Tata Power Company Limited · NSE:TATAPOWER

Tata Power — The Tata Power Company — Investor Presentation (December 2010)

64 slides from Tata Power's investor presentation, December 2010

  1. Slide 1: The Tata Power Company Ltd Presentation December 2010

    Presentation Title The Tata Power Company Ltd December Presentation 2010 Subtitle 1

  2. Slide 2: Disclaimer

    Disclaimer Certain statements made in this presentation may not be based on historical information or facts and may be “forward looking statements”, including those relating to The Tata Power Company Limited‟s general business plans and strategy, its future outlook and growth prospects, and future d

  3. Slide 3: Agenda

    Agenda Part A: Overview of Tata Power Part B: Tata Power Generation Part C: Projects Part D: Other Power Businesses Part E: Other Businesses Part F: Financial Performance Part G: Sustainability 3

  4. Slide 4: Part A: Overview of Tata Power

    Part A: Overview of Tata Power

  5. Slide 5: A Tata Company

    A Tata Company Revenue Business Sectors FY 2010 Largest Companies Rs 3195.34 bn 16.4% $ 67.4 bn 33.2% 32.4% 4.5% 6.2% 3.9% 3.4% Profits FY 2010 Rs 82.4 bn $ 1.74 bn 47.4% 39.3% -26.0% -1.5% 24.0% 7.0% 9.7% 5

  6. Slide 6: Pioneer in Indian Power Sector

    Pioneer in Indian Power Sector First to Introduce SCADA and First 800 MW Fibre Optic thermal unit ground wire 220 kV communication Cable Computerized Transmission grid control Network and energy First pump management storage unit First system Flue Gas in the country 500 MW De-sulphurisation of 150 M

  7. Slide 7: Tata Power Group – Major Investments

    Tata Power Group – Major Investments Tata Power Subsidiaries Joint Ventures Investments & Associates Coastal Gujarat Power TECHNOLOGY 100% 30% KPC Ltd. (Mundra UMPP) Trust Energy Resources 5% Exergen 100% 30% Arutmin Pte. Ltd 10% Geodynamics Maithon Power Ltd. 30% Indocoal 74% 40% Tubed Coal 74% Ind

  8. Slide 8: Businesses

    Businesses Tata Power is India‟s largest private power utility with presence across the industry value chain – Fuel & Logistics, Generation, Transmission, Distribution and Trading Tata Power Power Business Other Business Generation Transmission Distribution Trading Fuel & Logistics • Trombay 12,13 •

  9. Slide 9: Part B: Tata Power Generation

    Part B: Tata Power Generation

  10. Slide 10: Generation: Business Models

    Generation: Business Models Current Capacity Returns Upside Value Drivers Our Projects (Targeted) Regulated 71% Normative Savings on Operational Mumbai (2127 MW) (25%-35%) RoE Norms. PLF Efficiency Operations, incentive Maithon, Wind Captive 18% PPA driven Merchant sales + Trading Jamshedpur (PH6),

  11. Slide 11: Existing Presence

    Existing Presence Mumbai 2027 MW Other Projects: 1. Indonesian Coal Mines: 30% stake Mumbai Operations 2. Australia: Geodynamics, 10% stake 3. Australia: Exergen, 5% stake Generation Thermal 1480 MW Powerlinks NDPL Hydro 447 MW Distribution Gujarat 50 MW Transmission Jojobera 428 MW Jamshedpur (IEL)

  12. Slide 12: Mumbai Operations - Generation

    Mumbai Operations - Generation Thermal Hydro Trombay - Thermal Unit Capacity Fuel Location Capacity Unit 4* 150 MW Oil & Gas Khopoli 72 MW Unit 5 500 MW Oil, Coal & Gas Bhivpuri 75 MW Unit 6 500 MW Oil & Gas Bhira 300 MW Unit 7 180 MW Gas Total 447 MW Unit 8 150 MW Coal Total 1480 MW * Unit 4 on sta

  13. Slide 13: Merchant Capacity

    Merchant Capacity Haldia* Trombay - Unit 8 Project Capacity 100 MW 100 MW Customers PPA with Tata Power Trading PPA with Tata Power Trading Hot flue gases from Hoogly Fuel Imported Coal Metcoke MUs Sold (Q2 FY11) 126 149 Realization (Rs/ unit) 3.61 4.19 MUs Sold (Q1 FY11) 153 178 Realization (Rs/ un

  14. Slide 14: Non-PPA Capacity - Mumbai

    Non-PPA Capacity - Mumbai  Starting April 1, 2010 we expected to have 458 MW (excl. 42 MW from Unit 4) to be released from its existing allocations.  100 MW of this was tied up with BEST and 358 MW was expected to be available to be sold under a new long-term PPA and/or in the short-term/trading m

  15. Slide 15: Belgaum

    Belgaum Capacity • 81 MW Generation (MU) Fuel Type • Heavy Fuel Oil 500 400 Customer • KPTCL 300 • 12 year PPA till 2012 200 100 Business • Bid Driven – Case 2 0 Model • Fuel charge is pass through FY07 FY08 FY09 FY10 • Other charges recovered as fixed PLF (%) 27 33 63 55 cost 15

  16. Slide 16: Jojobera

    Jojobera Capacity • 428 MW Generation (MU) • Unit 1: 67.5 MW, Unit 2-4: 120 MW each 3000 Fuel Type • Domestic Coal 2500 Customer • Tata Steel • 20 year PPA till 2017 2000 Business • Captive FY07 FY08 FY09 FY10 Model • Fuel and Interest are a pass through • Other expenses on normative basis PLF (%) 7

  17. Slide 17: PH-6 (IEL)

    PH-6 (IEL) Capacity • 120 MW Ownership Structure • IEL (74:26 JV of Tata Power and Tata Steel) CoD • August 2009 Fuel Type • Furnace / Coke Oven Gases of Tata Steel Customer • Tata Steel Business Model • Captive • Fuel and Interest are a pass through • Other expenses on normative basis Generation (F

  18. Slide 18: Wind

    Wind Capacity • ~221 MW Generation (MU) Customer • Maharashtra: TPC-D 100 MW 3rd Party 21 MW 400 • Karnataka: BESCOM 50 MW • Gujarat: GUVNL 50 MW 200 0 Business • Mainly Regulated Model FY07 FY08 FY09 FY10 • Tariff based on State regulations PLF (%) 19 20 19 19 FY11 Tariff Annual (Rs / kwh) Escalati

  19. Slide 19: Part C: Projects

    Part C: Projects

  20. Slide 20: Projects - Overview

    Projects - Overview Projects under Execution • 4000MW Mundra UMPP , Gujarat •1050 MW Project at Maithon, Jharkhand • 120 MW Unit 5 at Jojobera, Jharkhand • 114 MW DHPC Hydro Project, Bhutan •3 MW Mulshi Solar Project,Maharashtra Tamakoshi Nepal 800 MW DHPC Bhutan 114MW •25 MW Mithapur Solar Project

  21. Slide 21: Mundra UMPP

    Capacity • 4000 MW (5 x 800 MW) Ownership Structure • 100% subsidiary; Coastal Gujarat Power Limited Business Model • Case 2 – Bid Driven Fuel Requirement • Imported Coal, 11-12 mtpa Fuel Source • Offtake agreement with KPC and Arutmin for 10.11 ± 20% • Looking for additional mines in Australia, Moz

  22. Slide 22: Mundra UMPP

    Current Status • Overall ~65% work completed; ~11,000 people on site Construction • Distributed Control System (DCS) power on was achieved in September 2010 Activities • Unit #2 boiler hydro testing was also successfully completed in September 2010 • Erection of boiler pressure parts for Units 3, 4

  23. Slide 23: Mundra – Site Photographs

    Mundra – Site Photographs Plant view from Skimmer Bay 23

  24. Slide 24: Mundra – Site Photographs

    Mundra – Site Photographs View from chimney top – Sea water Intake channel 24

  25. Slide 25: Mundra – Site Photographs

    Mundra – Site Photographs Sheeting work on coal conveyor Stacker Cum Reclaimer work in ICHS area 25

  26. Slide 26: Maithon

    Capacity • 1050 MW (2 x 525MW) Ownership Structure • 74: 26 JV of Tata Power and Damodar Valley Corporation Business Model • CERC Regulated Fuel Requirement • Domestic Coal Fuel Source • 100% linkage sanctioned. Active discussions on to sign Fuel Supply Agreements with coal mines Customers • DVC (30

  27. Slide 27: Maithon

    Current Status  ~90% of work completed Construction  Unit 1: Boiler Hydro test completed on March 23rd, 2010 Activity  Unit 1: Turbine erection commenced; boiler light up expected this month  HP turbine 1 erection and the 400 kV switchyard back charging completed  FSA with BCCL signed for 1.6 M

  28. Slide 28: Maithon – Site Photographs

    Maithon – Site Photographs Unit 1 TG Floor BTG Area 28

  29. Slide 29: IEL – Unit 5, Jojobera

    IEL – Unit 5, Jojobera Project Capacity • 120 MW Ownership Structure • IEL Business Model • Captive Power Plant Funding • Project Cost: Rs 6.20 bn • D/E 70:30 Construction • Synchronized in April‟ 2010 Activity • Commissioning expected in January‟2011 Project Description • Fuel: Coal Linkage from We

  30. Slide 30: Jojobera (Unit 5)

    Jojobera (Unit 5) Jojobera Unit #5 CW Pump Motors Erected 30

  31. Slide 31: Hydro Projects

    Hydro Projects  Exclusive partnership agreement with SN Power, Norway to develop joint hydropower projects in India and Nepal JV with SN Power  Aim to have 2000 MW under construction or in operation by 2015  Establish jointly owned Services Company to provide technical and managerial expertise 

  32. Slide 32: The Indian Solar Scenario

    The Indian Solar Scenario NATIONAL SOLAR MISSION (CENTRAL LEVEL) TARGET Grid-parity for solar power by 2022, and coal-based parity by 2030 ROADMAP Installed Capacity Phase I Phase II Phase III (in MW) 2009 - 2013 2013 - 2017 2017 - 2022 Grid-connected 1000 - 2000 4000 – 10,000 20,000 Off-grid 200 10

  33. Slide 33: Tata Power Solar Intent

    Tata Power Solar Intent  Our intent is to leverage the National Solar Mission ( NSM) policy and grow our solar portfolio  We expect to have 300 MW solar based capacity over the next 4-5 years  We are currently implementing a 3 MW, Solar PV based, grid-connected plant in Maharashtra  The plant is

  34. Slide 34: Captive Coal Blocks

    Captive Coal Blocks Mandakini Coal Block • 7.5 MTPA (jointly allotted with Jindal Photo Film and Monnet Ispat & Energy - each JV Partner having a share of 2.5 MTPA) at Dist. Angul, Orissa • Mining plan approved by MoC  Land acquisition for the coal block is expected by March 2012 and 6(i) notificat

  35. Slide 35: Projects in Pipeline

    Projects in Pipeline Project Fuel Source Capacity (MW) Coastal Maharashtra (Dehrand) Imported Coal 1600 + 800 Naraj Marthapur IPP Captive Coal - Mandakini 1200 Captive Coal – Tubed + Tiruldih IPP / CPP 1200 Coal from Tata Steel Corus (Tata Steel) Production Gases (Corus) 525 Tama Koshi, Nepal Hydro

  36. Slide 36: Generation Capacity (Tata Power Group)

    Generation Capacity (Tata Power Group) Excludes Projects Under Planning 10000 8411 Added in the Year 2400 8000 Total Capacity at Year End 6011 1718 6000 Capacity 4293 1315 2978 4000 2786 CGPL 1600 CGPL 2400 192 Wind 118 421 2000 Unit 8 250 PH6 120 IEL 120 2365 Wind 81 Wind 42 Maithon 1050 Haldia 90

  37. Slide 37: Part D: Other Power Businesses

    Part D: Other Power Businesses

  38. Slide 38: Distribution Customer Profile – Mumbai

    Distribution Customer Profile – Mumbai Sales (MUs) Bill payment Kiosk Commercial Industrial 40% 53% Residential 7%  Over 84,000 customers since MERC Order allowing us to distribute power to retail customers Regulated Equity: Rs 1.96 bn (H1 FY 11) RoE: 16% 38

  39. Slide 39: Our Growth Expectations in Mumbai

    Our Growth Expectations in Mumbai Customer Base (Lakhs) Energy (BU) and Peak Demand (MW) 3.2 ~1050MW 3.0 ~6.5 ~450MW ~6.2 1.8 ~4.7 ~2.5 0.6 FY10 FY11 FY12 FY13 39

  40. Slide 40: North Delhi Power Limited (NDPL)

    North Delhi Power Limited (NDPL) PAT Rs. crore Customer Base • >1 million customers with 400.00 5000 MUs of consumption 300.00 200.00 Business Model • Regulated 100.00 Revenue • Rs 22.75 bn - (H1 FY11) FY07 FY08** FY09 FY10 Regulated • Rs 7.80 bn Equity Incentives* 72 53 79 58 ROE % • 16% on capital

  41. Slide 41: Transmission - Mumbai

    Transmission - Mumbai • Around 1100 ckm network comprising of 973 ckm of 220 kV / 110 kV overhead lines and 124 ckm of 220 kV / 110 kV underground cables. • Two Extra High Voltage (EHV) lines capacity augmented (170 MVA to 350 MVA) by replacement of the conductor with new technology “High Ampacity c

  42. Slide 42: Powerlinks Transmission Limited

    Powerlinks Transmission Limited Capacity • 1200 km 400 kV double-circuit PAT Rs. crore transmission lines 120 Business Model • Regulated 100 80 Revenue • Rs 1.45 bn 60 (H1 FY11) 40 20 0 Regulated Equity • Rs 4.64 bn FY08 FY09 FY10 ROE % • 15.5% Incentives 3.7 8.4 5.8 Incentive • As a percent of equi

  43. Slide 43: Indonesian Coal Mines – Structure of Investment

    Indonesian Coal Mines – Structure of Investment Tata Power Company Ltd. (India) Bhivpuri Bhira Investments Ltd. Investments Ltd. (Cyprus) (Mauritius) Indocoal KPC Arutmin (Cayman Islands) (Indonesia) (Indonesia) Bumi Resources (Indonesia) 43

  44. Slide 44: Indonesian Coal Mines

    Indonesian Coal Mines Organizational Structure Offtake Agreement • 40% representation on the Board of • 10.1+ 20% MT on a take or pay basis Commissioners and the Board of Directors • Indocoal Resources (Cayman) agrees to with affirmative rights trade outside of India any coal that Tata • CFOs at KPC

  45. Slide 45: Indonesian Coal Mines

    Indonesian Coal Mines Operating Performance CY ‘09 CY ‘08 • Quantity mined (MT) ~63 ~53 • Average Selling Price (FOB USD/ton) ~62 ~73 • EBITDA from Operations (USD mn) 815 1131 Source – Bumi Resources Debt Repayment Schedule (as of December „10) Loan Loan Amount Interest Maturity Repayment Details A

  46. Slide 46: Shipping Subsidiaries

    Shipping Subsidiaries • Trust Energy Resources Pte Ltd incorporated in Singapore for owning ships to meet shipping requirements and trading in fuels, Energy Eastern Pte Ltd incorporated for chartering of ships • Present shipping requirements of 8 vessels for Mundra • To be met through a combination

  47. Slide 47: Tata Power Trading Company Limited

    Tata Power Trading Company Limited TPTCL Sales (MU) 5000 4000 3000 TPTCL is one of 2000 the largest trading 1000 company with ~9% 0 FY06 FY07 FY08 FY09 FY10 market share H1 FY11 Revenue – Rs 11.33 bn PAT – Rs 45 mn 47

  48. Slide 48: Part E: Other Businesses

    qe TATA Part E: Other Businesses

  49. Slide 49: Strategic Electronics Division (SED)

    Strategic Electronics Division (SED) • Originated as an internal R & D unit for power electronics. Knowledge base now being used for applications related to defence electronics. However, it has no involvement in explosives manufacturing • Revenues of Rs.1.23 bn (Mar 10) against Rs.1.01 bn during the

  50. Slide 50: Tata BP Solar

    Tata BP Solar • 51:49 JV between BP Solar and Tata Power • Market leader in Solar Photovoltaic technology in India with a turnover of Rs 9.76 bn in FY10 • The turnover of the Co. in India and SAARC region is about Rs. 2.78 bn. With exports to BP Solar accounting for about Rs. 6.98 bn • Nearly 75% of

  51. Slide 51: Part F: Financial Performance

    Part F: Financial Performance

  52. Slide 52: Standalone – Q2 FY11

    Standalone – Q2 FY11 Rupee in Billions Q2 FY11 Q2 FY10 H1 FY11 H1 FY10 Operating Income 16.36 17.21 35.04 37.37 Operating Expenditure (12.72) (12.98) (26.84) (26.79) Operating Profit 3.64 4.23 8.20 10.58 Interest (1.08) (1.01) (1.88) (2.19) Financial Charges (0.13) (0.06) (0.18) (0.09) Depreciation

  53. Slide 53: Consolidated – Q2 FY11

    Consolidated – Q2 FY11 Rupee in Billions Q2 FY11 Q2 FY10 H1 FY11 H1 FY10 Operating Income 48.09 47.53 99.94 96.06 Operating Expenditure (36.51) (38.00) (76.91) (74.42) Operating Profit 11.58 9.53 23.03 21.64 Interest (2.08) (1.87) (3.80) (3.93) Financial Charges (1.29) (0.05) (0.27) (0.09) Depreciat

  54. Slide 54: Funding Requirement (FY11-FY13)

    Funding Requirement (FY11-FY13) Own Funds Debt (Rs.47 Billion) (Rs.132 Billion) • Internal accruals: Rs.35 bn • Domestic loans through domestic financial institutions, banks and capital markets • Balance FCCB proceeds (as on Mar 31, „10): $ 250 mn • Foreign loans through External Credit Agencies and

  55. Slide 55: Tata Power – Financials (Standalone)

    Tata Power – Financials (Standalone) Profit After Tax (In Billion Rs.) Standalone Numbers (H1 FY11) 8.7 9.22 9.39 6.97 6.11 Debt: Rs. 63.6 bn Equity: Rs. 111.6 bn Cash: Rs. 10.4 bn 2006 2007 2008 2009 2010 D/E: 0.57 EPS (in Rs.) Net Worth (In Billion Rs.) 44 41 91.32 39 34 71.85 29 63.63 40.1 44.67

  56. Slide 56: Tata Power – Financials (Consolidated)

    Tata Power – Financials (Consolidated) Profit After Tax (In Billion Rs.) Consolidated Numbers (H1 FY11) 19.67 Debt: Rs. 218.7 bn 12.19 10.55 Equity: Rs. 133.7 bn 7.47 7.59 Cash: Rs. 23.7 bn D/E: 1.6 2006 2007 2008 2009 2010 Net D/E: 1.4 EPS (in Rs.) Net Worth (In Billion Rs.) 104.77 85.01 76.43 57.0

  57. Slide 57: Dividend History

    Dividend History 50 50 Dividend (Rs) 45 EPS (Rs) 45 40 Payout Ratio (%) 40 35 35 30 30 Rs 25 25 % 20 20 15 15 10 10 5 5 0 0 FY06 FY07 FY08 FY09 FY10 57

  58. Slide 58: Part G: Sustainability

    «lp TATA | : Part G: Sustainability Lighting up Lives! Kye *

  59. Slide 59: Sustainability – An 8-Fold Path

    Sustainability – An 8-Fold Path 1. Environment 2. Business Practices 3. Architecture of CARE 4. Renewables 5. New Technologies 6. Community Relations 7. Advocacy for Sustainability 8. New Models for Sustainable Development 59

  60. Slide 60: Thrust on Renewables

    Thrust on Renewables • Wind: Exploring newer technologies and development options • Solar: National Solar Mission Opportunity • Geothermal: Opportunities in Australia, Indonesia and India • Hydro Power: Identification and development of hydro projects • 26% stake in Dagachhu Hydro Project in Bhutan

  61. Slide 61: Various Technologies being Explored

    Various Technologies being Explored • Solar Concentrated Thermal (SCT) • Geo Thermal energy • Coal beneficiation technologies 61

  62. Slide 62: Demand Side Management and Energy Conservation

    Demand Side Management and Energy Conservation • Tata Power Energy Club formed for curbing energy wastage through school children. The Club has sensitised over 50,000 students across India who have sensitised over 75,000 people in their community • Energy conservation awareness campaigns for Custome

  63. Slide 63: Our initiatives on DSM and Energy Conservation

    Our initiatives on DSM and Energy Conservation 63

  64. Slide 64: Thank you

    qe TATA Thank you We take pride in Lighting up Lives! Lighting up Lives! TATA POWER : a4

The Tata Power Company — Investor Presentation (December 2010) on 6ix