic Conceptual Model

    Geological Setting and Basic Conceptual Model Project Area • The ESW, ESW-E, ESW-S and Li claims are within the Fernley Sink area which is the transition zone between the Walker Lane faulting zone and the Basin and Range Province. • A dextral (right lateral strike-slip) motion diffuses into northwes

  11. Slide 11: Brady's Hot Springs Area

    101 075 Brady’s Carson Existing or Proposed Geothermal Power Facility Hot Springs Desert BLM Project Claims (Open) Area 2,013 Sq Miles BOR Project Claims (Closed) Terminus of 1,288,320 Acres Major River Basin Boundary Brady’s 178 Sq Miles Desert Peak Humboldt River Geothermal Geothermal 113,920 Acre

  12. Slide 12: Conceptual Model Characteristics

    Conceptual Model Characteristics Clayton Valley Lithium Creek Structurally closed basin with no outflow. Evaporative sink environment. √ √ Precipitation in surrounding mountains delivers water into the system through infiltration and surface √ √ flow. Water is sourced from surrounding basins through

  13. Slide 13: Project Visuals

    Project Visuals

  14. Slide 14: Project Visuals

    Project Visuals AP

  15. Slide 15: Lithium Creek Infrastructure

    Lithium Creek Infrastructure Just a 30 min drive east of the Reno Battery hub, the Lithium Creek project is ideally located and RENO supported by extensive infrastructure. NEVADA Road Access Power Geothermal Rail LAS VEGAS Drive up property 45 Grid access with power Abundant geothermal Rail line tra

  16. Slide 16: Value Creation through Discovery

    Value Creation through Discovery Initial Geological Work Phase One Exploration Phase Two Exploration Claim staking to acquire Geophysics including Assay results and maximum amount of district MT survey to define assessment (On-going) geological setting Initial resource Initial survey Systematic grid

  17. Slide 17: Clean Lithium Extraction

    Clean Lithium Extraction The Lithium Creek Project’s potential as a lithium brine deposit Direct Lithium Extraction is becoming a makes it a candidate for using clean Direct Lithium Extraction game changer for the lithium industry. (“DLE”) while taking advantage of green energy sources available in

  18. Slide 18: Made in North America

    Made in North America Inflation Reduction Act Signed into law earmarked $70 billion towards 40% EV and battery supply chains across the United States. US battery mineral content found or processed in the In 2024, 40% of critical minerals found in EV USA in 2024 batteries will have to be extracted or

  19. Slide 19: Share Structure

    Share Structure TSX Venture Exchange: APX Issued and outstanding: 68,992,445 Options outstanding: 4,389,000 Warrants Outstanding: @ $0.12 expiring Mar 22, 2026 11,100,000 @ $0.12 expiring Feb 10, 2027 3,800,000 DLE Extraction Plant @ $0.10 expiring Feb 28, 2027 7,800,000 Fully Diluted: 86,961,445

  20. Slide 20: Team

    Team Management & Board Ronald “Ron” Lang Dennis Cojuco Adam Pankratz Brett Kagetsu CEO, President / Director Chief Financial Officer Independent Director Independent Director Over 35 Years of executive Over 15 years of financial Professor of Economics and A senior corporate finance and Management o

Apex Resources — Investor Presentation (February 2025) on 6ix