  1. Slide 1: Investor and Analyst Site Visit

    Investor and Analyst Site Visit Premier pure-play copper producer in Europe 28-29 April 2022

  2. Slide 2: Disclaimer

    Disclaimer The information contained in this document (“Presentation”) has been prepared by Atalaya Mining Plc (the “Company”). While the information contained herein has been prepared in good faith, neither the Company nor any of its shareholders, directors, officers, agents, employees or advisers

  3. Slide 3: Riotinto District Vision

    Riotinto District Vision

  4. Slide 4: Riotinto District Assets

    Riotinto District Assets Atalaya’s 15 Mtpa mill could become a future processing hub – similar to MATSA model Key Operations in the Iberian Pyrite Belt Aguas Teñidas Magdalena Cerro Colorado MATSA San Dionisio San Antonio (Sandfire) Riotinto East Sotiel Riotinto Masa Valverde / Majadales District 4

  5. Slide 5: Riotinto District Mineralised Material

    Riotinto District Mineralised Material Excludes Touro and POM Resource Tonnage (Mt) Illustrative Implied Mine Life at 15 Mtpa (Years) Producing Growth Pipeline Producing Growth Pipeline Note: Figures are illustrative and subject to further evaluation and studies 5

  6. Slide 6: Riotinto District Mineralised Material

    Riotinto District Mineralised Material Excludes Touro and POM CuEq Resources (Mt)(1)(2) Riotinto District Deposit Grades(1)(2) Producing Growth Pipeline Producing Growth Pipeline 1. For all assets except Proyecto Masa Valverde, CuEq calculations based on $3.50/lb Cu, $1.15/lb 2. Proyecto Masa Valver

  7. Slide 7: Illustrative Production Potential

    Illustrative Production Potential Modest increase in blended head grade has potential to materially increase production Copper Production (kt) Sensitivity to Head Grade(1)(2) Illustrative target 0.42% Copper Head Grade 1. Figures are illustrative and subject to further evaluation and studies 2. Assu

  8. Slide 8: San Dionisio and San Antonio

    @ Atataya San Dionisio and San Antonio

  9. Slide 9: San Dionisio and San Antonio Deposits

    San Dionisio and San Antonio Deposits Significant potential from unmined orebodies located adjacent to current open pit San Antonio Eastern extension of the historical Planes deposit San Dionisio West extension of Cerro Colorado pit 9

  10. Slide 10: San Dionisio and San Antonio Deposits

    San Dionisio and San Antonio Deposits Resource estimate grades are significantly higher than existing Cerro Colorado reserves Independent Mineral Resource Estimates(1)(2) ▪ New independent Mineral Tonnage Cu Grade Zn Pb Resource Estimates were Mt announced for the San Open Pit: Measured & Indicated

  11. Slide 11: San Dionisio Conceptual Pit

    San Dionisio Conceptual Pit West extension of Cerro Colorado pit Aerial Plan View of Pit Rim Vertical Section of Economic Shell 11

  12. Slide 12: San Antonio Location

    San Antonio Location 12

  13. Slide 13: San Antonio Deposit

    San Antonio Deposit 3D View of San Antonio Domains Historic Underground Development 13

  14. Slide 14: Conceptual Development Plans

    Conceptual Development Plans San Dionisio San Antonio Open Pit Open Pit Underground Underground Copper Resource Polymetallic Resource Tonnage 29.0 Mt (M&I) 27.0 Mt (M&I) 12.4 Mt (Inf) 11.8 Mt (Inf) 0.78% Cu 1.06% Cu 1.01% Cu 1.32% Cu Grade 0.27% Zn 2.07% Zn 2.54% Zn 1.79% Zn 0.06% Pb 0.41% Pb 0.62%

  15. Slide 15: Illustrative Impact

    Illustrative Impact Conceptual Throughput (Mtpa) Illustrative Copper Production (kt) Illustrative Copper Head Grade Illustrative Mine Life (Years) Note: Figures are illustrative and subject to further evaluation and studies 15

  16. Slide 16: Proyecto Masa Valverde

    Proyecto Masa Valverde

  17. Slide 17: Proyecto Masa Valverde Location

    Proyecto Masa Valverde Location Sotiel mine (MATSA) ~5km Campanario Trend Masa Valverde Majadales 17

  18. Slide 18: PMV – New Mineral Resource Estimate

    PMV – New Mineral Resource Estimate Significant increase in tonnage and contained copper, silver and gold vs. prior estimate 2022 Mineral Resource Estimate(1)(2) ▪ Announced a new Mineral Grade Resource Estimate for Proyecto Tonnage CuEq Cu Zn Pb Ag Au Mt g/t g/t Masa Valverde in April 2022 Masa Val

  19. Slide 19: Footprint of Sotiel Mine (MATSA)

    Footprint of Sotiel Mine (MATSA) Sotiel Mine Surface Infrastructure Sotiel Coronada Less than 300m 19

  20. Slide 20: Footprint of Magdalena Mine (MATSA)

    Footprint of Magdalena Mine (MATSA) Magdalena Mine Surface Infrastructure Aguas Teñidas ~500m 20

  21. Slide 21: Masa Valverde and Majadales Deposits

    Masa Valverde and Majadales Deposits Wireframes of Mineral Resource Estimate Planned Ramp Access Masa Valverde Ramp Majadales Majadales Masa Valverde 21

  22. Slide 22: Masa Valverde – Cu / Zn Zones

    Masa Valverde – Cu / Zn Zones 22

  23. Slide 23: Masa Valverde – Grade Distribution

    Masa Valverde – Grade Distribution 23

  24. Slide 24: PMV – Conceptual Development Plan

    PMV – Conceptual Development Plan Stockwork Polymetallic Copper Zone Copper-Zinc-Lead Zone Tonnage 18.1 Mt (Ind & Inf) 72.3 Mt (Ind & Inf) 0.87% Cu 0.56% Cu 0.56% Zn 1.48% Zn Grade 0.15% Pb 0.73% Pb 9 g/t Ag 35 g/t Ag 0.18 g/t Au 0.72 g/t Au Mining Method TBD (PEA to evaluate selective and bulk mini

  25. Slide 25: Long Term Power Strategy

    Long Term Power Strategy

  26. Slide 26: Electricity Procurement Strategy

    Electricity Procurement Strategy Reducing energy costs and exposure to spot market, while lowering carbon footprint Location of 50MW Solar Plant ▪ 50MW solar plant Tailings Storage Facility (TSF) ‒ Construction under way 50MW of combined capacity ‒ 100% for self consumption, representing ~22% of 15

  27. Slide 27: Wind Turbines – Under Evaluation

    Wind Turbines – Under Evaluation Potential Location Illustration 27

  28. Slide 28: Proyecto Masa Valverde – Exploration Programme Overview

    Proyecto Masa Valverde Exploration Programme Overview

  29. Slide 29: Proyecto Masa Valverde (“PMV”)

    Proyecto Masa Valverde (“PMV”) …much more than the Masa Valverde deposit… 29

  30. Slide 30: PMV – Main Attributes

    PMV – Main Attributes ▪ Overview ‒ 100% owned by Atalaya Mining ‒ Along the prolific southern domain of the world-class Iberian Pyrite Belt ‒ Large, NI 43-101 compliant mineral resource based on two nearby VMS deposits: Masa Valverde and Majadales ‒ Resource growth potential ‒ Enormous exploration u

  31. Slide 31: PMV – Overview

    PMV – Overview ▪ Two main deposits: Masa Valverde (“MV”) and Majadales (“MJ”), both located along the same stratigraphic and structural setting ▪ MV is one of the largest, single, undeveloped VMS systems in the world ‒ It remains open to the west ‒ MJ is smaller but shallower and higher grade ▪ Very

  32. Slide 32: Mineral Rights Situation

    Mineral Rights Situation ▪ Three investigation permits totalling approximately 45km2 ‒ Valverde ‒ Beas ‒ Mojarra ▪ MV and MJ deposits are included in the Valverde investigation permit ▪ A 14km2 exploitation concession was applied for in August 2021 derived from the Valverde investigation permit ▪ Be

  33. Slide 33: Mineral Resource Estimate

    Mineral Resource Estimate 2022 Mineral Resource Estimate by CSA Global 2022 Cut-off Tonnage (Mt) EqCu (%) Cu (%) Pb (%) Zn (%) Ag (ppm) Au (ppm) Masa Valverde Massive Sulphide Indicated EqCu 12.8 1.61 0.61 0.78 1.79 33 0.66 Inferred 0.78% 56.1 1.43 0.56 0.73 1.38 36 0.75 Masa Valverde Stockwork Indi

  34. Slide 34: Wireframes of Mineral Resource Est.

    Wireframes of Mineral Resource Est. 34

  35. Slide 35: MV-MJ Longitudinal Section

    MV-MJ Longitudinal Section With main mineralisation types 35

  36. Slide 36: MV – Drilling Sections

    MV — Drilling Sections Atalaya -200 | Legend MV_Litho Qj aim [By Fetsic Rocks | Purple slates and jaspers [J] Stockwork {_] Tuffites and slates Hi Massive Shulphides om 300m i 118m (521-539) 0.45% cu 0.01% zn 0.51pm Au 16.18ppm Ag -400 125m (529-654): 1.16% Cu 0.32% zn 0.86ppm Au '86,71ppm Ag -600 x

  37. Slide 37: MJ – Drilling Sections

    MJ – Drilling Sections Majadales 37

  38. Slide 38: MV – Mineral Resource Estimate

    MV – Mineral Resource Estimate ▪ Resource block model based on 3 geological zones: upper and lower massive sulphides and a stockwork in between ▪ Blocks were regrouped in two extra subzones: a Zn- rich sub-zone (Zn > Cu*2.80) and Cu-rich sub-zone (Zn <Cu*2.80). Cu-rich sub-zones account for most of

  39. Slide 39: MJ – Mineral Resource Estimate

    MJ – Mineral Resource Estimate ▪ Resource block model based on three major styles of mineralisation, each with geological and statistical differences ‒ Massive sulphide ‒ Semi-massive sulphide ‒ Stockwork ▪ Polymetallic massive sulphides are predominant ▪ Smaller but shallower and higher grade than

  40. Slide 40: MV – Resource Upgrade (1/2)

    MV – Resource Upgrade (1/2) ▪ Additional infill drilling around the higher grade zones A could improve both quality (to indicated) and average grade of the resource ▪ Infill drilling will support future economic studies 40

  41. Slide 41: MV – Resource Upgrade (2/2)

    MV – Resource Upgrade (2/2) B C 41

  42. Slide 42: MV – Resource Growth Potential

    MV – Resource Growth Potential ▪ MV resource remains completely open to the NW ‒ Two rigs are currently devoted to testing this area ▪ One rig is drilling the second hole at the Loop 9 anomaly, located approximately 300m W of MV ▪ The second rig has started the first hole at the larger and higher co

  43. Slide 43: Campanario Trend

    Campanario Trend ▪ Clear potential to quickly define a shallow resource close to MV-MJ ▪ Last drilling round in 1995 by state owned company Adaro ▪ Mineralization (gossans and fresh sulphides) traced along 5km ▪ Associated VTEM and FLEM anomalies. A significant FLEM anomaly (Loop 14) located at the

  44. Slide 44: Geological Model

    Geological Model In-house geological model with Leapfrog software 44

  45. Slide 45: Property Scale Exploration Potential (1/2)

    Property Scale Exploration Potential (1/2) 45

  46. Slide 46: Property Scale Exploration Potential (2/2)

    Property Scale Exploration Potential (2/2) ▪ The ground FLEM-Squid survey has delineated a number of high priority anomalies which will be systematically drill tested 46

  47. Slide 47: Contacts

    Contacts Atalaya Mining plc Investor Relations Alberto Lavandeira, CEO Carina Corbett, 4C Communications Ltd +34 959 59 28 50 +44 20 3170 7973 info@atalayamining.com corbett@4ccommunications.com Restricted & confidential