  1. Slide 1: Powering the Next Digital Wave

    Powering the Next Digital Wave Investor Presentation Q4 2025 Nasdaq: NUAI

  2. Slide 2: Disclaimer

    Nasdaq: NUAI www.newerainfra.ai DISCLAIMER 2

  3. Slide 3: Who We Are

    www.newerainfra.ai Nasdaq: NUAI DATA CENTERS DELIVERED Development - ready parcels aggregated in strategic locations near fiber routes and major AI corridors, with engineered, high - spec, customizable buildings designed for phased, repeatable expansion across the Permian Basin DISCIPLINED DEVELOPME

  4. Slide 4: Fast Growing Market: Energy-Digital Convergence

    Nasdaq: NUAI www.newerainfra.ai Fast Growing Market TRENDS: Rapid growth of AI, HPC, cloud workloads is driving massive demand for power & infrastructure CHALLENGES: Existing data center/hyperscale infrastructure is constrained by speed - to - power, infrastructure, cooling, connectivity & environme

  5. Slide 5: Solutions

    www.newerainfra.ai Nasdaq: NUAI 5 SITE AGGREGATION & ENTITLEMENT Land, site engineering studies, permits, utilities, fiber INFRASTRUCTURE READINESS On - site natural gas generation + nuclear with option for hybrid/renewables; modular/phased buildouts for long - term lease or build - to - suit models

  6. Slide 6: Powered Land vs Powered Shell

    Nasdaq: NUAI www.newerainfra.ai Powered Land Raw land with secured and deliverable utility power capacity (such as substation access and a notice to serve), but no physical data center structures built yet WHY IT MATTERS: Enables faster time to operations since the most time - consuming step — power

  7. Slide 7: Powered Shell vs Powered Land

    Nasdaq: NUAI www.newerainfra.ai 7 “POWERED SHELL” VS “POWERED LAND” Powered Shell A completed data center building with power and core infrastructure (structure, roof, utilities) in place but not yet fitted with racks and IT systems WHY IT MATTERS: Provides a faster route to operation while allowing

  8. Slide 8: Competitive Landscape

    www.newerainfra.ai Nasdaq: NUAI 8 Multi - Category Competitors • Cloud Providers • Colocation/Interconnection • Data Center Operators • Infrastructure/Tech Providers • Data Center/Infrastructure Firms Key NUAI Differentiators • Fully Integrated Power + Infrastructure Approach (Powered Land, expandin

  9. Slide 9: Phase Execution Model

    Nasdaq: NUAI www.newerainfra.ai 9 4 - PHASE EXECUTION MODEL GTM: Scaling 1GW+ of compute capacity 3 2 1 4 REVENUE Energy - as - a - Service & anchor long - term leases, build - to - suit, joint ventures, possibly infrastructure services (power, connectivity), tokenized or performance - linked yields

  10. Slide 10: Value Creation Path

    Nasdaq: NUAI www.newerainfra.ai 10 VALUE CREATION PATH SUPPLY Gas • Grid • Nuclear • Renewables → Power Reliability DATA CENTER Land • Fiber • Water • Substations → Connectivity Backbone MONETIZATION AI Compute • Storage • Network Services • NNN Leases → Recurring Yield + Scaling through replication

  11. Slide 11: Data Centers in Development & Planned: Permian Basin

    Nasdaq: NUAI www.newerainfra.ai 11 DATA CENTERS IN DEVELOPMENT & PLANNED PERMIAN BASIN ~86,000 sq mi long , 2 nd largest natural - gas producing region in the U.S. 1 Midland Odessa TCDC LOCATION Outside City of Odessa, Ector County NUAI SITES IN DEVELOPMENT & EVALUATION Stargate (Abilene), Fermi Ame

  12. Slide 12: Flagship Project: Texas Critical Data Centers

    www.newerainfra.ai Nasdaq: NUAI 12 FLAGSHIP PROJECT Texas Critical Data Centers (TCDC), a 50/50 JV with Sharon AI POSITIONING: Premier site for AI - optimized data center complex in North America with projected power delivery beginning early 2027 PRIME LOCATION: Ector County, Texas; 235 acres secure

  13. Slide 13: Strategic Partnerships

    Nasdaq: NUAI www.newerainfra.ai Offers financing, construction, and operation of gas power islands ensuring reliable, scalable power and secure natural - gas supply as energy backbone STRATEGIC PARTNERSHIPS 13 Proprietary Digital Zero Power solution , a behind - the - meter natural gas system reduce

  14. Slide 14: Texas Critical Data Centers (TCDC) Campus

    Nasdaq: NUAI www.newerainfra.ai 14 TEXAS CRITICAL DATA CENTERS (TCDC) Vertically Integrated Data Center Campus, Permian Basin WEST ODESSA (1.1 GW POWER PLANT) VISTRA ENERGY (550 MW POWER PLANT) QUAIL RUN ENERGY NOTE: Representative only; not to scale.

  15. Slide 15: Indicative Timeline: Texas Critical Data Centers

    Nasdaq: NUAI www.newerainfra.ai 15 INDICATIVE TIMELINE Texas Critical Data Centers COMPLETED WORK • JV initialized with Sharon AI • Acquisition of 235 acres • Option secured for contiguous ~203 acres • Initial environmental and feasibility assessment • Initial site improvements • Preliminary Load St

  16. Slide 16: 2024/2025 Milestones and 2026 Outlook

    www.newerainfra.ai Nasdaq: NUAI x Begins trading on Nasdaq (“NEHC”) – Dec 9, 2024 x Opens 2025 Nasdaq trading – Jan 2, 2025 x Finalizes JV with Sharon AI (TCDC project)TCDC site secured; Phase 1 engineering launched x Strategic pivot to vertically integrated AI infrastructure; board realignment; ado

  17. Slide 17: Total Cap Table

    Nasdaq: NUAI www.newerainfra.ai % FULLY DILUTED FULLY DILUTED STRIKE PRICE ($) EMPLOYEE OPTIONS WARRANTS CONV. DEBT SHARES ISSUED SHARES OUTSTANDING SECURITY CLASS 84.27% 52,954,171 53,623,529 53,449,171 Common Stock 0.00% - - Common Stock - Convertible Debt 1.06% 665,000 $ 0.5349 665,000 Employee O

  18. Slide 18: Management

    Nasdaq: NUAI www.newerainfra.ai Will Gray is a founding partner and current Chief Executive Officer of New Era Energy & Digital, Inc . (previously, New Era Helium, Inc . ) . Will has extensive prior C - Level experience in Oil & Gas, including Executive Vice President of Resaca Exploitation (a Torch

  19. Slide 19: Thank You

    Nasdaq: NUAI www.newerainfra.ai THANK YOU For More Information www.newerainfra.ai Investor Relations Jonathan Paterson Jonathan.Paterson@HarborAccess.com

  20. Slide 20: Appendix A: Market

    Nasdaq: NUAI www.newerainfra.ai 20 APPENDIX A: MARKET 2024 2025 2026 2027 2028 $800B $693B $571B $464B $349B Investment Momentum Expected to Accelerate as Demand Grows Source: Dell’Oro Group. 1 Includes Cloud, Colocation, Telco, and Enterprise. GLOBAL ANNUAL DATA CENTER IT CAPEX 1 Hyperscalers are p

  21. Slide 21: Appendix B: Data Center Locations

    Nasdaq: NUAI www.newerainfra.ai 21 APPENDIX B: DATA CENTER LOCATIONS GRID: Understand local power utilities, their capabilities and capacity to provide for redundancy and protection SURROUNDINGS: Physical resilience is important, but so is disaster response NETWORK: Network latency is bad for busine

  22. Slide 22: Appendix C: Building Responsible AI Infrastructure

    Nasdaq: NUAI www.newerainfra.ai APPENDIX C: BUILDING RESPONSIBLE AI INFRASTRUCTURE 22 BEHIND - THE - METER POWER x On - site generation reduces grid strain x Natural gas + renewables integration x Pathway to carbon neutrality through the DZP process CLOSED - LOOP WATER SYSTEM x Water reused via heat