Stellar Resources Limited · ASX:SRZ

Stellar Resources — Shareholder Meeting (November 2019)

19 slides from Stellar Resources's shareholder meeting presentation, Nov 26, 2019

  1. Slide 1: Annual General Meeting Presentation

    1 For personal use only ANNUAL GENERAL Presentation 26 November 2019 MEETING ASX: SRZ 2019 www.stellarresources.com.au

  2. Slide 2: Agenda

    2 ANNUAL GENERAL MEETING 2019 AGENDA For personal use only  B o a r d R e st r u c t u r i ng  A c h i e ve me n t s i n 2 0 1 9 - S t D i z i e r S c o p i ng S t u d y C o mp l e t e d ( J a n u a r y 2 0 1 9) - U p d a t e d H e e ms k i r k M i n e r a l R e s o u r c e E s t i ma t e ( M a y

  3. Slide 3: Board of Directors

    EXPERIENCED AND MULTI-DISCIPLINARY 3 WITH STRONG GLOBAL CONNECTIONS BOARD OF DIRECTORS For personal use only PHIL HARMAN, NON-EXECUTIVE CHAIRMAN GEOPHYSICIST Over 30 years experience in BHP Billiton minerals exploration THOMAS WHITING, NON-EXECUTIVE DIRECTOR Past and present Director of GEOPHYSICIST

  4. Slide 4: Enviable Project Location

    4 ENVIABLE PROJECT LOCATION WEST COAST TASMANIA – AUSTRALIA’S LARGEST AND MOST PRODUCTIVE For personal use only TIN FIELD  Stellar owned (100%) tin properties:  Heemskirk Project (Queen Hill, Severn, Montana and Oonah deposits)  Razorback and St Dizier Satellite deposits  Large Exploration Licen

  5. Slide 5: Best Portfolio of Tin Assets in Australia

    5 BEST PORTFOLIO OF TIN ASSETS IN AUSTRALIA For personal use only  Secure Tenure: ML’s over Heemskirk deposits and St Dizier  Large EL Package Providing Further Upside/ Flexibility

  6. Slide 6: St Dizier Scoping Study Completed - January '19

    6 ST DIZIER SCOPING STUDY COMPLETED - JANUARY ’19* For personal use only  409,179t @ 0.90% Sn In-pit diluted Indicated Mineral Resource  4.7:1 average strip ratio after application of 10% mining dilution and 95% mining recovery factors  A$3.3m mining capital costs for drainage diversion, pit deve

  7. Slide 7: Heemskirk Mineral Resource Update (May '19)

    7 HEEMSKIRK MINERAL RESOURCE UPDATE (MAY ‘19)* For personal use only Classification Deposit Tonnage Total Sn Contained Cassiterite Cu Pb Zn mt % Sn t % of total Sn % % % Indicated Upper Queen Hill 0.32 1.0 3,230 87 0.2 2.1 1.0 Lower Queen Hill 0.65 1.4 9,230 97 0.0 0.1 0.1 Severn 1.15 1.0 11,500 99

  8. Slide 8: Competitive Grade/Tonnage Position

    COMPETITIVE GRADE/TONNAGE POSITION 8 Bisie Alphamin Please refer to the following slide for project benchmarking For personal use only 5.1mt @ 4.5%Sn assumptions including; information sources, project stages & project resource categories 2µ

  9. Slide 9: Project Benchmarking Assumptions

    9 Project Benchmarking Assumptions For personal use only Project Company Country Project Total Total Total Measured Indicated Inferred Source / Company Annouoncemnt Date Stage Resource Resource Resource Resource Resource Resource Tonnes Grade Contained in Total in Total in Total (Mt) (%) Tin (kt) Bi

  10. Slide 10: Heemskirk Tin Scoping Study (October '19)

    10 HEEMSKIRK TIN SCOPING STUDY (October ‘19)* For personal use only  ~350,000tpa underground mine, processing plant, tailings storage and surface infrastructure  Mining of Queen Hill and then Severn (2 of the 4 Heemskirk deposits) for first 10 years  Open pit mining of St Dizier satellite deposit

  11. Slide 11: Attractive Scoping Study Economics

    11 ATTRACTIVE SCOPING STUDY ECONOMICS For personal use only Heemskirk Scoping Study Base Case - Key Outcomes  Low All-In Sustaining Cost of ~US$13,100/t Unit Total LOM of tin generating ~34% operating margin Ore Production (Mt) 3,695,386 Sn Grade (LOM Ave) (%) 0.94 based on US$20,000/t tin price as

  12. Slide 12: Heemskirk Could Become the Next Renison

    12 HEEMSKIRK COULD BECOME THE NEXT RENISON For personal use only  Renison, Australia’s oldest, largest & highest-grade tin mine is located 18km to the NE of Heemskirk  Heemskirk and Renison share the same ore genesis and geology  Heemskirk deposits drilled to a depth of 500m – all deposits open a

  13. Slide 13: Razorback Exploration Potential

    RAZORBACK EXPLORATION POTENTIAL 13  Open pit operated from 1975-1978 For personal use only producing 158 tonnes tin  57 historical holes drilled between 1958 and 1982  Encouraging results from 2018 trench and face samples  Exploration target of 180,000t to 220,000t @ 0.8% to 1.0% Sn *1 to a dept

  14. Slide 14: Montana Flats Exploration Upside

    14 MONTANA FLATS EXPLORATION UPSIDE For personal use only  EL13/2018 adds 3 km of strike length along the northwest trending, tin-mineralising Oonah and Montana Faults  All tin deposits and major silver mines lie along or between the Oonah and Montana Faults  Silver miners of the 1900s largely ig

  15. Slide 15: 2020/21 Work Plan and Budget

    15 2020/21 WORK PLAN AND BUDGET FOCUS ON HEEMSKIRK PFS For personal use only  Drilling - ~17 holes (6,800m) to increase Queen Hill and Severn Indicated Resource to ~3.3Mt and to support a Probable Reserve)  Metallurgical testwork to focus on improving Pre Feasibility Study (18 months) (A$) Queen H

  16. Slide 16: Tin Price Expected to Recover in 2020

    16 TIN PRICE EXPECTED TO RECOVER IN 2020 For personal use only  “Shanghai Metals Markets (SMM) expect tin prices to rebound above US$20,000/t by the end of 2019 as tight ore availability and maintenance-caused production cuts at China’s largest tin producer, Yunnan Tin, will lead to a sharp supply

  17. Slide 17: The Investment Proposition

    17 THE INVESTMENT PROPOSITION For personal use only Investment in the best tin project in Australia – highest grade undeveloped tin project in Australia and second highest globally Low cost investment – market capitalization significantly undervalues Stellar’s tin assets Heemskirk Scoping Study comp

  18. Slide 18: Disclaimer

    18 DISCLAIMER For personal use only FORWARD LOOKING STATEMENTS This presentation may include forward-looking statements. Forward-looking statements include, but are not limited to statements concerning Stellar Resources Limited’s planned activities and other statements that are not historical facts.

  19. Slide 19: Stellar Resources Limited contact details

    19 For personal use only STELLAR Level 17, 530 Collins Street Melbourne VIC 3000 RESOURCES Phone +61 3 9692 7222 Fax +61 3 9077 9233 LIMITED www.stellarresources.com.au

Stellar Resources — Shareholder Meeting (November 2019) on 6ix