Slide 1: Corporate Presentation – Gold Production Commenced
Corporate Presentation Gold Production Commenced Noosa Mining Investor Conference | 23-25 July, 2025 ASX:MAT

Slide 2: Matsa Corporate Overview
Matsa Corporate Overview Gold Resource Gold Reserve Shares on Issue* DIRECTORS 949,000 oz @ 104,000 oz @ 749.3M @ Paul Poli Executive Chairman 2.5 g/t 2.4 g/t 7.2c Mr Poli is a CPA with over 34 years of business and corporate experience. He founded Matsa Resources and has spearheaded M&A deals with

Slide 3: 949,000 Ounces of Gold With A Twist Of Lithium
Iv) AN ToA\ SOURCES 949,000 Ounces of Gold With A Twist Of Lithium

Slide 4: Its been a very busy first half in 2025
Its been a very busy first half in 2025 # Maiden gold reserve at Devon (24/01/25) Unsolicited takeover bid announced Monday 10th February 2025 Fantastic high grade gold intercept at Fortitude North (11/02/25) Feasibility study for Devon released (19/02/25) Lake Carey sale agreement with AngloGold As

Slide 5: Poised to deliver shareholder wealth
Poised to deliver shareholder wealth Culmination of the past 2 years of strategic planning, determination and hard work Source: ASX website 21 July 2025

Slide 6: Lake Carey Gold Project – Drilling at Devon
Lake Carey Gold Project Drilling at Devon June 2025

Slide 7: Devon Mine Plan is Coming Together
Devon Mine Plan is Coming Together

Slide 8: Devon Mine Plan is Coming Together
Devon Mine Plan is Coming Together Maiden gold reserve at Devon (24/01/25) Feasibility study for Devon released (19/02/25) Mining Agreement with BCM (28/03/25) Processing Agreement with FMR (28/04/25) Mining Fleet mobilised and mine/camp infrastructure in place (27/06/25) Mining commence

Slide 9: Devon Pit – High Grade
Devon Pit – High Grade February 2025 Base Case Upside Case Feasibility Study (pre-tax) (A$4,250/oz) (A$5,000/oz) 340kt @ 4.6 g/t Au for Mining inventory 50,267 ounces (mined) Gold sold - 42,476 ounces Life of mine (LOM) 18 months LOM Revenue net royalties (A$M) $179.2M $207.8M LOM OPEX (A$M) $116M $

Slide 10: Devon Pit – Key Financial Metrics
Devon Pit – Key Financial Metrics Item Cost (A$M) Mining 57.6 Haulage 25.1 Processing 26.1 Other costs 3.5 Revenue (net of royalties) 207.8 *Refer Devon Pit Feasibility Study ASX announcement 19 February 2025, using A$5,000/oz gold price, numbers contain rounding errors

Slide 11: Mine Plan
Mine Plan • Mining of West Lode can occur concurrently with dewatering of Main Lode • No lead time to ore production • Two diggers to maximise ore production and waste move

Slide 12: Mine Plan
Mine Plan • Mining of West Lode can occur concurrently with dewatering of Main Lode • No lead time to ore production • Two diggers to maximise ore production and waste move

Slide 13: Mining - design
Mining - design • Mine Design has starter pit on the West Lode (in green), with a second stage on the Main Lode (blue – right, and red – below below) • NW and NE pits can be mined separately after infill drilling and possible redesign • Dilution (30%) and ore loss (5%) applied post pit design*

Slide 14: Metallurgy and Processing
Metallurgy and Processing • Executed agreement with FMR (Greenfields) who have 3 grind circuits, 7 leaching tanks with 1.1Mt pa capacity • Appointed JT Metallurgical Services to manage the mill optimising Matsa’s ore processing through increase/decrease grind size, throughput rates, reagent usage an

Slide 15: Infrastructure Already In Place
Infrastructure Already In Place 5km

Slide 16: Infrastructure Already In Place
Infrastructure Already In Place We have the assets and funding to create significant value Devon Pit Gold Mine • Fully permitted • 25 km from Red October accommodation village • 72 person Red October camp • All haulage infrastructure in place • Airstrip • Traditional open pit mining methods • Matsa

Slide 17: Lake Carey Gold Project
Lake Carey Gold Project A substantial golden opportunity • 3 Gold Mines o Fortitude Gold Mine o Devon Pit Gold Mine o Red October Underground Gold Mine • A world class exploration target o Fortitude North • Pipeline of quality greenfields and brownfields exploration targets to be drilled including:

Slide 18: AngloGold Option Agreement
AngloGold Option Agreement Option Agreement signed (27/02/25) First option fee AUD$500,000 received (27/02/25) All Conditions Precedent met, Agreement now unconditional (23/06/25) AUD$4.5M Option fee paid to Matsa (25/04/25) AGA select tenements to proceed next stage of Options Agreement (

Slide 19: Fortitude North - Matsa Discovery
Fortitude North - Matsa Discovery • 1.7km long mineralised zone open along strike with strong Fortitude potential to increase with drilling expected to commence in the North near term • Along strike and 6km north of Fortitude Gold Mine (0.5Moz) • Regional structure >30km strike • Mineralisation stru

Slide 20: Fortitude North Drilling
Fortitude North Drilling^ • Seven of the top twelve intercepts at Fortitude North have come from the 2023 program^: • 25m @ 3.3g/t Au from 147m (23FNRC006) • 14m @ 3.4g/t Au from 113m, and; 35m @ 3.0g/t Au from 150m (23FNRC016) • 19m @ 3.8g/t Au from 100m (23FNRC011) • 11m @ 3.8g/t Au from 108m (23F

Slide 21: Fortitude North Drilling
Open Fortitude North Drilling* 22m @ 9.19g/t Including 9.14m @ 11.93g/t Au and 7.20m @ 12.98g/t Au Open * Refer ASX announcement dated 11 February 2025

Slide 22: Successfully Predicted
Successfully Predicted a RESOURCES 400 RL 25FN2011 25FNDDO12 10.35m @ 3.4g/tAu 10.5m @ 6.57g/t Au 0.35m @ 12.06g/t Au BBO 100 metres _ High grade plunging lodes / i ani New drilling ooRL @ Previous drilling DaENDDTO 2025 Drilling Target Area 22m @ 9.19g/t Au 17m@ 3.01g/tAu O New drill intercepts 676

Slide 23: What's Next?
What’s Next ? Using A$4,550/oz gold price • Gold mining at Devon (from June 2025) • First ore processing campaign scheduled for September 2025 • Further drilling at Fortitude North • Drilling for growth (extensions) at Devon • Progress the Anglo transaction • Plenty to talk about in Thailand

Slide 24: Lake Carey Resource – 949,000oz Au
Lake Carey Resource – 949,000oz Au “Refer ASX announcement dated 30 April 2024. There has been no change to the mineral resource since this release.

Slide 25: Lake Carey Reserve – 104,000oz Au
Lake Carey Reserve – 104,000oz Au Proven Probable Total Reserve Project ('000t) g/t Au ('000t) g/t Au ('000t) g/t Au ('000 oz) Red October UG - - - - - - - Devon Pit - - 309 4.6 309 4.6 46 Fortitude Pit - - 1,029 1.8 1029 1.8 58 Total - - 1,338 2.4 1,338 2.4 104 “Refer ASX announcement dated 24 Janu

Slide 26: Disclaimer and Forward Looking Statements
Disclaimer Disclaimer and Forward Looking Statements This presentation has been prepared by Matsa Resources Limited (“Matsa” or the “Company”). It should not be considered as an offer or invitation or inducement to subscribe for or the purchase of any securities in the Company. This presentation may

Slide 27: Contact Us
Contact Us Paul Poli Executive Chairman reception@matsa.com.au 27

Slide 28: Devon Fully Permitted
Devon Fully Permitted Item Purpose Status Comment Tenements Granted mining Valid to December (and misc) leases 2034 Haulage Allows ore haulage on Shire approvals Menzies and Leonora public roads obtained shires Mining Proposal Approval for construction of Approved Approved 9 July 2024 infrastructure

Slide 29: M&A Activity
M&A Activity EV/Oz Avg EV/Oz Recent M&A activity for ASX listed WA pre-production assets (Refer Appendix 1 for full references including resource breakdown and transaction announcement date) $218.9/oz $216 .8/oz $176.3/oz $8 8 .0/oz $9 3.7/oz $77.6/oz $6 7 .7/oz $6 5 .9/oz $5 3.8/oz $5 1 . 1 /oz $40

Slide 30: M&A Activity
M&A Activity Recent M&A activity for ASX listed WA pre-production assets (Refer Appendix 1 for full references including resource breakdown and transaction announcement date) 1.85g/t Au * 0.29 moz * Linden Gold Alliance Limited announcement 27 October – merger with Lord Bryon Mining, 292,900oz @ 1.8

Slide 31: Appendix 1: Pre-production WA Gold M&A Peer Comparison
Appendix 1: Pre-production WA Gold M&A Peer Comparison Information & References Source: Respective ASX disclosures as per listed release date in above table. All projects are located in Western Australia and were at the pre-development stage at the time of transaction other than Pantoro-Tulla which
Source: ASX announcement via 6ix News
More decks from Matsa Resources Ltd
Investor Presentation (May 2026)33 slides · May 2026
RIU Explorers Conference 202632 slides · Feb 19, 2026
Noosa Mining Investor Conference 202530 slides · Nov 13, 2025
Australian Gold Conference 202528 slides · Oct 15, 2025
RIU Sydney Resources Roundup 202533 slides · May 8, 2025
RIU Explorers Conference 202531 slides · Feb 19, 2025