Jameson Resources Limited · ASX:JAL

Jameson Resources — Mines & Money Conference Hong Kong 2013

17 slides from Jameson Resources's conference presentation, March 2013

  1. Slide 1: Investor Presentation - Mines & Money Conference Hong Kong 2013

    INVESTOR PRESENTATION MINES & MONEY CONFERENCE HONG KONG 2013

  2. Slide 2: Disclaimer

    Disclaimer This document has been prepared as a summary only, and does not contain all information about the Jameson Resources Limited’s (the “Company”) assets and liabilities, financial position and performance, profits and losses, prospects and the rights and liabilities attaching to the Company’s

  3. Slide 3: Investment Highlights

    Investment Highlights  POSITIONED IN WORLD CLASS METALLURGICAL COAL FIELDS Jameson is a pure play coking coal Company and owns coal projects within Canada’s prolific Elk Valley and Peace River metallurgical coal fields  SIGNIFICANT DEVELOPMENT EXPERTISE ON BOARD Two highly credentialed coal mining

  4. Slide 4: Financial Snapshot

    Financial Snapshot Capital Structure Price Volume Chart Share Capital Volume Close 0.45 2,000 Share Price (15 March 2013) A$0.34 0.40 Volume (Thousands) 0.35 1,500 Share Price (A$) Shares Outstanding 157m 0.30 Market Capitalisation A$53m 0.25 1,000 Trading Range (6 month) A$0.21 to A$0.36 0.20 0.15

  5. Slide 5: Highly Experienced Management Team

    Highly Experienced Management Team OPERATIONS David Fawcett ‐ Chairman • Mining engineer with over 35 years coal experience in western Canada CANADA • Proven track record for initiating and advancing new coal mine development • Awarded the 2012 AMEBC Coal Award for Excellence in Mine Development in

  6. Slide 6: Canada - World Class Infrastructure

    Canada ‐ World Class Infrastructure No capacity constraints on rail networks and ports currently undergoing expansion RAIL • Canadian Pacific • Common user railway. • Customers include Teck Resources • Links southeast BC to deep water ports in Vancouver • Canadian National • Common user railway. • C

  7. Slide 7: Overview of Projects

    Overview of Projects All projects close to infrastructure in coking coal fields responsible for Canada’s metallurgical coal exports CROWN MOUNTAIN PROJECT • 90% interest in Project • Located in the Elk Valley coal field and close to some of Canada’s major operating HCC mines PEACE RIVER PROJECTS • 1

  8. Slide 8: Crown Mountain Project – Strategic Location

    Crown Mountain Project – Strategic Location • 90% ownership with option to acquire remaining 10% for C$2m • Five coal licenses granted covering an area of 2,588 hectares • Located in the Elk Valley, British Columbia’s most prolific coking coal field • Teck is currently producing 24Mtpa in this regio

  9. Slide 9: Crown Mountain Project – Exploration Status

    Crown Mountain Project – Exploration Status • Jameson’s 2012 exploration program included 40 reverse circulation holes for 5,707m & trenching • Significant coal intersections from 7 major seams with combined average thickness up to 35 metres • Project rapidly advancing following delineation of initi

  10. Slide 10: Crown Mountain Project – 90Mt Resource

    Crown Mountain Project – 90Mt Resource DOMAIN Measured Indicated Meas/Ind Inferred (Mt) (Mt) (Mt) (Mt) North Block 7.9 7.1 15.0 0.0 South Block 51.3 0.0 51.3 0.0 Southern Extension 0.0 0.0 0.0 23.7 TOTAL 59.2Mt 7.1Mt 66.3Mt 23.7Mt 10

  11. Slide 11: Peace River Projects – Strategic Location

    Peace River Projects – Strategic Location • 100% ownership of Dunlevy, Carbon East, Peace Reach and Graham River projects within the Peace River coal field • Coal license applications cover large area of prospective ground • Projects along strike from four operating coal mines and a number of resour

  12. Slide 12: Dunlevy – Exploration Status

    Dunlevy – Exploration Status • Exploration to date has included field reconnaissance and trenching in 2009, and geological mapping in 2011 and 2012 • Initial priority exploration target of at least 100 to 150 million tonnes of potential metallurgical coal has been identified within the Dunlevy proje

  13. Slide 13: M&A Activity in Peace River Coal Field

    M&A Activity in Peace River Coal Field 13

  14. Slide 14: Project Milestones – 2013

    Project Milestones – 2013 Crown Mountain Project  Resource Estimate Q1‐13 Preliminary Economic Assessment Q2‐13 Coal Quality and Drilling Program Q3‐13 Pre‐Feasibility Study Commences Q4‐13 Dunlevy Project Regulatory Approvals Q2‐13 Drilling Program Commences Q2‐13 Coal Quality Testwork Q3‐13 Resou

  15. Slide 15: Summary

    Summary POSITIONED IN WORLD CLASS Jameson is a pure coking coal Company and owns coal projects within Canada’s prolific METALLURGICAL FIELDS Elk Valley and Peace River coking coal fields Quality projects located proximal to quality road network and an extensive rail system PROXIMAL TO INFRASTUCTURE

  16. Slide 16: www.jamesonresources.com.au

    www.jamesonresources.com.au AUSTRALIAN OFFICE (Corporate) CANADIAN OFFICE Level 2, 79 Hay Street Suite 800, 1199 West Hastings Street Subiaco, WA 6008 Vancouver, BC V6E 3 T5 T: +61 (8) 9200 4473 T: +1 (604) 629‐8605 E: admin@jamesonresources.com.au

  17. Slide 17: Competent Persons Statements

    Competent Persons Statements The information in this presentation that relates to an Exploration Target (as defined under Section 18 of the JORC code), Exploration Results, Mineral Resources or Ore Reserves on the Dunlevy Project is based on information compiled by Mr. Ken MacDonald P.Geo., who is a

Jameson Resources — Mines & Money Conference Hong Kong 2013 on 6ix