  1. Slide 1: The Bulgera Gold Heap Leach Project – Scoping Study Results

    Slide 1: The Bulgera Gold Heap Leach Project – Scoping Study Results

    The Bulgera Gold Heap Leach Project rsonal use only Scoping Study Results “The Bulgera project stands on the traditional lands of the Gingirana people. Norwest remains truly grateful for their ongoing support and offer its sincere respect to their Elders, past, present and emerging.” NOVEMBER 2026 N

  2. Slide 2: Cautionary Statement

    Slide 2: Cautionary Statement

    NORWEST MINERALS LTD BULGERA GOLD PROJECT CAUTIONARY STATEMENT The Scoping Study referred to in this presentation has been undertaken to determine the potential viability of open- rsonal use only pit mining and heap leach processing at the Bulgera Gold Project and to reach a decision to proceed with

  3. Slide 3: Cross reference, LR 5.23 Confirmation and Forward-Looking Statements

    Slide 3: Cross reference, LR 5.23 Confirmation and Forward-Looking Statements

    NORWEST MINERALS LTD BULGERA GOLD PROJECT Cross reference Mineral Resource Estimate is extracted from the ASX announcement "Bulgera Gold Heap Leach Project – Mineral Resource and Project Update" dated 1 July 2026, and the Scoping Study results/production targets are extracted from "Bulgera Gold Proj

  4. Slide 4: Competent Persons Statement

    Slide 4: Competent Persons Statement

    NORWEST MINERALS LTD BULGERA GOLD PROJECT Competent Persons Statement The information in this presentation that relates to Mining Costs, Mine infrastructure and earthworks, Mine Scheduling and Financial modelling is based on and fairly represents information provided by Mr Andrew Hollis, a Competent

  5. Slide 5: Key Scoping Study Takeaways

    Slide 5: Key Scoping Study Takeaways

    NORWEST MINERALS LTD BULGERA GOLD PROJECT Key Scoping Study Takeaways rsonal use only A Viable, Low-Capex Standalone Gold Operation: The November 2026 Scoping Study confirms that a standalone open-pit mining and on-site heap leach operation at the 100%-owned Bulgera Gold Project (M52/1085) is techni

  6. Slide 6: Modest Capital & Fast Payback

    Slide 6: Modest Capital & Fast Payback

    NORWEST MINERALS LTD BULGERA GOLD PROJECT Modest Capital & Fast Payback rsonal use only Low Upfront Capital Intensity: Pre-production capital is estimated at just A$54 million (including A$3M contingency, with a ~A$62M maximum cash drawdown), followed by A$6 million in staged sustaining and expansio

  7. Slide 7: De-Risked Mine Plan & Resource Confidence

    Slide 7: De-Risked Mine Plan & Resource Confidence

    NORWEST MINERALS LTD BULGERA GOLD PROJECT De-Risked Mine Plan & Resource Confidence Conservative Pit Engineering: rsonal use only Rather than designing pits at spot prices, our 1 July 2026 MRE (8.7 Mt at 0.68 g/t Au for 191 koz) was constrained within a A$5,000/oz shell, and our Scoping Study pits w

  8. Slide 8: Proven Metallurgy & Simple Flowsheet

    Slide 8: Proven Metallurgy & Simple Flowsheet

    NORWEST MINERALS LTD BULGERA GOLD PROJECT Proven Metallurgy & Simple Flowsheet rsonal use only Clean, Free-Milling Oxide Feed: The study focuses exclusively on Highly Weathered (63%) and Moderately Weathered (37%) oxide material, leaving deeper fresh rock (51 koz) out of the base case as future upsi

  9. Slide 9: Straightforward Permitting & Native Title Engagement

    Slide 9: Straightforward Permitting & Native Title Engagement

    NORWEST MINERALS LTD BULGERA GOLD PROJECT Straightforward Permitting & Native Title Engagement rsonal use only Brownfields Footprint: Co-locating pits, waste landforms, and the heap leach pad within historically disturbed 1980s–2000s mining areas keeps total clearing to ~200 ha. Clean Environmental

  10. Slide 10: 2027 Pre-Feasibility Study & Growth Upside

    Slide 10: 2027 Pre-Feasibility Study & Growth Upside

    NORWEST MINERALS LTD BULGERA GOLD PROJECT 2027 Pre-Feasibility Study & Growth Upside rsonal use only Clear 12-Month PFS Roadmap: Subject to funding, our Pre-Feasibility Study proposes to run from January to December 2027 to de-risk engineering, geotechnical, hydrogeological, geochemical, and heritag

  11. Slide 11: Company Overview

    Slide 11: Company Overview

    NORWEST MINERALS LTD COMPANY OVERVIEW EXPLORING & DEVELOPING WA RESOURCES Significant upside potential on current market capitalisation rsonal use only CORPORATE SNAPSHOT ASX Code NWM ARUNTA WEST Shares on issue 1351.9 million BALI BULGERA MARYMIA EAST Options on issue - listed 500.9 million MARRIOT

  12. Slide 12: Contact

    Slide 12: Contact

    rsonal use only CONTACT Norwest Minerals Charles Schaus 8 St Georges Terrace charles@norwestminerals.com.au Perth, WA Australia, 6000 www.norwestminerals.com.au