Carnarvon Energy Limited · ASX:CVN

Carnarvon Energy — Investor Presentation (May 2023)

20 slides from Carnarvon Energy's investor presentation, May 11, 2023

  1. Slide 1: Corporate Presentation May 2023

    For personal use only MAY 2023 CORPORATE PRESENTATION carnarvon.com.au

  2. Slide 2: Overview of CVN's Partial Divestment of Bedout Basin

    OVERVIEW OF CVN’S PARTIAL DIVESTMENT OF BEDOUT BASIN* For personal use only 1 10% INTEREST ▪ 10% in Dorado Production Licence ▪ 10% in Pavo and Roc fields DIVESTED ▪ 10% in all four Exploration Permits 2 US$146M IN CONSIDERATION ▪ US$56 million is payable on Completion plus working capital adjustmen

  3. Slide 3: Impact of the CPC Transaction

    IMPACT OF THE CPC TRANSACTION For personal use only 700 EXPLORATION 6 UPSIDE 600 ADDITIONAL 5 10% IN PAVO ETC 500 4 COMPLETION PAYMENT & $Am 400 CARRY LOOK- THROUGH Liquidity after transaction completion 300 3 CARRY Current market capitalisation BENEFIT 200 TO CVN 2 COMPLETION PAYMENT 100 1 CASH 0

  4. Slide 4: Bedout Basin Investment Case

    BEDOUT BASIN INVESTMENT CASE For personal use only 1 WORLD CLASS ASSET ▪ Dorado is a high-quality shallow water development project with scale and projected low per barrel costs ▪ Existing discovered tie-back opportunities in Pavo and Roc fields ▪ Dorado contains light and sweet crude, condensate, l

  5. Slide 5: Dorado Development – Phase 1

    DORADO DEVELOPMENT – PHASE 1 For personal use only THE FIELD IS EXPECTED TO PRODUCE AT AN INITIAL 75,000 TO 100,000 BOPD (gross) OIL PRODUCTION FLOWLINE GAS INJECTION FLOWLINE UMBILICAL LINE 5

  6. Slide 6: Dorado Approvals – Phase 1

    DORADO APPROVALS - PHASE 1 For personal use only ALL OF THE PRIMARY PROJECT APPROVALS HAVE BEEN SECURED APPROVAL REQUIRED AGENCY STATUS Location Declaration National Offshore Petroleum Titles APPROVED Administrator (NOPTA) 10 September 2020 Production Licence NOPTA GRANTED 7 April 2022 Offshore Proj

  7. Slide 7: CVN Positioned to Fund Dorado

    CVN POSITIONED TO FUND DORADO For personal use only CARNARVON HAS BEEN DISCIPLINED IN EXECUTING ITS FUNDING PLANS FOR DORADO US$90 million project funding carry* Senior debt process commenced in 2022 – strong interest A$178 million in cash* * Post completion of the CPC divestment announced on 22 Feb

  8. Slide 8: Pavo Discovery in 2022

    PAVO DISCOVERY IN 2022 For personal use only THE LARGEST LIQUIDS DISCOVERY IN AUSTRALIA SINCE DORADO AT 43 MMBBLS (2C gross basis) • Discovered March 2022 in 88m of water • Pavo South resource potential of 66 MMbbl (100% basis, mean) has a 64% chance of success • Light sweet oil (~52⁰ API) with low

  9. Slide 9: Pavo Development into Dorado

    PAVO DEVELOPMENT INTO DORADO For personal use only THE PROPOSED PLAN IS TO PRODUCE PAVO LIQUIDS THROUGH THE DORADO FACILITIES • Pavo-1 oil discovery is ~46km east of Dorado • Excellent potential to extend plateau rate within simple tie-back range to proposed through Dorado facilities and maintain lo

  10. Slide 10: Pavo Production Timing Ideal

    PAVO PRODUCTION TIMING IDEAL For personal use only BENEFITS IN BEING ABLE TO TIME PAVO PRODUCTION TO OFFSET DORADO NATURAL FIELD DECLINES Fluid production rates from Dorado are naturally expected to decline after a plateau period of 1-2 years. Once this begins to occur, there will be spare capacity

  11. Slide 11: Significant Exploration Upside

    SIGNIFICANT EXPLORATION UPSIDE For personal use only Ara: McKean: ~600 BSCF gas and 100 MMBBLS ~100 MMBBLS oil and 165 BSCF gas condensate Yuma: Starbuck: ~425 BSCF gas and 70 MMBBLS ~60 MMBBLS oil and condensate 10 BSCF gas Pavo Wallace: Pavo South: ~200 BSCF gas and 10 MMBBLS ~66 MMBBLS oil and co

  12. Slide 12: Upcoming Catalysts

    UPCOMING CATALYSTS For personal use only 1 CPC COMPLETION ▪ CVN focus on completing conditions, with good progress made to date ▪ Partners supportive of the transaction ▪ Completion target remains end June 2023 2 FEED START & ▪ Work has been progressing around integrating the Pavo field into Dorado

  13. Slide 13: Investment Proposition

    INVESTMENT PROPOSITION For personal use only 10% IN DORADO FIELD WITH 1 75K TO 100K BOPD PRODUCTION (GROSS) 2 US$90M IN DORADO PROJECT US$90M IN DORADO PROJECT FUNDING FUNDING CARRY* CARRY* 3 DEBT INTENDED TO COVER Pavo US$146M IN DORADO FUNDING BALANCE CONSIDERATION Dorado 20% IN 43MMBBL PAVO FIELD

  14. Slide 14: Contingent & Prospective Resource Estimates

    For personal use only CONTINGENT & PROSPECTIVE RESOURCE ESTIMATES Appendix 1 14

  15. Slide 15: Bedout Basin Assets & Equity Interests

    BEDOUT BASIN ASSETS & EQUITY INTERESTS For personal use only SALE ASSETS Carnarvon’s Bedout assets consist of the WA-64-L Production Licence (containing the Dorado field), and the WA-435-P, WA-436-P, WA-437-P and WA-438-P Exploration Permits. Carnarvon’s equity in the Bedout permits at the current t

  16. Slide 16: Bedout Basin Contingent Resources

    BEDOUT BASIN CONTINGENT RESOURCES For personal use only Gross basis Oil and Condensate Natural Gas Barrels of Oil Equivalent MMbbl BCF MMboe 1C 2C 3C 1C 2C 3C 1C 2C 3C Dorado 86 162 285 367 748 1358 176 344 614 Pavo North 26 43 62 6 11 17 27 45 65 Roc 12 20 35 205 332 580 48 78 137 Bedout Project Su

  17. Slide 17: Bedout Basin Prospective Resources (Gross)

    BEDOUT BASIN PROSPECTIVE RESOURCES PROSPECTIVE RESOURCES GROSS FIELD BASIS For personal use only Liquids Natural Gas Barrels of Oil Equivalent Probability of Risked Carnarvon (Oil and Condensate; MMBBL) (BSCF) (BOE) Geological Mean Energy Success (Pg) (MMBOE) Equity pre Permit divestment Prospect P9

  18. Slide 18: Bedout Basin Prospective Resources (Net CVN)

    BEDOUT BASIN PROSPECTIVE RESOURCES PROSPECTIVE RESOURCES NET CVN BASIS For personal use only Liquids Natural Gas Barrels of Oil Equivalent Probability of Risked Carnarvon (Oil and Condensate; MMBBL) (BSCF) (BOE) Geological Mean Energy Success (Pg) (MMBOE) Equity pre Permit divestment Prospect P90 P5

  19. Slide 19: Disclaimer

    DISCLAIMER For personal use only The resource estimates outlined in this presentation are based on and fairly represent information and supporting documentation prepared by Carnarvon’s Chief Operating Officer, Mr Philip Huizenga, who is a full-time employee of the company. Mr Huizenga has over 25 ye

  20. Slide 20: Carnarvon Energy Ltd contact details

    << CARNARVON ENERGY LTD @ Level 2 76 Kings Park Road admin@cvn.com.au West Perth WA 6005 R. +618 9321 2665 @® wwwecarnarvon.com.au