New Era Energy & Digital, Inc. · NASDAQ:NUAI

New Era Energy & Digital — FY2025 Earnings Presentation

29 slides from New Era Energy & Digital's earnings presentation, Mar 17, 2026

  1. Slide 1: Investor Presentation: Fourth Quarter FY2025 Business Update

    March 17, 2026 Investor Presentation Fourth Quarter FY2025 Business Update

  2. Slide 2: Disclaimer and Forward-Looking Statements

    Disclaimer and Forward-Looking Statements No Offer or Solicitation This presentation (this “Presentation”) has been prepared to assist interested parties in making their own evaluation of New Era Energy & Digital, Inc., a Nevada corporation (“New Era” or the “Company”), its projects and prospects. T

  3. Slide 3: Today’s Presenters

    Today’s Presenters Charlie Nelson President & Chief Operating Officer ● Infrastructure developer with experience building and scaling large energy and industrial platforms ● Background across pipelines, gas processing, power, terminals, fuels and chemicals ● Led development and commercialization of

  4. Slide 4: Industry Landscape and Growth Drivers

    Context Industry Hyperscaler Demand Rapidly Outgrowing Power Supply New Era’s Unique Position in the Market Landscape and ● Rapid growth in AI and high-performance compute ● Flagship asset: Texas Critical Data Center (“TCDC”), Growth Drivers driving unprecedented demand Permian Basin (1+ GW campus,

  5. Slide 5: Designed for Accelerated Execution

    Company Playbook Designed for Accelerated Execution Differentiated Site Sourcing Capital-efficient GP/LP Structure Multi-channel origination via BTM expertise, energy partnerships, Lower balance sheet requirements vs. traditional development; GP and curated developer network; access to sites unavail

  6. Slide 6: Solving the Core Constraints of Hyperscale AI Deployment

    Solving the Core Constraints of Hyper- BTM + Grid Only Grid Model scale AI Deployment Behind-the-meter powered - Direct interconnection offers Fully integrated power and infrastructure shell model aims to ensure long-term capacity but requires Grid power certainty and delivery longer lead-times appr

  7. Slide 7: NUAI-Led Campus Development

    DEVELOPMENT TIMELINE NUAI-Led Campus Development Land Site & Control Identify and entitle sites with access to power, water, and fiber in desirable compute corridors. Supported by platform-level delivery partnerships Power Procurement Control of power availability and economics expected through BTM

  8. Slide 8: Our Multi-Campus & GW Platform

    Our Multi-Campus & GW Platform Under Development In Planning Location Location Estimated Total Texas Critical Outside City of Odessa, TX New Mexico Southeast New Mexico Capacity Ector County (492 acres) Lea County (3,500 acres) Data Centers Campus Partners Partners Campus (TCDC) Ramboll, RK, et al.

  9. Slide 9: TCDC: Our Flagship Campus

    Calpine, Quail Run TCDC Additional 54 acres TCDC: Our Vistra Energy Flagship Campus • First major deployment of the NUAI TCDC 438 acres development platform • 438 acres owned + 54 acre corridor pending (Ector County, Texas) • Permian Basin energy corridor • Adjacent to generation assets operated by

  10. Slide 10: Data Center Campus in the Permian Basin

    Deep Dive Data Center Campus in the Permian Basin TCDC Power Development Pathway Initial Development (200 MW): Phase 1 powered- shell deployment plans to leverage existing POI (point of interconnection) Integrated Power Development (+450 MW): Power with physically diverse gas supply from three pipel

  11. Slide 11: A Next-Generation Modular Data Center Platform

    Key Features Introducing: ATOM The future of A Next-Generation Modular Data AI infrastructure Center Platform 25 MW Base Deployment Unit ∞ Scalability 80% Modular Construction 2026 Manufacturing Planned to Begin Expect engineering finalization Precision-engineered for Modular units stack side by Fac

  12. Slide 12: Delivery Ecosystem

    Design & Engineering Manufacturing Delivery Designed in collaboration with EYP & Ramboll Strategic partnership with RK Mission Critical Ecosystem Engineering Precision Dedicated Fabrication Capacity World-class strategic The combination of EYP/ Ramboll's Our partnership with RK Mission Critical allo

  13. Slide 13: Building the Midstream Infrastructure of the AI Economy

    Capital Structure Building the Midstream Infrastructure of the AI Economy SPV 1: TCDC SPV 2: New Mexico ... SPV N Proven infrastructure development SIMPLE, REPEATABLE, SCALABLE STRUCTURE framework widely adopted across All projects would be capitalized and managed individually, energy, real estate,

  14. Slide 14: Project Financing

    Project Financing NUAI ● Large-scale AI infrastructure projects require institutional capital General Partner (GP) · Sponsor & Developer partnerships ● Projects would be financed primarily at the asset (project) level NUAI would receive dev. & mgmt. fees ● NUAI would act as sponsor and developer (Ge

  15. Slide 15: Key Milestones Achieved in 2026

    Key Milestones Achieved in 2026 Closed acquisition of remaining 50% of TCDC from Sharon AI JAN Announced appointment of Charlie Nelson as President and COO Announced strategic 54-acre corridor LOI adjacent to TCDC Announced 450MW behind-the-meter generation plan FEB Commercial arrangement with Thund

  16. Slide 16: Near-Term Operational Priorities

    Near-Term Operational Priorities Developer Owner Manager Advancing site control and Engineering and execution partner Project-level financing partnerships development readiness engagement Continued expansion of the Progressing power development Commercial discussions with development team and interc

  17. Slide 17: Appendix

    Appendix For more information www.newerainfra.ai Investor relations www.newerainfra.ai Lincoln Tan nuai@orangegroupadvisors.com nuai@orangegroupadvisors.com

  18. Slide 18: The Case for Standardization

    The Case for Standardization Industry Pain Point Client Consensus Our Proposed Solution Fully Diluted Shares Outstanding ● Skilled construction labor ● Universal requirement for higher ● Single standardized platform—one shortages and extended power density to support next- proven design, engineered

  19. Slide 19: ATOM by the Numbers

    ATOM by the Numbers Engineered to optimize the balance between performance, efficiency, and economics Data Hall Footprint Server Capacity Target Efficiency 200,000 sq ft 2,500 racks 1.2-1.5 PUE 60-80% 45-135 98.5% Liquid Cooling kW/rack Target Efficiency Percentage of heat load removed via Maximum r

  20. Slide 20: A Flexible and Efficient Solution

    Growth Engine A Flexible and Efficient Solution Optional generators can be removed when used in conjunction with microgrids for higher density campus Designed for upgradability and flexibility Partnering with established modular manufacturers like RK Mission Critical to access dedicated, high-volume

  21. Slide 21: Hybrid Liquid Cooling

    Breakthrough Technology Hybrid Liquid Cooling Direct-to-chip cold plates capturing heat at the source Hybrid liquid-air approach — best of 70-80% 20-30% 90%+ both technologies 0.15 WUE (L/kWh), SOTA cooling efficiency Not incremental improvement — a Liquid Cooling Air Cooling Free Cooling fundamenta

  22. Slide 22: Two-Story Architecture Petabit-Scale Network

    Two-Story Architecture Petabit- Scale Network Mezzanine-Level MEP Infrastructure Designed for 10,000+ GPU clusters Conventional data centers place mechanical, electrical, and Modern AI training demands massive east-west bandwidth plumbing (“MEP”) systems adjacent to the data hall, wasting with ultra

  23. Slide 23: Intelligent Load & Grid Management

    Energy Infrastructure Intelligent Load & Grid Smart Substation Natural Gas Generation Management Manages flow to Data Center Flexible dispatchable source Advanced power architecture can dynamically optimize flow from diverse sources to meet real-time demand Intelligent load management — channeling s

  24. Slide 24: Campus Integrated Power Generation

    Power Strategy Sustainability Campus Integrated Power Responsible Infrastructure Generation Building for Communities, not just Capacity. Grid + Gas + BESS + Renewables ATOM’s power strategy is designed not only to ensure reliability, but to establish a resilient, adaptable energy platform that mitig

  25. Slide 25: Standardized Product Platform

    Modular Design Standardized Product Platform ATOM establishes a unified design architecture, standardized across mechanical, electrical, and structural systems. Subsequent offerings can be efficiently adapted to address the full spectrum of AI and HPC requirements, leveraging shared vendor relations

  26. Slide 26: Fully Diluted Shares Outstanding

    Fully Diluted Shares Outstanding Unexercised Restricted Stock Security Class Shares Outstanding Shares Issued Employee Options Convertible Debt Fully Diluted Warrants Units Common Stock 53,449,171 53,623,529 - - - - 53,449,171 As of 12/31/25 Employee Options - - - - 650,000 - 650,000 2026 Stock Warr

  27. Slide 27: Site Survey

    Site Survey Nasdaq: NUAI | newerainfra.ai 27

  28. Slide 28: Nasdaq: NUAI | newerainfra.ai

    Nasdaq: NUAI | newerainfra.ai 28

  29. Slide 29: Nasdaq: NUAI | newerainfra.ai

    Nasdaq: NUAI | newerainfra.ai 29

New Era Energy & Digital — FY2025 Earnings Presentation on 6ix