Contango Silver & Gold Inc. · AMEX:CTGO

Contango Silver & Gold — Contango ORE — Corporate Update (September 2022)

39 slides from Contango Silver & Gold's corporate update, Sep 15, 2022

  1. Slide 1: September 2022 Corporate Update and Plans for 2022

    September 2022 Corporate Update and Plans for 2022 Exhibit 99.1

  2. Slide 2: Forward Looking Statement

    FORWARD LOOKING STATEMENT The Feasibility Study (“FS”) referenced herein that relates to Peak Gold, LLC (“Peak Gold”), was prepared by Kinross Gold Corporation (“Kinross”), which controls the Manager of Peak Gold and holds 70% of its outstanding membership interests, in accordance with Canadian Nati

  3. Slide 3: Cautionary Note Regarding Estimates of Measured, Indicated and Inferred Resources

    The Preliminary Economic Assessment (“PEA”) referenced herein was prepared in accordance with Canadian National Instrument 43-101 (NI 43-101). CORE is not subject to regulation by Canadian regulatory authorities and no Canadian regulatory authority has reviewed the PEA or passed upon its accuracy or

  4. Slide 4: Developing Alaska's Next Gold Mines

    Developing Alaska’s Next Gold Mines Manh Choh – Development Stage Project under construction in partnership with Kinross (70%) and the Alaska Native Tetlin Tribe (Royalty) 100% Owned Lucky Shot Mine – Exploring historic high-grade gold mine Three Early-Stage Exploration Projects: Shamrock Eagle-Hona

  5. Slide 5: Manh Choh Gold Deposit

    Manh Choh Gold Deposit 1.3 Million ounce gold Measured plus Indicated Resources1 Average grade = 4g/t Gold1 Located in Alaska on the Alaska Hwy On Private Land Owned by the Tetlin Alaska Native Tribe Business Partnership with Kinross – Paid $93 Million for 70% interest Using the Fort Knox Milling Fa

  6. Slide 6: Near-Term Production Potential & Exploration Upside

    NEAR-TERM PRODUCTION POTENTIAL & EXPLORATION UPSIDE 6 MANH CHOH GOLD PROJECT NYSE-A:CTGO September 2020 entered into JV agreement between Contango (30%) and Kinross (70% and Operator) to form new Peak Gold LLC, with Royal Gold and Tetlin Tribe retaining royalty interests; Plan is to mine Manh Choh G

  7. Slide 7: Manh Choh Gold Project: Anticipated Economics

    MANH CHOH GOLD PROJECT: Anticipated Economics Using existing infrastructure at Fort Knox, Peak Gold LLC is planning on a 2024 start date Kinross estimates 914,000 GEO production over a 4.5-years equating to roughly 225,000 GEO per annum (30% to Contango Ore = 67,500 GEO/Yr)1 Using elevated cut-off g

  8. Slide 8: Manh Choh Gold Project Location

    The project is located 29 km (18 mi) from the Alaska Hwy and 400 km (240 mi) to the Fort Knox Milling Complex 8 MANH CHOH GOLD PROJECT LOCATION MANH CHOH DEPOSIT Image used with permission from Kinross Manh Choh

  9. Slide 9: Peak Gold JV Project Highlights

    PEAK GOLD JV 9 Processing ore from the Peak Gold Project at Fort Knox avoids mill construction and is expected to decrease execution risk, lower capital expenditures, drive attractive returns, and reduce the project’s environmental footprint and permitting requirements. Leverages Fort Knox’s success

  10. Slide 10: Manh Choh Update: Construction Underway

    10 Manh Choh Update Construction underway

  11. Slide 11: Benefits to Alaska Residents and Businesses with Smaller Environmental Footprint

    11 MANH CHOH GOLD PROJECT Benefits to Alaska Residents and Businesses with smaller Environmental Footprint McKinley Research confirms jobs, economic boost to Tok, road and infrastructure enhancements, and taxes: • 250 to 300 new Construction jobs • 400 to 600 direct Mine and Trucking jobs plus indir

  12. Slide 12: Lower Risk & Reduced Timeline to Production Decision

    12 LOWER RISK & REDUCED TIMELINE TO PRODUCTION DECISION DRILLING SCOPING STUDY PERMITTING & FEASIBILITY PRODUCTION DETAILED DESIGN PROCURMENT CONSTRUCTION $19 million Program in 2021: Resource In-fill, Hydrology, Geotechnical, Metallurgical Engineering; Environment and Community Outreach With ~$2 mi

  13. Slide 13: Peak Gold LLC Exploration Highlights

    PEAK GOLD LLC 13 Exploration Highlights Completed ~$3.0 million exploration program Q4 2020 primarily directed at metallurgical and geotechnical drilling, and on-going environmental studies to advance feasibility and permitting Completed ~$3 million in 2021 exploration program and conducted resource

  14. Slide 14: Manh Choh Gold Project and Surrounding Targets

    14 MANH CHOH GOLD PROJECT AND SURROUNDING TARGETS Main MC North MC $3 Million Exploration Program Planned for 2022 Exploration for New Resources in Chief Danny Area – 4000 meters (13,000 ft) in 15 to 20 holes Further evaluation of 685,000 acre Manh Choh property Additional regional stream sediment s

  15. Slide 15: Asset Summary

    ASSET SUMMARY 15 Peak Gold Project ~(675,000 Acres) State Claims (~160,000 Acres) The Manh Choh project consists of a ~685,000 acres land package including ~13,423 acres of State Mining Claims  Roughly the size of Rhode Island Contango is also the 100% owner of the Alaska state claims exploration l

  16. Slide 16: Reference

    16 1 Hart, C.J.R., 2005. Mid-Cretaceous Magmatic Evolution and Intrusion-related Metallogeny of the Tintina Gold Province, Yukon and Alaska. Unpublished PhD thesis, University of Western Australia, 198 p. 1

  17. Slide 17: Lucky Shot Portal Circa 1930

    Lucky Shot Portal Circa 1930 17

  18. Slide 18: Lucky Shot Portal Circa 1930

    Lucky Shot Portal Circa 1930 18

  19. Slide 19: Lucky Shot Property Historic Resources

    Lucky Shot Property Historic Resources1 Historic M&I Reserve on Adjacent Coleman Segment of LS Vein: 206k Tonnes @ 18.3 g/t Gold for 121,500 Ounces of Contained Gold2 1 The historical production information presented is based upon reports file by the US Geological Survey from information provided by

  20. Slide 20: Lucky Shot Vein

    Lucky Shot Vein: +1 mile (1.6 km) strike length and open along strike and down dip 20 Coleman Adit Lucky Shot “500” Adit War Baby Adit Looking NNE

  21. Slide 21: he of

    he of ‘ PD Coleman block Meu Lucky Shot block War Baby block Cu

  22. Slide 22: CONTANGO OR=

    CONTANGO OR= LO SILVER PER

  23. Slide 23: CONTANGO O8=

    [os CONTANGO O8=

  24. Slide 24: Lucky Shot Update - Safety First Approach

    Lucky Shot Update - Safety First Approach 24

  25. Slide 25: Safety Reporting for Contango

    Safety Reporting for Contango Safety – Keeping Us Healthy & Safe by getting to the root of the problem 25 Safety Satistics Reporting 2022 May Employees Contractors Site LTI 0 0 0 First Aid 0 0 0 Restricted Work 0 0 0 Near Miss 0 0 0 Equipment Damage 0 0 0 NOTES: Safety Satistics Reporting 2022 April

  26. Slide 26: Contango Exploration Plan for Lucky Shot Project

    Contango Exploration Plan for Lucky Shot Project Rehab and extend existing Enserch tunnel to explore the Lucky Shot vein down-dip - prep for exploration drilling in three stages: Stage 1a Drift 500 meters along footwall and parallel to vein for detailed in-fill drilling; Stage 1b Continue Enserch tu

  27. Slide 27: Lucky Shot – Enserch Tunnel Location of Pilot Holes

    27 Lucky Shot – Enserch Tunnel Location of Pilot Holes Exploration drill located here Started exploration/pilot hole Plan is to drill ten (10) holes in a fan pattern Holes are 600 to 1100 feet in length Extend tunnel to intersect the vein and bulk sample Tunnel is currently at ~2405ft Western Crossc

  28. Slide 28: Lucky Shot – Pilot Hole Drill Holes

    28 Lucky Shot – Pilot Hole Drill Holes Plan is to drill ten (10) holes in a fan pattern 6 holes completed to date from Western and Eastern Ballrooms All 6 holes intersecting the Lucky Shot Vein 3 contained Visible Gold (VG) ASSAYS PENDING! Complete 5 holes from Eastern Ballroom Extend tunnel to inte

  29. Slide 29: Lucky Shot Vein

    Lucky Shot vein Sue 150200 |Btev (2)

  30. Slide 30: Developing Alaska's Next Gold Mines in Partnership with Kinross

    30 Partnered with Proven Operator Plan to truck ore to Fort Knox mill simplifies permitting and execution Kinross has proven operating experience in Alaska further reducing risk The plan lowers the required capital and shortens timelines to production by leveraging existing infrastructure High grade

  31. Slide 31: Thank You

    = CONTANGO 022 THANKYOU

  32. Slide 32: Slide 32

  33. Slide 33: Lucky Shot – Underground Development to Support 2022 Exploration Program

    Lucky Shot – Underground Development to support 2022 Exploration Program and Year-Round Operations 33

  34. Slide 34: Lucky Shot – Enserch Tunnel Refurbishment & Extension Plan

    Lucky Shot – Enserch Tunnel Refurbishment & Extension Plan with New Mining Equipment 34

  35. Slide 35: Lucky Shot – Currently Advancing Towards Drift in Footwall

    35 Lucky Shot – Currently Advancing Towards Drift Parallel and in Footwall to Lucky Shot Vein – Exploration Drilling to Start in June

  36. Slide 36: Lucky Shot – Underground Exploration Drill Rig

    36 Lucky Shot – Underground Exploration Drill Rig

  37. Slide 37: Lucky Shot – Underground Exploration Drill Rig

    Lucky Shot – Underground Exploration Drill Rig 37

  38. Slide 38: Corporate Inquiries

    Corporate Inquires:info@contangoore.com+1-778-386-6227www.contangoore.com NYSE American: CTGO Twitter: @orecontangoLinkedIn: Contango OREInstagram: ContangoOREFacebook: Contango ORE

  39. Slide 39: Non-GAAP Forward Looking Estimates Notice

    This presentation contains forward looking estimates of all-in sustaining cost (“AISC”), resources and EBITDA, which are a financial measure not determined in accordance with United States generally accepted accounting principles (“GAAP”). We cannot provide a reconciliation of estimated AISC, resour

Contango ORE — Corporate Update (September 2022) on 6ix