  1. Slide 1: Global Leader in Sustainable Gold Mining

    TRANSFORM DIVERSIFY GROW Gold Fields Limited Global Leader in Sustainable Gold Mining Denver Gold Forum 19 to 21 September, 2011

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements Certain statements in this document constitute “forward looking statements” within the meaning of Section 27A of the US Securities Act of 1933 and Section 21E of the US Securities Exchange Act of 1934. Such forward looking statements involve known and unknown risks, uncert

  3. Slide 3: What Gold Fields Offers

    What Gold Fields Offers A Quality Reserve 76.7 million ounces of reserves1 Solid Production Base 3.5 million ounces per annum2 Geographical Diversification 50:50 (RoW:SA) production split (H1 2011) Robust Free Cash Flow US$200 million3 (H1 2011) Strong Growth Pipeline Targeting 5Moz by 20154 Conserv

  4. Slide 4: Creating a Globally Diversified Company

    Creating a Globally Diversified Company 6 months to June 2011 F2008 Production 1 2015 Target2 Production 1 11% 17% 20% 19% 40% 16% 50% 67% 20% 20% 20% South Africa West Africa Australia South America 2015 Target2 South Africa Region Australasia Region West Africa Region South America Region ~ 2 Moz

  5. Slide 5: Global Growth Portfolio

    Global Growth Portfolio Creating a leading global gold mining company Arctic Platinum Pre-Feasibility 12Moz resource (2PGE and Au) Finland Yanfolila Drilling Potential for 200kozpa starter project Mali Far Southeast F S th t Project P j t Drilling Large high-grade copper- South Deep gold porphyry wi

  6. Slide 6: South Africa Region – South Deep Project

    South Africa Region – South Deep Project Building a world-class mine Production and Capex  35Moz Reserve; 80Moz Resource ( Koz) (Koz) (oz) Rbn 800 2.5  Project milestones progressing well 600 2.0 15 1.5 400  Development and de-stress mining rates 1.0 200 0.5 improving 0 0.0 2009 A 2010 A 2011 E 2

  7. Slide 7: South America Region – Chucapaca JV Project

    South America Region – Chucapaca JV Project Chucapaca JV Project - Peru Chucapaca p JV Project j Cerro 51% Gold Fields Corona 49% Buenaventura PERU Lima Chucapaca Project Mi i Mining C Concessions i Chucapaca JV Project Gold Fields 12,700Ha 94,100Ha Buenaventura Aruntani 18 400Ha 18,400Ha 7

  8. Slide 8: South America Region – Chucapaca JV Project

    South America Region – Chucapaca JV Project 35% increase in Mineral Resource to 7.6Moz1 AuEq from 5.6Moz1 AuEq Grade Metal Tonnes Category Au Ag Cu AuEq Au Ag Cu AuEq (Mt) (g/t) (g/t) Cu (%) (g/t) (Moz) (Moz) (Mlb) (Moz) Measured ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ ‐ Indicated 92.6 1.5 11.6 0.09 1.8 4.3 34.6 178.6 5.5

  9. Slide 9: South America Region – Chucapaca JV Project

    South America Region – Chucapaca JV Project May 2010 Mineral Resource and Open Pit Shell (5.6Moz AuEq) Looking northeast, coloured by gold equivalent grades, blocks greater than 1.0 g/t AuEq E W 5.6 Moz AuEq Drilling completed to May 2010 9

  10. Slide 10: South America Region – Chucapaca JV Project

    South America Region – Chucapaca JV Project September 2011 Mineral Resource and Open Pit Shell (7.6Moz AuEq) Looking northeast, coloured by gold equivalent grades, blocks greater than 1.0 g/t AuEq E W 7.6 Moz AuEq 450 m Drilling completed to Sept 2011 10

  11. Slide 11: West Africa Region - Damang Super Pit Project

    West Africa Region - Damang Super Pit Project Targeting a four-fold increase in reserves to 4Moz at Damang Super Pit Damang Reserves (‘000 ounces) 6 000 5 000 4 000 3 000 2 000 1 000 0 June 2008 June 2009 Dec 2010 Target 2012 Damang Super Pit Other 11

  12. Slide 12: West Africa Region - Damang Super Pit Project

    West Africa Region - Damang Super Pit Project  25,000m proof of concept drilling completed  Second drilling campaign (45,000m) 50% complete Proof of Concept Drilling Results Huni Damang Juno current pit shell drill hole intersection 122m at 1.7 g/t Au surface topography 180m at 2.4 g/t Au 408m at

  13. Slide 13: West Africa Region - Damang Super Pit Project

    West Africa Region - Damang Super Pit Project Damang Superpit Conceptual Shell N Current Pit Surface -200m -400m -600m -800m Dec 2010 Reserve Shell Conceptual Extensional Pit Shell ($1,000/oz) ($1300/oz) 3 km 13

  14. Slide 14: West Africa Region - Yanfolila Project

    West Africa Region - Yanfolila Project Camp-scale opportunity  Significant land position (180 x 60km)  Property p y consolidation ongoing g g  Extensively mineralised belt MALI  Drill intensive project: 80,000 m in 2011  Focus on Komana Project in the South Bamako Yanfolila Project  Targeting

  15. Slide 15: West Africa Region - Yanfolila Project

    West Africa Region - Yanfolila Project Komana Project Area N Sanioumale 10 kilometres West 25km radius Guirin West Komana East Komana West Mali Gonka Exploration Licenses Guinea License Applications West Africa Favourable mineralised Komana corridors South Solona So o a 15

  16. Slide 16: West Africa Region - Yanfolila Project

    West Africa Region - Yanfolila Project Komana East deposit  Approximately 13,000m of drilling completed  Positive results returned from infill and extension drilling Komana East – Long Section S N KRC0267 – 19m @ 4.21g/t KRC0265 – 36m @ 5.01g/t KRCD0224 – 16m @ 4.42 g/t KRCD0407 – 20.4m @ 1.58 g/t

  17. Slide 17: Finland - Arctic Platinum Project

    Finland - Arctic Platinum Project 12Moz palladium-rich 2PGE+Au resource in a favourable mining jurisdiction1  ~12 Moz resource of 2PGE+Au  Good exploration p p potential Rovaniemi Arctic  Project economics improving Platinum Project  Price deck tripled since 2004 feasibility FINLAND  Platsol® -

  18. Slide 18: Finland - Arctic Platinum Project

    Finland - Arctic Platinum Project Moving rapidly towards feasibility study Suhanko Mining Area  Pilot plant metallurgical test work on schedule  Results expected Q4 2011 TUUMASUO2  Environmental Impact Assessment 23Mt 0.88g/t 2PGEAu VAARALAMPI2 process initiated KONTTIJÄRVI1 36Mt 0.19% Cu 0.21%Ni

  19. Slide 19: Australasia Region - Far Southeast Project

    Australasia Region - Far Southeast Project High grade copper-gold porphyry in the Philippines  World class deposit  Eight g diamond drill rigs g turning g underground g  Surface geotechnical drilling commenced  Geological modelling and estimation, and conceptual mining studies in progress 19

  20. Slide 20: Australasia Region - Far Southeast Project

    Australasia Region - Far Southeast Project NW Geological Setting and Proposed Drilling Window SE Prod: 1997 to present 18Mt @ 7.71g/t Au Enargite Prod: 1938 - 98 41Mt @ 3.3g/t Au 1,600m m 700 Drilling level FSE Au-Cu Porphyry 500m 100 m ? Proposed Drilling coverage from 700 level -200 m Aft Hedenqui

  21. Slide 21: Australasia Region - Far Southeast Project

    Australasia Region - Far Southeast Project Early indications support existence & extent of known core of mineralisation & further extensions outside this core  Proof of concept drilling complete – assays underway  17 drill holes for 23,678m N 250 m Mineralisation footprint Drilling complete Assays

  22. Slide 22: Australasia Region – Far Southeast Project

    Australasia Region – Far Southeast Project SW NE 250 m Extends existing known Mineralisation Mi li ti continuity ti it mineralisation 1,218 m at 0.6 g/t Au and 0.5% Cu e.g.: 450 m at 0.9 g/t Au and 0.8% Cu Gold eq equivalent i alent grade (g/t) 3.0 Assays pending Visual evidence of mineralisation 0.

  23. Slide 23: Australasia Region - Far Southeast Project

    Australasia Region - Far Southeast Project SW NE 250 m Confirming existing mineralisation 890 m at 1.0 g/t Au and 0.6% Cu Gold equivalent grade (g/t) 3.0 Confirming and extending known mineralisation 0.0 e.g.: 1,058 m at 0.7 g/t Au and 0.4% Cu Gold equivalent calculated using USD 1,000/oz Au and USD

  24. Slide 24: Far Southeast Project – Philippines

    Far Southeast Project – Philippines 2011 Proof of Concept Drill Results Cutoff From Intvl. Au Cu Au eq Cutoff From Intvl. Au Cu Au eq Hole ID Incl. (Au eq) (m) (m) (g/t) (%) (g/t) (Au eq) (m) (m) (g/t) (%) (g/t) FSU111001 0.5 360.0 968.8 0.29 0.43 1.10 1.5 455.0 80.0 0.37 0.79 1.84 FSU112007 0.5 307

  25. Slide 25: Investor Relations Contacts

    Investor Relations Contacts Zakira Amra Senior Vice President Investor Relations & Corporate Affairs ((office)) +27 11 562 9775 (mobile) +27 79 694 0267 zakira.amra@goldfields.co.za Willie Jacobsz Senior Vice President Head of Investor Relations (office) 508 839-1188 (mobile) 857 241-7127 willie.jac