Slide 1: CEO to participate at the Singapore Mining Day Conference hosted by Spark Plus
15 September 2023 CEO TO PARTICIPATE AT THE SINGAPORE MINING DAY CONFERENCE HOSTED BY SPARK PLUS Greenvale Energy Ltd (“Greenvale”, the “Company” or ASX: “GRV”) is pleased to announce that Chief Executive Officer, Mark Turner will be presenting at the Spark Plus Singapore Mining Day Conference today
Slide 2: Driving Change
For personal use only DRIVING CHANGE A dynamic fusion of bitumen and geothermal energy to help meet Australia’s infrastructure needs
Slide 3: Important Information
Important Information DISCLAIMER The forward-looking statements in this presentation are based on current expectations, estimates, forecasts and projections about This document and all other information (whether in writing or otherwise) which may be made available, or part thereof does not: Greenval
Slide 4: Corporate Summary
Corporate Summary Greenvale Energy Ltd (ASX: GRV) CAPITAL STRUCTURE Shares on issue M 433 For personal use only Options M 28 Share price (11 September 2023) A$ $0.08 Market Capitalisation (11 September 2023) A$ $32.9m Cash & Liquid Investments (11 September 2023)1 A$ $7.93m Top 20 Shareholders % 45%
Slide 5: Greenvale Energy Ltd – Value Proposition
Greenvale Energy Ltd – Value Proposition Two unique projects, one driving goal. For personal use only SAFER ALPHA QLD TORBANITE GEOTHERMAL PROJECT MORE SUSTAINABLE PROJECTS High-grade bituminous shale Untapped renewable energy opportunity SEALED ROADS Australia’s only end-to-end producer of high-qua
Slide 6: On the Road to Success: Alpha Torbanite Project (QLD)
For personal use only ON THE ROAD TO SUCCESS ALPHA TORBANITE PROJECT (QLD)
Slide 7: Alpha Torbanite Project – Summary
Alpha Torbanite Project – Summary A unique and viable indigenous source of bitumen For personal use only 18.6Mt inferred resource of Torbanite & Cannel Coal 698ltrs of hydrocarbons per tonne of Torbanite 21.29m barrels of synthetic oil equivalent Located in central QLD, 500km west of Rockhampton
Slide 8: Top of the class
Top of the class Alpha among the highest yielding oil shales globally Comparative data of various oil shales For personal use only Torbanite/Coal/ Oil Yield (LTOM) Deposit Oil shale Range Average Torbanite 50 - 620 420 Alpha, Qld Cannel coal 50 - 150 120 Green River (USA) Oil shale 45 - 460 135 Rund
Slide 9: Mineral Resource Estimate
Mineral Resource Estimate Maiden JORC MRE complete For personal use only MDL330 Inferred Mineral Resource estimate by seam and ply unit Waste Waste Area Volume Tonnes Seam/Ply Thickness Volume (m²) (m³) (Air-Dried) (m) (bcm) U 2,587,232 2,733,615 13.27 77,182,496 3,280,338 L1 6,322,012 6,466,130 13.
Slide 10: Alpha Project – Liquefaction Test Program
Alpha Project – Liquefaction Test Program Extensive liquefaction test program underway and yielding exciting results For personal use only ↑ 72% increase in conversion from solids to oil and gas (Test Program 2 to 3)
Slide 11: Alpha Project – Update
Alpha Project – Update Resource Upgrade nears completion as Liquefaction Test Program Four commences For personal use only Globally recognised university 100 years bitumen experience Leaders in hydrothermal liquefaction Industry experts Drilling on location at Alpha
Slide 12: Bitumen Market – Supply & Demand
Bitumen Market – Supply & Demand Bitumen importation feeds critical infrastructure with a heavy reliance on China For personal use only
Slide 13: Bitumen Market – Price
Bitumen Market – Price C170 bitumen prices remain strong For personal use only ↑21% Increase in average monthly gate prices for C170 bitumen since Sep-21 $1,497QLD C170 closing price as at Sep-23
Slide 14: Untapped Potential: Geothermal Projects (QLD)
For personal use only UNTAPPED POTENTIAL GEOTHERMAL PROJECTS (QLD)
Slide 15: Why Geothermal?
Why Geothermal? Sustainable production, significant opportunity For personal use only Not Reliant on Weather 24hr Dispatchable Electricity Ultra-Low Emissions Profile
Slide 16: Geothermal – Project Status
Geothermal – Project Status Untapped Renewable Energy Opportunities in Queensland For personal use only
Slide 17: Geothermal – Closed Loop Technology
Geothermal – Closed Loop Technology Breaking new ground in Australia with CeraPhi Energy For personal use only No GHG No fracking No water use No aquifer contamination Closed loop down hole heat exchanger
Slide 18: The road so far…and the road ahead
The road so far…and the road ahead Major milestones achieved along the way and those to come Bitumen Certification Product samples sent to Technix for certification. For personal use only Modified Fischer Assay Alpha Production MFA results confirm high- Alpha PFS Plant fully operational. yielding na
Slide 19: Why Greenvale?
Why Greenvale? GRV is paving the way VISION For personal use only To become the only sustainable, end- to-end, domestic and fully carbon- offset producer of bitumen products to feed the critical infrastructure needs of Australia. CAPABILITY Experienced Board and Management ACTION Articulated renewab