Slide 1: AGM Corporate Presentation November 2021
AGMCorporate Presentation November 2021 Exhibit 99.2
Slide 2: Forward Looking Statement
FORWARD LOOKING STATEMENT This presentation contains forward-looking statements regarding CORE that are intended to be covered by the safe harbor "forward-looking statements" provided by the Private Securities Litigation Reform Act of 1995, based on CORE’s current expectations and includes statement
Slide 3: Non-GAAP Measures and Cautionary Note on Resources
NON-GAAP MEASURES The Preliminary Economic Assessment (“PEA”) referenced herein was prepared in accordance with Canadian National Instrument 43-101 (NI 43-101). CORE is not subject to regulation by Canadian regulatory authorities and no Canadian regulatory authority has reviewed the PEA or passed up
Slide 4: Developing Alaska's Next Gold Mine(s)
Developing Alaska’s Next Gold Mine(s) Manh Choh – in partnership with Kinross and the Alaska Native Tetlin TribeRecent Acquisition of Lucky Shot MineThree Early-Stage Exploration Projects:ShamrockEagle-HonaTriple Z 4
Slide 5: Corporate Overview
CORPORATE OVERVIEW Traded on OTCQB – Pending listing on the NYSE American: CTGO6.67 Million Shares Outstanding6.77 Million Shares Fully Diluted100,000 Options; No Warrants and No Long Term Debt~ $US25 Million Cash Contango 30% owner of Peak JV; Kinross Owns 70% and is Operator100% owner of the Lucky
Slide 6: Manh Choh Gold Deposit
Manh Choh Gold Deposit1.3 Moz Gold – Measured plus Indicated Resources1Average grade = 4g/t Gold1Located in Alaska on the Alaska HwyOn Private Land Owned by the Tetlin Alaska Native TribeBusiness Partnership with Kinross - Using the Fort Knox Milling Facilities Lower capital costs, Smaller Environ
Slide 7: Near-Term Production Potential & Excellent Exploration Upside
NEAR-TERM PRODUCTION POTENTIAL & EXCELLENT EXPLORATION UPSIDE 7 MANH CHOH GOLD PROJECT OTCQB:CTGO In September 2020 entered into 70/30 JV agreement with Kinross (Operator) to form new Peak Gold LLC, with Royal Gold and Tetlin Tribe retaining royalty interests;Plan is to mine Manh Choh Gold Ore, then
Slide 8: Manh Choh Gold Project: Anticipated Economics
MANH CHOH GOLD PROJECT: Anticipated Economics Using existing infrastructure at Fort Knox, the Peak Gold LLC is planning on a 2024 start dateKinross estimates 1 million oz gold equivalent production over a 5-year period equating to roughly 220,000 oz GEO per annum (30% to Contango Ore = 66,000 GEO/Yr
Slide 9: Manh Choh Gold Project 2021 Budget
9 MANH CHOH GOLD PROJECT 2021 Budget: $19 Million In-fill drilling to upgrade Resources from Indicated to Measured and Inferred to Indicated Categories – Reserves with FSCondemnation drill – Placement of FacilitiesMetallurgy – Completed, Testing UnderwayHydrology – Water Management PlanIn-pit Geotec
Slide 10: Manh Choh Gold Project and Surrounding Targets
10 MANH CHOH GOLD PROJECT AND SURROUNDING TARGETS Main MC North MC
Slide 11: Lower Risk & Reduced Timeline to Production Decision
11 LOWER RISK & REDUCED TIMELINE TO PRODUCTION DECISION DRILLING SCOPING STUDY PERMITTING & FEASIBILITY PRODUCTION DETAILED DESIGN PROCURMENTCONSTRUCTION $19 million Program in 2021: Resource In-fill, Hydrology, Geotechnical, Metallurgical Engineering; Environment and Community OutreachWith ~$2 mill
Slide 12: 100% Owned Lucky Shot Gold Deposit
100% OwnedLucky Shot Gold Deposit 1 Based on SK1300 Report filed April 8, 2021 Corporate press release 12
Slide 13: Lucky Shot Property Historic Resources
Lucky Shot Property Historic Resources1,2 M&I: 206k Tonnes @ 18.3 g/t Gold for 121,500 Ounces of Contained Gold 1 The historical production information presented is based upon reports file by the prior owners and operators of the mines. The Company has not undertaken any independent work to verify o
Slide 14: Contango Exploration Plan for Lucky Shot Project
Contango Exploration Plan for Lucky Shot Project Rehab and extend existing Enserch tunnel in 2021-2022 to explore the Lucky Shot vein down-dip from historically produced 250,000 ounces at 40g/t average grade 1 - prep for exploration drilling in three stages:Stage 1a Rehabilitate and extend Enserch t
Slide 15: Contango ORE - Key Takeaways
15 CONTANGO ORE - Key Takeaways Image used with permission from Kinross Advancing flagship Manh Choh project in partnership with Tetlin Alaska Native Tribe and Kinross as OperatorKinross paid $93 Million for their 70% interest in Peak Gold JV$19 million 2021 program – prepare Permitting in Q4 2021 a
Slide 16: Thank You
16 THANK YOU
Slide 17: Corporate Inquiries
Corporate Inquires:info@contangoore.com+1-778-386-6227www.contangoore.com OTCQB:CTGO Twitter: @orecontangoLinkedIn: Contango OREInstagram: ContangoOREFacebook: Contango ORE
Slide 18: Forward-looking AISC, resources and EBITDA non-GAAP note
This presentation contains forward looking estimates of all-in sustaining cost (“AISC”), resources and EBITDA, which are a financial measure not determined in accordance with United States generally accepted accounting principles (“GAAP”). We cannot provide a reconciliation of estimated AISC, resour