  1. Slide 1: La Productora - The Producer

    For personal use only La Productora- The Producer PRODUCTORA COPPER PROJECT CHILE Diggers & Dealers Kalgoorlie , August 2012

  2. Slide 2: Disclaimer

    Disclaimer For personal use only This presentation is provided on the basis that neither the Company nor its representatives make any warranty (express or implied) as to the accuracy, reliability, relevance or completeness of the material contained in the Presentation and nothing contained in the Pr

  3. Slide 3: Rapid Rise of Productora

    Rapid Rise of Productora  One of Chile’s fastest emerging major new coastal range copper projects For personal use only  Large drilling program underway to triple Productora size of resource base to 300Mt Santiago  Development studies well advanced for a 10Mtpa, 20 year mine life open pit project

  4. Slide 4: Company Overview

    Company Overview Capital Structure For personal use only 199.5 Million shares 40.6 Million unlisted 20c options (exp Nov 2013) 12.4 Million new unlisted 75c options (exp Jan 2013) Cash at Hand AU$ 17 million (30th June 2012) Top 5 Shareholders 20.1% Kalgoorlie Auto Services 13.4% Taurus Funds Manage

  5. Slide 5: Consolidation of Productora Complete

    Consolidation of Productora Complete Productora Landholding Showing Location of Uranio 1/70 Lease For personal use only Project Consolidation Complete 100% Large central pit development purchase option now available option 100% HCH  Four years and nine deals to consolidate the Productora project Ur

  6. Slide 6: Central Area Resource - 15% of deposit footprint

    Central Area Resource - 15% of deposit footprint Classification Reporting Grade Contained Metal For personal use only Cut Off Tonnage Copper Gold Molybdenum Copper Eq* Copper Gold Molybdenum Copper Eq* Cu % (Mt) % (g/t) (g/t) % (Tonnes) (Oz) (Tonnes) (Tonnes) Indicated 0.3 31,1 0.6 0.1 159 0.8 184,6

  7. Slide 7: Resource Growth Drilling Focus

    Resource Growth Drilling Focus Productora Deposit Footprint Phase 2 Drill Coverage Results 280 - 320Mt Pending For personal use only Magnetic Response & Drill Intercepts  H2 2013 Target Mineralisation Significant Drill Results 63m/0.4% CuEq* Complete GMC/Teck drill intercept 29m/0.6% CuEq*& HCH dri

  8. Slide 8: Central Area Diamond Drilling

    Central Area Diamond Drilling  In-fill drilling to up-grade inferred category of resource well advanced For personal use only  New diamond core, larger sample size - better grade estimation South Uranio 1/70 lease Productora Central Area Resource Surface Oxide North 56m/0.9% CuEq* Uranio 1/70 600m

  9. Slide 9: Project Development Lay-out

    Project Development Lay-out For personal use only Productora Copper Project Preliminary Project Development Layout North Pit North Waste Dump 3  Two main pits- Central Waste Central Pit - 4km length Dump 2 North Pit - 2km length  Preliminary pit optimsations Uranio 1 to 70 Lease to average 270m de

  10. Slide 10: Development Studies Proving Robust

    Development Studies Proving Robust For personal use only  Metallurgy - High copper recoveries of 93.5 – 96% at coarse grind size,+27% commercial concentrate grade  Environmental - Baseline studies well advanced, on-track to submit EIA by early 2013  Engineering - Capital and operating cost estima

  11. Slide 11: Hot Chili and CMP Co-operate on Infrastructure

    Hot Chili and CMP Co-operate on Infrastructure  Letter of Intent signed with Chilean iron ore major CMP in July 2012 to negotiate joint infrastructure For personal use only  Port, rail, easement corridor, maritime/surface rights  Ideal location - 800m elevation, 15km south of township of Vallenar

  12. Slide 12: Infrastructure Design

    Infrastructure Design  Minimal infrastructure - Sulphide mill, water pipeline (2 pumps), CMP Los Losas port option For personal use only  Successful infrastructure deal - shorter time to production with lower start-up capital cost Mill Design Water Pipeline, Extraction & Pump Design Las Losas Port

  13. Slide 13: Hot Chili and CMP to Study and Negotiate Iron Option

    Hot Chili and CMP to Study and Negotiate Iron Option For personal use only  2nd Letter of Intent signed with Chilean iron ore major CMP in July 2012  Study and negotiate details of iron production option for Productora  3 magnetite zones identified - 13.5km length Parallel Western Zone Zone HCH &

  14. Slide 14: Productora Growth and Development Milestones

    Productora Growth and Development Milestones Major forward milestones Complete project consolidation – last critical lease in centre of project secure July 2012 For personal use only 1. 2. Infrastructure Access – LOI’s signed for joint infrastructure and potential iron July 2012 production negotiati

  15. Slide 15: Building a Long Term Copper Producer

    Building a Long Term Copper Producer For personal use only  Two new projects announced in July 2012 within trucking distance, north and south of Productora  Building a production hub at Productora towards a future annual copper production target of 150kt within the next 5 years  Emerging Large sc

  16. Slide 16: Hot Chili Brand

    Hot Chili Brand For personal use only People - Talented Australian and Chilean management Early mover, Recognize opportunity and execute Local Partnerships - Chilean majors- CMP and CODELCO Deal Capability - Doing what no-one thought possible Drill Rigs - Australian rigs and drillers - faster and mo

  17. Slide 17: Qualifying Statements

    Qualifying Statements Target Mineralisation References to exploration target size and target mineralisation in this presentation are conceptual in nature and should not be construed as For personal use only indicating the existence of a JORC Code compliant mineral resource. Target mineralisation is

  18. Slide 18: Productora vs Peer Projects

    Productora vs Peer Projects Copper Equivalent Resources – Grade vs Tonnes vs Metal (bubble size) For personal use only 6.0 DeGrussa Chile- Emerging Producer (SFR) ASX- Producer ASX- Emerging Producer 5.0 Copper Eq grade % 4.0 Kinsevere (AVL) 3.0 2.0 Boseto (DML) Prominen Hillside t Hill (RXM) (OZL)

  19. Slide 19: For personal use only

    For personal use only 19