Linq Minerals Limited · ASX:LNQ
Linq Minerals — Shareholder Meeting (March 2026)
19 slides from Linq Minerals's shareholder meeting presentation, Mar 30, 2026
Slide 1: Gilmore Gold Copper Project – LinQ Minerals AGM
ASX :LNQ GILMORE GOLD COPPER PROJECT ASX :LNQ LinQ Minerals Limited AGM 30 March 2026
Slide 2: Important Notice
Important Notice ASX :LNQ Nature of Document : This presentation has been prepared and issued by LinQ Minerals Limited (ACN 665 642 820 ) (LinQ or the Company) to provide general information about the Company . The information in this document is in summary form and contains only a synopsis of more
Slide 3: Corporate Overview
Corporate Overview ASX :LNQ 1 Corporate Structure Substantial Shareholders Shares on Issue ~205.1m Woodcross Holdings Pty Ltd 42.05% Unlisted Options 2 ~30.9m Sam Investors Pty Ltd 10.11% Share Price 3 34.0c Michael Gibson 10.11% Market Capitalisation A$70.0m Top 10 Shareholders 71.07% Cash 3 ~A$20m
Slide 4: Investment Proposition: A Generational Asset
Investment Proposition: A Generational Asset ASX :LNQ Strategic Asset Significant Scale Growth Tier 1 Location Global JORC MRE 6 JORC Resources 100% owned Au Cu Project ~516Mt +20 mineralised prospects 1 Extensive target pipeline Not publicly visible for ~40 yrs ~3.7Moz Au & ~1.2Mt Cu +30,000m plann
Slide 5: Gilmore Project resources and copper occurrences
Gilmore Project 279Mt @ 0.34% CuEq 0.25% Cu, 0.12g/t Au, 35 ppm Mo Longest strike ~40km of continuous Cu Au ASX :LNQ occurrences in the Macquarie Arc North Red: Resources Dark Blue: >0.5% Cu Orange: Cu occurrences Light Blue: >0.1% Cu 41Mt @ 0.50% CuEq 0.29% Cu, 0.25g/t Au, 35 ppm Mo Central 43Mt @
Slide 6: Southern Development Zone
Southern Development Zone 1 ASX :LNQ 4 gold equivalent intersections >100 gram/metres reported in Phase 1 Drill Campaign GBRCD013 (Gidginbung) • 95m @ 2.14g/t Au Eq (1.89g/t Au & 0.20% Cu) from 108m; incl • 49m @ 3.78g/t Au Eq (3.37g/t Au & 0.33% Cu) from 125m TDRCD001 (Dam) • 144m @ 1.00g/t Au Eq (
Slide 7: Phase 1 Dam Results
Phase 1 Dam Results Significant thick, shallow mineralisation ASX :LNQ TDRCD001 (Dam) • 144m @ 1.00g/t Au Eq (0.55g/t Au, 0.36% Cu) from 84m TDRCD002 (Dam) • 142m @ 1.01g/t Au Eq (0.50g/t Au, 0.41% Cu) from 121m TDRCD003 (Dam) • 130m @ 1.00g/t Au Eq (0.53g/t Au, 0.38% Cu) from 108m 7 Southern Zone p
Slide 8: Central Project & Historical Drilling
Gilmore Project & Historical Drilling ASX :LNQ Southern Development Zone North Central Zone Gidginbung (3.3km strike) Monza • 40m @ 2.8g/t Au from 80m • 150m @ 1.02%Cu, 0.75g/t Au from 65m • 101m @ 2.1g/t Au from 90m • Incl. 12.7m @ 8.9% Cu, 6.15g/t Au • 77m @ 1.7g/t Au from 95m from 127m • 76m @ 1.
Slide 9: Gilmore South – Large Growth Opportunity
Gilmore South – Large Growth Opportunity ASX :LNQ >6km strike – limited drilling to date Commentary • Gidginbung/Dam part of much larger system . • Significant potential for additional porphyry and epithermal resources/ discoveries. • >6km long strike. Comparable to Cadia complex. • NW "arc transfer
Slide 10: Monza – Open High Grade, Not Yet in Resources
Monza – Open High Grade, Not Yet in Resources ASX :LNQ • High grade porphyry related copper -gold mineralisation • 150m @ 1.02%Cu, 0.75g/t Au • Including 12.7m @ 8.9% Cu, 6.15g/t Au • Open along strike north and south and at depth • Shallow drilling only tested to 450m depth • Proposed drilling up d
Slide 11: Mandamah – Central Zone
Mandamah – Central Zone ASX :LNQ Core photos from MDACD001. Left 187.5m. Potassium feldspar, magnetite and biotite altered diorite porphyry hosting quartz veined, bornite, chalcopyrite and pyrite mineralised stockwork 0.44g/t Au & 0.42% Cu Right 293.4m. Magnetite, biotite altered volcaniclastic host
Slide 12: Central Zone - Larger System?
Central Zone - Larger System? (long section view to the west) ASX :LNQ Mandamah Donnington 1.5km 134m @ 0.8% CuEq 59m @ 0.5% CuEq OPEN 150m @ 0.8% CuEq 63m @ 0.5% CuEq 40m @ 2.4% CuEq 81m @ 0.8% CuEq 105m @ 0.9% CuEq 40m @ 0.7% CuEq CuEq *thickness CuEq*thickness OPEN 77m @ 1.0% CuEq 125m @ 0.6% CuE
Slide 13: Yiddah – Significant Scale
Yiddah – Significant Scale • Very large copper -gold -molybdenum system (>2km strike). ASX :LNQ • Drill spacing nominally 200 -300m (up to 600m along strike). • Significant drill intercept widths. • Potential to yield a very large open pit operation in its own right. • Open along strike & down dip.
Slide 14: Upcoming Activities
Upcoming Activities ASX :LNQ Upcoming Company Activities Q1 CY26 Q2 CY26 Q3 CY26 Q4 CY26 Q1 CY27 Indicative Timetable Fully Funded ~$20m Drilling Southern Zone (20,000m) Dam & Greater Gidginbung Drilling Central Zone (10,000m) Monza, Mandamah, Donnington Preliminary Metallurgical Testwork Gidginbung
Slide 15: Gilmore Project – Summary
Gilmore Project – Summary ASX :LNQ Right rocks - Tier 1 Jurisdiction, infrastructure and skilled labour availability Project not publicly visible for ~ 40 years - tenement ownership has previously been fragmented Funded for + 30,000m drill program underway Organic growth - substantial regional endow
Slide 16: Appendix
ASX :LNQ Appendix 16
Slide 17: Gilmore South JORC MRE
Gilmore South JORC MRE ASX :LNQ Table 1: Mineral Resources for Gilmore South (Gidginbung & Dam) – Global grade cut off Competent Persons Statement – Mineral Resources The information in this report that relates to Exploration Results and INDICATED INFERRED TOTAL METAL Mineral Resources pertaining to
Slide 18: Gilmore Project Global JORC MRE
Gilmore Project Global JORC MRE ASX :LNQ Global Resource: 516Mt containing ~3.7Moz Au and ~1.2Mt Cu Competent Persons Statement – Mineral Resources The information in this report that relates to Exploration Results and Mineral Resources pertaining to the Gilmore Project is based on Table 1: Total Mi
Slide 19: Gilmore Project JORC MRE – Multiple Cut Offs
Gilmore Project JORC MRE – Multiple Cut Offs ASX :LNQ DEPOSIT Cut-off INDICATED INFERRED TOTAL Cu equiv METAL tonnes (Mt) Cu equiv % Cu % Au g/t Mo g/t tonnes (Mt) Cu equiv % Cu % Au g/t Mo g/t tonnes (Mt) Cu equiv % Cu % Au g/t Mo g/t Cu (Kt) Au (Koz) Mo (t) (Kt) Oxide Resources reported to a gold