Slide 1: Symons Hill Project Update
Matsa Resources Limited Symons Hill Project Update March 2013 For personal use only ASX: MAT
Slide 2: Forward Looking Statements
Forward Looking Statements The material used in this presentation is intended to be a summary of selected geological data, current and proposed activities, as For personal use only well as resource estimates based on information available to Matsa Resources Limited (“Matsa” or “the Company”) at the
Slide 3: Undervalued and Tightly Held
Undervalued and Tightly Held For personal use only Shares on Issue 134.62 million Director/Employee Options (Unlisted 31 - 45 cents) 13.05 million Top 20 Shareholders 51.5% Major Shareholders JP Morgan 12.00% HF Resources 8.74% Paul Poli 7.87% RASL 6.30% Directors Paul Poli – B.Com FCPA Frank Sibbel
Slide 4: Seven Projects – One Company
Seven Projects – One Company Mt Henry Gold JV – BFS Underway For personal use only Symons Hill Fraser Range - Exploration Dunnsville Gold – Exploration Dundas Iron Ore – Phase 2 Exploration Siam Copper – Soil Sampling Paisali Iron Ore – Ground Magnetics KT Gold – Anomaly Definition www.matsa.com.au
Slide 5: 4,520km2 Portfolio - WA
4,520km2 Portfolio - WA • 3,695km2 in Fraser Range and NE For personal use only Goldfields Symons Hill Project 96km2 Fraser Ranger North 354km2 • Mt Henry JV BFS underway • Mt Henry JV Brownfields exploration progressing • Killaloe and Dunnsville gold projects progressing • Minigwal – applications a
Slide 6: Mt Henry 1.5Moz Gold – BFS Underway
Mt Henry 1.5Moz Gold – BFS Underway Mt Henry Gold Project Resources (100% Basis) For personal use only (>1g/t Au) Tonnes Grade Ounces (g/t) Indicated Mt Henry 5,874,000 1.93 364,500 11,776,000 1.59 602,000 Selene North Scotia 214,000 5.20 35,800 17,864,000 1.75 1,002,300 Total Inferred Mt Henry 5,09
Slide 7: Mt Henry Scoping Study
Mt Henry Scoping Study (Source: PAN ASX Release Dec 2012) For personal use only www.matsa.com.au Symons Hill Project Exploration Update - March 2013
Slide 8: Symons Hill 100% Matsa Owned
Symons Hill 100% Matsa Owned For personal use only • E69/3070 Application Granted • Native Title Heritage Agreement Signed • Environmental - Flora Survey concludes there is no impact on Priority Ecological Communities (PEC’s) • Programmes of Work (POW’s) applied for to enable vehicle access and line
Slide 9: Symons Hill Neighbours
Symons Hill Neighbours Matsa For personal use only Fraser Range North JV • Sirius drilling discovers Bollinger deposit 200m East of Nova • Auger sampling by Boadicea close to Nova, assays awaited • VTEM completed by Buxton identifies Widowmaker • VTEM by Sheffield identifies Red Bull Targets • IP an
Slide 10: Nickel Soil Geochemistry
Nickel Soil Geochemistry • 833 Soil Samples have identified 5 For personal use only Geochemical Targets (SH01 – SH05) Coincident Ni Cu Targets (SH01 and SH04) Ni only targets (SH02 and SH03) Cu only target (SH05) • Infill Sampling completed SH01 and Part of SH04 • Close association with Symons Hill
Slide 11: Copper Soil Geochemistry
Copper Soil Geochemistry Coincident Ni Cu Targets (SH01 For personal use only • and SH04) Coincident Ni Cu commonly indicates Copper Nickel Soils the presence of Nickel Sulphide Soils Mineralisation • 1 Cu only target (SH05) and 2 Ni only targets (SH02 and SH03) indicate potential for other base met
Slide 12: Ni Cu Geochemistry over Magnetics
Ni Cu Geochemistry over Magnetics • New magnetic data clearly defines For personal use only Symons Hill fault zone • Magnetic features define layering in basement gneisses • Distinctive hook shaped magnetic anomaly defines Eastern and Southern margins of SH01 • Key Geochemical anomalies within and c
Slide 13: Ni Cu Geochemistry over Heli-VTEM
Ni Cu Geochemistry over Heli - VTEM • Total of 622 Line km surveyed for EM and Magnetics For personal use only • >20 EM conductors including 6 Priority 1 (SH_VA1-6) • 2 Priority 1 conductors (SHVA4 and SHVA5) close to SH01 • 1 priority 1 conductor (SHVA3) close to SH04 • Priority conductors within a
Slide 14: Symons Hill Project Schedule
Symons Hill Project Schedule For personal use only • Programme Of Works (POW) lodged for Access and Ground EM Surveys • Ground clearing and EM surveys planned to commence on 6 priority VTEM targets and SH01 in ~10 days • Additional infill soil sampling to better define SH02 - SH05 • Drill targets to
Slide 15: Summary
Summary For personal use only Symons Hill is an exciting project which is progressing well and could add significant value to shareholders www.matsa.com.au Symons Hill Project Exploration Update - March 2013