  1. Slide 1: Exploiting Unconventional Gas Reservoirs in the Antrim and New Albany Shales

    Exploiting Unconventional Gas Reservoirs in the Antrim and New Albany Shales 2006 Southwestern Showcase Dallas, Texas November 15, 2006

  2. Slide 2: Disclaimer

    Disclaimer In this slide presentation, statements regarding our goals and objectives, our expected methods of operation and development strategies, our expected and potential production volumes, the amount of potential reserves and drilling locations, the timing of drilling activities, when wells wi

  3. Slide 3: Key Investment Highlights

    Key Investment Highlights Focused on two unconventional “Resource Plays” Extensive multi-year development drilling inventory in two project areas – Antrim and New Albany Shale plays Low-risk, repeatable drilling opportunities with large amounts of resources in place Over 621,000 net acres assembled,

  4. Slide 4: Aurora Overview

    Aurora Overview Portfolio Highlights Net Acreage by Area As of 6/30/06. Other Total Proved Reserves (6/30/06): 105 Bcfe 8% Antrim Shale 20% % Proved Developed: 69% Est. Net Average Daily Prod. (9/06): 8,074 mcfe/d Net Shale Acreage (6/30/06): 575,453 % Undeveloped: ~93% Budgeted Net Wells: Second ha

  5. Slide 5: Map of Operations

    Map of Operations The Antrim Shale is an established play that provides significant upside to Aurora’s reserve base Similar characteristics to other shale plays Extensively drilled (over 8,000 wells) with a historical success rate of over 95% Shallow blanket shale formation Characterized by low deve

  6. Slide 6: Resource Potential

    Resource Potential Over 2.3 Tcfe of reserve potential based on conservative spacing and per well reserve estimates Provides over 10 years of drilling inventory at current drilling pace

  7. Slide 7: Aurora's 18-Month Drilling Plan

    Aurora’s 18-Month Drilling Plan 18-month drilling plan includes over 301 net identified drilling locations Estimated reserve potential of over 181 Bcfe on planned drilling capital of over $136 million Excludes potential PUD locations that can be booked with success Future activity will come with inc

  8. Slide 8: Experienced Leadership

    Experienced Leadership William Deneau C.E.O. & President 22 Years John Miller Thomas Tucker Ronald Huff V.P. Science and V.P. Operations C.F.O. Strategic Planning 25 Years 27 Years 18 Years Operational Team 2 senior geologists, 1 staff geologist, 1 senior petroleum engineer, 1 drilling superintenden

  9. Slide 9: Antrim Shale Project – Development Stage

    Antrim Shale Project – Development Stage Portfolio Highlights Antrim Shale Unconventional Shale Play Net Acreage: 125,993 Net Undeveloped Acreage 90,483 As of 6/30/06: Total Reserves 101 Bcfe Estimated Sept. 2006 Production 7,438 Mcfe/d Net Budgeted Drilling Locations: Second half of 2006E 60 2007E

  10. Slide 10: Antrim Shale Project Economics

    Antrim Shale Project Economics Established, low-risk “Resource Play” Over 8,000 wells drilled to date in the play w/ ~95% historical drilling success rate Focus of 2005 / 2006 / 2007 drilling program to provide low-risk source of reserve, production and cash flow growth At $6.00 gas we generate an I

  11. Slide 11: Antrim Shale Type Curve

    &. Antrim Shale Type Curve 5 Antrim Shale Type Curve 500 MMCF EUR Years =| Gas Rate, mscf/day [| water Rate, bbls/day SS eee |_| --- -Curulative Gas, mecf [eT \ > 77 -Curulative Water, bbls at an ae SY Sie etisalat aree as See a peer \ a ee i } ri o 4 6 8 0 12 14 16 18 D 22 24 26 B 30 32 344 36 38 1

  12. Slide 12: Unique Low Pressure Production Technology

    Unique Low Pressure Production Technology Traditional Large Central Compressor Unit High production costs Lower production rates Shortens commercial life of the well Less efficient use of facility capacity Gas fired Aurora’s Skid-mounted compressor and water separator Reduces development costs Incre

  13. Slide 13: Patent Pending Electric Submersible Pumps (ESP's) / Tubing Connection

    Patent Pending Electric Submersible Pumps (ESP’s) / Tubing Connection Patent pending on ESP/composite tubing connection Allows for “rig-less” installation and maintenance of ESP’s using coiled tubing spread Leads to significant cost savings and operational advantages especially for ongoing maintenan

  14. Slide 14: New Albany Shale Project: Early Stage Development

    New Albany Shale Project: Early Stage Development Portfolio Highlights New Albany Shale Unconventional Shale Play Net Acreage: 449,460 Net Undeveloped Acreage: 444,494 As of 6/30/06: Total Reserves: 2 Bcfe Estimated Sept. 2006 Production: 123 Mcfe / day Net Budgeted Drilling Locations: Second Half o

  15. Slide 15: New Albany Shale Project Economics

    New Albany Shale Project Economics AOG has participated in the drilling of 123 vertical and 28 horizontal wells since 1995 Provided data -- defining extent and location of shale Horizontal drilling - key to unlocking potential of New Albany Shale 14 horizontal wells currently producing and validatin

  16. Slide 16: New Albany Shale Type Curve

    &. New Albany Shale Type Curve 1000 100 Gas Rate & Water Rate a o New Albany Shale Example (Horizontal) 2,500" laterals -- 320 acre spacing 19009000 q Gas Rate, mscffday a Water Rate, bbls/day [| -- --Gumulative Gas, mscf -- -- Cumulative Water, bbls ca Se ee eh, 000,000 — —— = = — - 100,000 aa ” 19

  17. Slide 17: The "Fractured Fairway" of the NAS

    The “Fractured Fairway” of the NAS Fractured Fairway 1) El Paso NAS Pilot (14 wells) Indiana 2) Horizontal Test (3.5 bcfg-single well) 3) 1950’s Loogootee Field (3 verticals @750 mcfg/d) 4) Baker Well Blowout (3,000 mcfg/d) 5) Horizontal (3 big gas shows) 6) Horizontal Well (strong gas flow) 7) Dive

  18. Slide 18: Early Stage Development Project Reserve Add Potential

    Early Stage Development Project Reserve Add Potential Early stage development projects benefit from PUD offset booking potential Leads to rapid reserve growth 13 wells have added 25 PUD locations at PDP Location 6/30/2006 18-month drilling budget in New Albany shale 52 net wells with 57.2 Bcfe of ne

  19. Slide 19: Historical Operating Results

    Historical Operating Results

  20. Slide 20: EBITDA and LOE

    &M. EBITDA and LOE EBITDA $5,000 vy $4,000 g SM h $3,000 Z $2,000 + ba eT en" $ 2005 4H 2006 = EBITDA ——EBITDA Margin LOE $iMcfe Rca N 8 $3.00 $2.50 $1.00 $41.00 $0.00 $ 2004 2005 4H:2006

  21. Slide 21: Aurora Summary

    Aurora Summary Two compelling shale plays at different stages of development: (1) Antrim: Development Stage Project 18-month Plan - Reserve Impact 1,260 locations with 630 Bcfe of net potential 228 net wells to be drilled over 18-months ~$74.2 million in drilling capital expenditures 114 Bcfe of net

  22. Slide 22: Questions?

    Questions? Contact: Jeffrey W. Deneau - Investor Relations Aurora Oil & Gas Corp. 4110 Copper Ridge Drive, Suite 100 Traverse City, MI 49684 www.auroraogc.com T: 231-941-0073 E: jdeneau@auroraogc.com Share Price: $3.38 Shares Outstanding: 82.025M Market Cap: $277M *Figures based on close 11/03/06