TomaGold Corporation Class A · TSXV:LOT
TomaGold Corporation Class A — Investor Presentation (October 2018)
18 slides from TomaGold Corporation Class A's investor presentation, October 2018

Slide 1: October 2018 Investor Presentation
TSXV: LOT October 2018 Investor Presentation w w w. t o m a g o l d c o r p . c o m

Slide 2: Disclaimer
DISCLAIMER This presentation contains certain “forward-looking statements”, including, but not limited to, statements regarding the Company’s strategic plans, timetables, the evolution of mineral reserves and resources, mine operating costs, capital expenditures, work programs, development plans, ex

Slide 3: Diversified Gold Company
DIVERSIFIED GOLD COMPANY - Monster Lake JV with IAMGOLD Canadian Gold - 100%-owned Obalski gold project Explorer - Sidace Lake JV with Goldcorp - Baird JV with Goldcorp and New Gold. - IAMGOLD owns 19.9% of TomaGold Solid Team and - Other investors include Quebec funds Stakeholders - Experienced lea

Slide 4: Dominant Land Position at Monster Lake
DOMINANT LAND POSITION AT MONSTER LAKE TSXV: LOT 4

Slide 5: Dominant Land Position at Monster Lake
DOMINANT LAND POSITION AT MONSTER LAKE Monster Lake (JV IAMGOLD) 45% TomaGold Winchester (JV IAMGOLD) 50% TomaGold Lac à l’eau jaune (JV IAMGOLD) 50% TomaGold Monster Lake East (Little Monster, Cookie Monster and Monster Island sectors) 100% TomaGold Monster Lake West 100% TomaGold Hazeur 70% TomaGo

Slide 6: Monster Lake Project
MONSTER LAKE PROJECT JOINT VENTURE WITH IAMGOLD • IAMGOLD (50%) TomaGold (45%) JV. Main terms of JV agreement • Over 81,684 metres of drilling completed. • IAMGOLD must incur $10 million in • 114 claims covering 3,336 hectares located exploration work over 7 years to earn near the Chibougamau mining

Slide 7: Monster Lake NI 43-101 Resource Estimate
MONSTER LAKE NI 43-101 Resource Estimate On March 28, 2018, IAMGOLD announced the results of its first mineral resource estimate: Classification Tonnage Gold Grade Contained Ounces (g/t Au) (Au) Inferred 1,109,700 12.14 433,300 • Mineral resources are reported at a cut-off grade of 3.5 g/t Au, using

Slide 8: Monster Drilling Results
MONSTER DRILLING RESULTS Published June 14, 2018 MAIN HIGHLIGHTS • Intersected second gold zone along the Monster Lake Shear Zone in an area located 200 to 400 metres to the north of the 325-Megane Zone and the Lower Shear Zone Parallel to the main zone. 325-Megane Zone and Main Shear Zone: • Drill

Slide 9: Obalski Project
OBALSKI PROJECT Past gold-copper producing property • TomaGold acquired 100% interest for 4 million shares and cash payments totaling $500,000 over four years, including $100,000 at closing. • Property includes one mining concession and hosts seven separate mineralized zones, oneM 85-metre shaft and

Slide 10: Obalski Project
OBALSKI PROJECT Past gold-producing property • Latest results from hole OB-17-02, drilled about 125 metres east of the old Zone A underground workings, intersected semi-massive sulphides grading: 15.0 g/t Au, 46.8 g/t Ag and 10.4% Cu over 2.0 metres, including 21.3 g/t Au, 52.3 g/t Ag and 8.6% Cu ov

Slide 11: Sidace Lake Project
SIDACE LAKE PROJECT JV WITH GOLDCORP TOMAGOLD CORPORATION • Advanced gold project located in the Red Lake mining camp, in Ontario. • Acquired a 39.5% interest in the Sidace Lake project for 15 million shares. • Goldcorp holds a 60.5% interest under the terms of a JV. • NI 43-101 Indicated and Inferr

Slide 12: Sidace Lake Project
SIDACE LAKE PROJECT • Sidace Lake NI 43-101 mineral resource estimate using a 1.5 g/t Au cut-off grade and a 35 g/t Au high grade cap, based on a gold price of US$800/oz and a US$:C$ exchange rate of 1:1.2 Zone Tonnes g/t Au Total oz Au MDZ Indicated Resource 1,119,500 3.00 107,900 Inferred Resource

Slide 13: Baird Property
BAIRD PROPERTY JV WITH GOLDCORP AND NEW GOLD • TomaGold holds a 24.5% interest in the property, with New Gold holding a 24.5% interest and Goldcorp (operator), owning the remaining 51% interest. • The Baird property lies in the central Red Lake gold belt six kilometres north of the Madsen Mine and f

Slide 14: Next Steps
NEXT STEPS Monster Lake • IAMGOLD is planning a winter drilling program. Monster Lake East • A 3,500-metre drilling campaign is recommended. Hazeur • A 7,500-metre drilling campaign is recommended. Obalski • A 5,000-metre drilling campaign is recommended to delineate a certain tonnage under zone A,

Slide 15: Capital Structure
CAPITAL STUCTURE Shares outstanding 139.6 million Options 11.0 million (average exercise price: $0.12) Warrants nil Shares fully diluted 150.6 million Share price $CA 0.055 (as of September 30, 2018) High - low $CA 0.085 - $CA 0.045 (52 weeks) Market capitalization $CA 7.7 million 55% (Asia, Europe

Slide 16: Senior Management Team / Board of Directors
SENIOR MANAGEMENT TEAM / BOARD OF DIRECTORS David Grondin, President, CEO and Director Robert Desjardins, Adm. A, Director David Grondin has worked in the financial and mining sectors for over 20 years. He Mr. Desjardins is a member of the Corporation des Administrateurs agréés du has been President

Slide 17: Strong Technical Advisory Board
STRONG TECHNICAL ADVISORY BOARD Alain Bureau, B.Eng. Mr. Bureau has Canadian Armed Forces officer training and an engineering degree from the Royal Military College of Canada. He has worked in the mining and construction industry in Canada and Latin America for over 20 years. He was involved in size

Slide 18: TomaGold Corporation
T O M A G O L D C O R P O R AT I O N T S XV: LO T DAVID GRONDIN, PRESIDENT & CEO david.grondin@tomagoldcorp.com +1 (514) 583-3490
Source: Internet Archive copy of tomagoldcorp.com
More decks from TomaGold Corporation Class A
Investor Presentation (October 2026)27 slides · October 2026
Investor Presentation (September 2026)27 slides · September 2026
Investor Presentation (July 2026)26 slides · July 2026
Investor Presentation (May 2026)25 slides · May 2026
Investor Presentation (April 2026)25 slides · April 2026
Investor Presentation (March 2026)25 slides · March 2026