Aurora Oil & Gas CORP

Aurora Oil & Gas — First Albany Capital Emerging Resource Plays Conference 2006

29 slides from Aurora Oil & Gas's conference presentation, Jul 19, 2006

  1. Slide 1: Michigan Antrim Shale and New Albany Shale of Indiana and Western Kentucky

    Slide 1: Michigan Antrim Shale and New Albany Shale of Indiana and Western Kentucky

    Michigan Antrim Shale and New Albany Shale of Indiana and Western Kentucky First Albany Capital EMERGING RESOURCE PLAYS CONFERENCE July 19, 2006 Total Quality Management in Exploration and Production Methods

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    Disclaimer In this slide presentation, statements regarding our goals and objectives, our expected methods of operation and development strategies, our expected and potential production volumes, the volume of potential reserves, potential drilling locations, the timing of drilling activities, when w

  3. Slide 3: Executive Summary

    Slide 3: Executive Summary

    Executive Summary Low-risk, long-term production of unconventional gas reservoirs in Antrim and New Albany Shales 88 BCF in proven reserves (1/31/06) 7,250 mcfe/day in production (mid-June) Over 460,000 net acres (3/31/06) with over 3,000 potential drilling locations and over 2 TCF in potential rese

  4. Slide 4: The Company

    Slide 4: The Company

    The Company Active in Antrim and New Albany Shales since 1997 Reverse merger with Cadence Resources, 10/31/05 AMEX listing, 5/24/06; Russell Indexes, 6/30/06 Management team has 18-24 years experience Engineering/Geology team has 24-32 years experience Foster an environment that appreciates creative

  5. Slide 5: Antrim and New Albany Shale Plays

    Slide 5: Antrim and New Albany Shale Plays

    Antrim and New Albany Shale Plays Relatively shallow blanket shale formations High-upside, lower-risk development potential

  6. Slide 6: Technologies to Cope with Reservoir Risk

    Slide 6: Technologies to Cope with Reservoir Risk

    Technologies to Cope with Reservoir Risk The Antrim Shale and New Albany Shale are “blanket” formations covering significant areas of the Michigan and Illinois Basins. Dry holes are rare. Nevertheless, there are inherent reservoir risks. What tools are being used to detect risky drilling areas?

  7. Slide 7: Identification of Antrim Shale Scours

    Slide 7: Identification of Antrim Shale Scours

    Identification of Antrim Shale Scours The Antrim Shale is partially or totally absent in localized areas where ancient rivers and glaciers have carved through the bedrock This results in the drilling of dry holes unless the scours can be identified in advance

  8. Slide 8: Illustration of Antrim Shale Scours

    Slide 8: Illustration of Antrim Shale Scours

    Illustration of Antrim Shale Scours

  9. Slide 9: Gravity Survey

    Slide 9: Gravity Survey

    Gravity Survey Seismic can be used to identify scours, but gravity surveys provide an inexpensive alternative Identification of Antrim Shale Scours Gravimeter

  10. Slide 10: Antrim Shale Fracture Stimulations

    Slide 10: Antrim Shale Fracture Stimulations

    Antrim Shale Fracture Stimulations How has Aurora optimized stimulations of vertical Antrim Shale wells? Primary Objectives: Contact all potential pay Reduce gel loadings to maximize fracture conductivity

  11. Slide 11: Antrim Shale Fracture Stimulations

    Slide 11: Antrim Shale Fracture Stimulations

    Antrim Shale Fracture Stimulations Antrim Shale Well Log Intervals of natural fracturing: focus of completion intervals Bedding planes: containment for fracture stimulations Black images indicate fracturing in the wellbore

  12. Slide 12: Antrim Shale Fracture Stimulations

    Slide 12: Antrim Shale Fracture Stimulations

    Antrim Shale Fracture Stimulations Aurora Procedure 300+ Perforations Acid Wash Foot-By-Foot 4-stage Frac Low Gel Guar-Borate System Photos and illustrations courtesy of BJ Services Company, U.S.A.

  13. Slide 13: Operational Efficiencies

    Slide 13: Operational Efficiencies

    Operational Efficiencies How has Aurora optimized the production infrastructure for Antrim Shale wells? Primary Objectives: Minimize back pressure to maximize gas desorption Minimize environmental exposure

  14. Slide 14: Operational Efficiencies

    Slide 14: Operational Efficiencies

    Operational Efficiencies Low Pressure Gathering Systems 10" Poly Pipe used as flow lines for gas and water Use of Large Diameter Poly Pipe

  15. Slide 15: Operational Efficiencies

    Slide 15: Operational Efficiencies

    Operational Efficiencies Low Pressure Gathering Systems Separate systems for gas and water Gas and water lines prior to burial

  16. Slide 16: Operational Efficiencies

    Slide 16: Operational Efficiencies

    Operational Efficiencies Low Pressure Gathering Systems Flowline Sumps Some water is entrained in gas flowing from wells to facilities In areas of extreme elevation changes, water tends to collect in low spots Electric water sumps are installed to transfer water from gas flowlines to water flowlines

  17. Slide 17: Traditional Reciprocating Compressor Unit vs Aurora's Skid-Mounted Compressor and Separator

    Slide 17: Traditional Reciprocating Compressor Unit vs Aurora's Skid-Mounted Compressor and Separator

    Traditional Reciprocating Compressor Unit Aurora’s Skid-Mounted Compressor and Separator Operational Efficiencies Low Pressure Production Facilities Modular Screw Compressors Flexibility in placement Parallel or series Single or 2-stage compression Electric Lower capital cost Lower maintenance Envir

  18. Slide 18: Operational Efficiencies

    Slide 18: Operational Efficiencies

    Operational Efficiencies Low Pressure Production Facilities Traditional Gas Processing Facility Aurora’s Low Pressure Gas Processing Facility BIG small

  19. Slide 19: Operational Efficiencies

    Slide 19: Operational Efficiencies

    Operational Efficiencies Low Pressure CO2 Processing Low Pressure Carbon Dioxide Extraction CO2 extracted at 100 psi Less horsepower and fuel required Prototype installed in 2003 High Pressure Carbon Dioxide Extraction Raw methane - CO2 mix compressed as necessary to enter sales line (typically 1200

  20. Slide 20: Operational Efficiencies

    Slide 20: Operational Efficiencies

    Operational Efficiencies Water Disposal Tank-less Water Disposal Lower capital cost Low profile automated water handling system has environmental advantages Would you want these eyesores in your back yard?

  21. Slide 21: Operational Efficiencies

    Slide 21: Operational Efficiencies

    Operational Efficiencies Advantages of Aurora’s Low Pressure System Significant reduction in capital expenditures Increased production rates due to reduced back pressure on wells Commercial life of wells extended due to reduced costs Facility capacities can be optimized over life of wells

  22. Slide 22: Moving Forward

    Slide 22: Moving Forward

    Moving Forward What innovations are currently being implemented by Aurora? Electric Submersible Pumps (ESP’s) installed on Composite Coiled Tubing Horizontal Drilling Designed to Minimize Back Pressure

  23. Slide 23: ESP Installations On Composite Coiled Tubing

    Slide 23: ESP Installations On Composite Coiled Tubing

    ESP Installations On Composite Coiled Tubing Developed by collaboration of Aurora with two vendors Patent pending on ESP/composite tubing connection Composite coiled tubing unit owned by Aurora No rig required - significant cost savings 6 units currently installed Longest installation to date is 3 m

  24. Slide 24: Horizontal Drilling Premise

    Slide 24: Horizontal Drilling Premise

    Horizontal Drilling Premise New Albany Shale Large vertical fractures Predominant fracture orientation is E-W Occurrence of N-S fracturing is limited Horizontal drilling is the only effective means to connect fracture planes

  25. Slide 25: Orthogonal Vertical Fractures

    Slide 25: Orthogonal Vertical Fractures

    Orthogonal Vertical Fractures Non-uniform Spacing Characteristics of Natural Fractures New Albany Shale Vertical Well with Fracture Stimulation Horizontal Well

  26. Slide 26: Drilling & Completion Objectives

    Slide 26: Drilling & Completion Objectives

    Drilling & Completion Objectives New Albany Shale Avoid plugging of natural fractures while drilling Complete laterals open hole with no stimulation Recover gas reserves from all organic members Optimize drilling geometry and pump selection/placement for water removal and reduction of back pressure

  27. Slide 27: Horizontal Well – Typical Geometry

    Slide 27: Horizontal Well – Typical Geometry

    Horizontal Well – Typical Geometry New Albany Shale Window Milled in Casing at KOP (Spill Point) Cased Sump for Pump Open Hole Lateral Clegg Creek Camp Run / Morgan Trail Selmier Blocher Vertical Pilot Hole / Medium Radius / Open Hole Lateral - Gravity drainage to heel of lateral - Fluid must overco

  28. Slide 28: Horizontal Well – Preferred Geometry

    Slide 28: Horizontal Well – Preferred Geometry

    Horizontal Well – Preferred Geometry New Albany Shale 7” or 5-1/2” Casing Set at KOP in Borden Shale Open Hole Lateral Underreamed Sump for Pump Vertical Producer (Water Production) Pilot Hole for Laterals (Gas Production) Clegg Creek Camp Run / Morgan Trail Selmier Blocher Vertical Producer at Toe

  29. Slide 29: Questions?

    Slide 29: Questions?

    Questions? Contact: Jeffrey W. Deneau - Investor Relations Aurora Oil & Gas Corp. 4110 Copper Ridge Drive, Suite 100 Traverse City, MI 49684 www.auroraogc.com T: 231-941-0073 E: jdeneau@auroraogc.com Share Price: $3.60 Shares Outstanding: 81.69M Market Cap: $294M *Price-related figures based on clos

Source: SEC EDGAR · 8-K filed Jul 19, 2006

More decks from Aurora Oil & Gas CORP