Li-ft Power Ltd. · TSXV:LIFT
Li-ft Power — Investor Presentation (July 2025)
25 slides from Li-ft Power's investor presentation, July 2025
Slide 1: Hard Rock Lithium Exploration in Canada
HARD ROCK LITHIUM EXPLORATION IN CANADA POWER TSXV: LIFT | OTCQX: LIFFF | FRA: WS0 www.li-ft.com July 2025
Slide 2: Forward Looking Statements
Forward Looking Statements POWER Statements contained in this presentation that are not current or historical factual statements This presentation is being provided for information purposes only and does not constitute or may constitute “forward-looking information” within the meaning of applicable
Slide 3: Lithium Market
Lithium Market POWER 10-year price performance Annual, Base Case: US$/t, Real 2024 Lithium Carbonate Lithium Hydroxide Spodumene 6% 80,000 We are here 60,000 40,000 20,000 0 2015 2020 2025 2030 TSXV: LIFT | OTCQX: LIFFF | FRA: WS0 3
Slide 4: Supply-Demand Forecasts
Supply-Demand Forecasts POWER Lithium demand continues to grow strongly but prices will remain under pressure in the short term due to oversupply • In the short term, lithium prices are expected to remain under A marginal surplus and built-up An additional 1.3 Mt will need to be pressure due to over
Slide 5: CATL IPO Prospectus - Projections on Growing Demand
CATL IPO Prospectus - Projections on Growing Demand POWER 3 Key Takeaways: • Massive energy storage expansion: Driven by Front of the Meter – Grid-scale electrification trends, grid stability needs, and Back of the Meter – Consumer/home-scale sustainability goals. Data center energy storage • Divers
Slide 6: Li-FT Power: Our Projects
Li-FT Power: Our Projects POWER YELLOWKNIFE PROJECT QUEBEC GREENFIELDS Northwest Territories, Canada Québec, Canada • Inferred MRE: 50.4Mt at 1.00% Li2O • Largest land position in the James Bay region of Quebec (2,300 km2 ) • Excellent transport infrastructure – proximity to road and rail • 25 km lo
Slide 7: Li-FT People: Management
Li-FT People: Management POWER Francis MacDonald Andrew Marshall April Hayward David Smithson President, CEO & Director Chief Financial Officer Chief Sustainability Officer Senior Vice President, Geology • Co-founded Kenorland • Chartered Accountant & • 25 years of experience in environment • Held t
Slide 8: Li-FT People: Board
Li-FT People: Board POWER Anthony Tse Paul Gruner Alex Langer Andree St-Germain Eva Bellissimo Executive Chairman Director Director Director Director • Close to 30 years of private and • Former CEO for Det’on Cho • Worked with Canaccord Genuity • Former Investment Banker for • Co-leads the Global Me
Slide 9: Yellowknife - Infrastructure in an Established District
Yellowknife - Infrastructure in an Established District POWER • The Yellowknife Lithium Project is accessible by road from the city of Yellowknife • Spodumene concentrate can be shipped to rail at Hay River by road or by barge in summer Ingraham Trail Barge between Hay River and Yellowknife A C CN R
Slide 10: Canadian Railway Infrastructure - Ports easily accessible
Canadian Railway Infrastructure - Ports easily accessible POWER TSXV: LIFT | OTCQX: LIFFF | FRA: WS0 10
Slide 11: Yellowknife Lithium Project – Visible from Space
Yellowknife Lithium Project – Visible from Space POWER Abundant outcrop with almost complete exposure sets the Yellowknife Project apart Size potential and lithium grades are readily apparent based on outcrop exposure 11
Slide 12: Yellowknife Lithium Project: Mineral Resource Estimate
Yellowknife Lithium Project: Mineral Resource Estimate POWER • Estimate includes 286 drill holes or 50,000 m of drilling Includes 8 of the 13 pegmatites across Li-FT’s land package, east of Yellowknife • 50.4 Mt at 1.0% Li2O of inferred resource category • Six of the eight dykes remain open in spodu
Slide 13: Yellowknife Metallurgy
Yellowknife Metallurgy POWER 79% recoveries producing high-quality spodumene concentrate grading 5.83% Li2O Summary of Results Wt. Grade (%) Recovery (%) • Global average recovery across all deposits on a DMS Sample Flowsheet (%) Li Li2O Fe2O3 Li Fe2O3 + flotation circuit is 79.1% BigE 21.1 2.7 5.79
Slide 14: Peer Benchmarking – Initial Resource Estimates
Peer Benchmarking – Initial Resource Estimates POWER Resource Grade Project Location Operator Strategic Investor Maiden Current Current • 3rd largest initial resource for all spodumene projects in (Mt Li2O) (Mt Li2O) (% Li2O) SKWN Quebec Patriot 1.55 1.97 1.38% 1 1.55 1.97 Canada Adina Quebec Winsom
Slide 15: Quebec Greenfields
Quebec Greenfields POWER Greenfields Exploration targeting Li pegmatites under cover in a prospective district • Li-FT has 3 projects in James Bay, Quebec; total area of 2,282 km2 • RUPERT • PONTAX • MOYENNE • The Rupert Project surrounds the Whabouchi Li deposit and covers ~1,000 km2 of similar geo
Slide 16: Spodumene grain counts in till
Spodumene grain counts in till POWER • 620 bulk till samples were collected and processed for spodumene grain counts in areas that had anomalism in Galaxy – Rio Tinto Whabouchi – Rio Tinto the till geochemistry survey 110 Mt at 1.30% Li2O 55 Mt at 1.45% Li2O • Samples were collected down-ice of Whab
Slide 17: Pontax – 25 km long spodumene anomaly (in till)
Pontax – 25 km long spodumene anomaly (in till) POWER Pontax Whabouchi (Rio Tinto) • 25 km long spodumene-in-till 55 Mt at 1.45% Li2O anomaly located within the Whabouchi Pontax Project Ice Flow • The number of spodumene Direction grains in till at Pontax is Pontax Spodumene Anomaly “Background” sim
Slide 18: Cali Lithium Project - Location
Cali Lithium Project - Location POWER Field work in 2023 preparing for initial 2024 drill program • The Cali Lithium Project is located on the border of the Northwest Territories and Yukon Territory Cali • 50 km to the north of the past- Lithium producing Cantung mine Project Cali Lithium Project •
Slide 19: Cali – The heart of a spodumene pegmatite district
Cali – The heart of a spodumene pegmatite district POWER FieldGeochemistry Rock work in 2023 preparing for initial 2024 drill program & Mapping • Prospecting and mapping in summer of 2023 defined a number of spodumene pegmatite corridors/dyke swarms • 1.5 km by 1 km area contains many individual dyk
Slide 20: Cali vs. Colina (Latin Resources)
Cali vs. Colina (Latin Resources) POWER Field work in 2023 preparing for initial 2024 drill program • Cali has a similar footprint to Latin A Resources’ Colina lithium deposit in Brazil A’ 1.5 km 200 m • Similar geological setting – 1 km A’ pegmatite dyke swarms with many narrow dykes • Potential fo
Slide 21: ESG Highlights
ESG Highlights POWER Executive Oversight (Chief Sustainability Officer) Yellowknife Lithium Project Employment (% Person Hours) Strong, collaborative relationships with local Procurement FY2024 YLP Indigenous communities. Indigenous (40.4%) $11.5M • Established, effective engagement process. Local (
Slide 22: Timeline & Catalysts
Timeline & Catalysts POWER H2 2025 YLP Preliminary Economic Assessment March – April 2025 Pontax drill program June – August 2025 Environmental Baseline Studies July – Sept 2025 Cali Field program *contingent on market conditions 2025 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2026 22
Slide 23: Share Structure
Share Structure POWER Capital Structure Top Institutional Holders Analyst Coverage As Of July 30th, 2025 Top Institutional Holders Style Issued and Outstanding 47,335,337 1. Commodity Capital AG Growth Katie Lachapelle, CPA Options 1,999,500 2. Extract Capital Growth DSUs 45,926 3. Tribeca Investmen
Slide 24: 4 points to wrap up the presentation
4 points to wrap up the presentation POWER 1 Top tier hardrock 2 Well-funded to lithium deposit in progress projects at North America bottom of the market 3 Excellent and 4 Massive upside with supportive exploration/discovery shareholder base drilling at Pontax Head Office Francis MacDonald Follow u
Slide 25: Appendix A - Footnotes for Peer Benchmarking Table
Appendix A - Footnotes for Peer Benchmarking Table POWER Patriot Battery Metals Inc. Snow Lake Resources Ltd. “NI 43-101 Technical Report – Mineral Resource Estimate for the CV5 Pegmatite, Corvette Property” effective June 25, 2023; Todd “Nova Minerals - Quarterly Activities Report – 30 June 2021” e