Slide 1: Tillsonburg Station and Line Refurbishment
TILLSONBURG STATION AND LINE REFURBISHMENT
Slide 2: Overview
Overview Welcome to Hydro One’s online information presentation on upcoming work at our Tillsonburg Transformer Station. Through this narrated presentation, you will learn more about: • The proposed project; • What community members can expect during construction; • Replanting opportunities and; • P
Slide 3: The Project
The Project • In order to ensure the continued reliability of electricity supply to the area, Hydro One needs to replace critical equipment at Tillsonburg Transformer Station and along the transmission line that connects to Cranberry Junction. • The project is subject to the Class Environmental Asse
Slide 4: Project Maps
sLOWNIOF STILUSONBURG; Tillsonburg Area Refurbishment Project 195 KV Transmission Line |Existing Station Fence Line w= Proposed New Line Section [7] Proposed Expansion Area A Sructireto be Repiaces [ll Vegetation tobe Removed ‘A, Proposes New Structure GEE] Pocsbie Piantng Area A) © Potential New st
Slide 5: Project Maps
/ \ Township of _~ South-West Oxford y Town of a " % Tillsonburg re Municipality of Norwich
Slide 6: How the System Works
How the System Works. GENERATION AND HYDRO ONE OR LICENSED TRANSMITTER PRIVATE GENERATION COMPANIES [L.$—$ ig 9 FE add Generation Step-up Transformer Transmission Lines Transformer Distribution Station 115,000-500,000 volts (V) Station Station ¥ HYDRO ONE OR LOCAL DISTRIBUTION COMPANY TY « " Home W
Slide 7: Proposed Station Work
Proposed Station Work The project will include replacing critical equipment both inside and just outside the station perimeter. Inside the station: • The replacement and reconfiguring of end-of-life station equipment. Around the station/on the corridor: • The station footprint will need to be expand
Slide 8: Proposed Line Work
Proposed Line Work Along the transmission line between Tillsonburg TS and Cranberry Junction, work will include replacing and/or modifying select wood pole structures, conductor (wire) and insulators. 8
Slide 9: Vegetation Removal
Vegetation Removal iS ha: rik oe F . sLOWNIOF: TILESONBURG, & “7 , - Tillsonburg Area Refurbishment Project
Slide 10: What to Expect
What to Expect To facilitate the proposed construction, community members can expect: CONSTRUCTION • Increased noise, personnel, vehicles, and dust • A fenced material storage area would be installed on the corridor east of the station for the duration of construction • The station wall would be exp
Slide 11: Timeline
Timeline Activity (Anticipated) Timing Notice of Commencement of the February 2020 Class Environmental Assessment Project consultation and Ongoing environmental evaluation Online Community Engagement and July 2020 Collection of Feedback Notice of Completion of the Class Environmental Assessment –fil
Slide 12: Thank You for Joining Us Today!
THANK YOU FOR JOINING US TODAY! Your input is important to us. To provide comments or ask any questions, please fill out an online comment form, or contact the Community Relations team at 1.877.345.6799 or Community.Relations@HydroOne.com 12