Slide 1: ASX Announcement: Presentation to Resources Rising Stars Investor Conference
ASX ANNOUNCEMENT 7 June 2022 PRESENTATION TO RESOURCES RISING STARS INVESTOR CONFERENCE-7 JUNE 2022 “Paving the Way to a Greener Future” Greenvale Mining Limited (ASX: GRV) advises that Chief Executive Officer, Matt Healy, will be presenting to the Resources Rising Stars Investor Conference being he
Slide 2: Paving the way for a greener future
ASX: GRV Paving the way for a greener future Resource Rising Stars Investor Conference June 2022
Slide 3: Important Information
Important Information DISCLAIMER FORWARD-LOOKING STATEMENTS This document and all other information (whether in writing or otherwise) which may be made This presentation contains forward looking statements. Forward looking statements are often, but not available, or part thereof does not: always, id
Slide 4: Corporate Summary
Corporate Summary SHAREHOLDER SNAPSHOT CAPITAL STRUCTURE Board & Management Shares M 397 24% Options M - Share price (27 May 2022) A$ $0.175 Market Capitalisation (27 May 2022) A$ $69.5m Cash A$ $5.1m Top 20 Shareholders % 48% Other 76% SHARE PRICE 0.5 4 0.45 3.5 0.4 3 Volume Millions 0.35 Price AU$
Slide 5: On the Road to Success: Alpha Torbanite Project (QLD)
ON THE ROAD TO SUCCESS ALPHA TORBANITE PROJECT (QLD) © Copyright Greenvale Mining Ltd 2022 4
Slide 6: Alpha Torbanite Project
Alpha Torbanite Project ON THE ROAD TO SUCCESS AT ALPHA ● Located in central QLD, 500km west of Rockhampton ● Discovered in 1939 ● An organic-rich sedimentary rock formed in a lacustrine (lake) environment ● Alpha torbanite is exceptionally high-grade, containing up to 698 litres of hydrocarbons per
Slide 7: Alpha Torbanite Project
Alpha Torbanite Project ON THE ROAD TO SUCCESS AT ALPHA ● Located in central QLD, 500km west of Rockhampton ● Discovered in 1939 ● An organic-rich sedimentary rock formed in a lacustrine (lake) environment ● Alpha torbanite is exceptionally high-grade, containing up to 698 litres of hydrocarbons per
Slide 8: Alpha Torbanite Project: JORC Mineral Resource Estimate
Alpha Torbanite Project JORC MINERAL RESOURCE ESTIMATE ● Maiden Inferred JORC Resource Estimate of 18.6Mt of Torbanite and Cannel Coal at a yield of 179 litres per tonne at zero moisture (LTOM) for 21.29 million barrels of synthetic oil equivalent Mineral Resource Estimate figures from ASX release 1
Slide 9: Alpha Torbanite Project: Project Development
Alpha Torbanite Project PROJECT DEVELOPMENT ● Commencement of Parr Reactor testwork on Alpha torbanite and cannel coal ● Parr Reactor heats crushed material slowly under low pressure, with an objective to maximise production of compounds that make up bitumen ● The first round of testing has commence
Slide 10: Alpha Torbanite Project: Bitumen Products and Road to Commercialisation
Alpha Torbanite Project Australia’s Bitumen Consumption Forecast (Mt) 1.6 1.4 1.2 1.0 BITUMEN PRODUCTS 0.8 ● Steady increase in bitumen FOB pricing globally. 0.6 0.4 0.2 ● Rising oil price set to increase prices of petrochemical products (including 0.0 2020 2021 2022 2023 2024 2025 bitumen). Consump
Slide 11: Untapped Shallow Potential: Geothermal Energy Assets (QLD)
UNTAPPED SHALLOW POTENTIAL GEOTHERMAL ENERGY ASSETS (QLD) © Copyright Greenvale Mining Ltd 2022 10
Slide 12: What Is Geothermal Energy?
Geothermal WHAT IS GEOTHERMAL ENERGY? ● Direct use (hot springs, pools etc) or electricity generation ● Requires three elements - fluid, heat and permeability ● High-temp systems flash hot water, or use steam directly ● Binary Cycle Power Plants enable energy production from lower to medium temperat
Slide 13: The Binary Cycle Plant Opportunity
Geothermal THE BINARY CYCLE PLANT OPPORTUNITY ● Historically, geothermal projects in Australia have focused on high temperature granite reservoirs (above 180°C) which exist only at significant depths (~4km) ● Targeting moderate temperature, optimally 100-120°C ● Shallow systems - lower exploration a
Slide 14: The Binary Cycle Plant Opportunity
Geothermal THE BINARY CYCLE PLANT OPPORTUNITY ● Historically, geothermal projects in Australia have focused on high temperature granite reservoirs (above 180°C) which exist only at significant depths (~4km) ● Targeting moderate temperature, optimally 100-120°C ● Shallow systems - lower exploration a
Slide 15: Acquisition of Within Energy Pty Ltd
Acquisition of Within Energy Pty Ltd “Green energy and the move towards decarbonisation represent an unprecedented growth opportunity in the modern era, and this acquisition puts Greenvale at the forefront of this global transition.” – N. Biddle (Managing Director) ● Prime Locations Significant foot
Slide 16: Unlocking the Georgina Basin's Hidden Potential
UNLOCKING THE GEORGINA BASIN’S HIDDEN POTENTIAL GEORGINA BASIN IOCG PROJECT (NT) © Copyright Greenvale Mining Ltd 2022 15
Slide 17: Georgina Basin IOCG Project: New Mineral Frontier
Georgina Basin IOCG Project NEW MINERAL FRONTIER ● Eight granted tenements ● Five under application ● Total Area 4,522km2 ● World-class greenfields discovery potential ● Substantial investment in exploration work to date ● Iron-Oxide-Copper-Gold deposit prospectivity TISA IOCG Mineral Potential – GA
Slide 18: Georgina Basin IOCG Project: World-Class IOCG Potential
Georgina Basin IOCG Project WORLD-CLASS IOCG POTENTIAL ● IOCGs are typically large, economically attractive deposits ● Account for 35% of domestic copper production* ● Large to giant deposits in Curnamona region of SA and NW Queensland ● Tennant Creek small, high-grade variants ● Dense and rich in i
Slide 19: Georgina Basin IOCG Project: Diamond Drilling
Georgina Basin IOCG Project DIAMOND DRILLING ● Diamond drilling has commenced on prospective Banks-Leichhardt prospects ● Coincident magnetic and gravity anomalies – consistent with IOCG mineralisation ● Award of NTGS Exploration Grant co-funding for Leichhardt East © Copyright Greenvale Mining Ltd
Slide 20: Disposition of Georgina Basin IOCG Project
Disposition of Georgina Basin IOCG Project “This transaction enables Greenvale to focus its resources on the development of the Alpha Project and the newly acquired geothermal energy assets, while still enabling shareholders to benefit from future exploration upside at Georgina.” – N. Biddle (Managi
Slide 21: Summary
Summary ● Vision that the Alpha Torbanite Project become Australia’s sole domestic source of carbon-offset bitumen products ● Maiden Mineral Resource Estimate complete and project development advancing ● Untapped potential for Binary Cycle geothermal power generation in shallow moderate temperature
Slide 22: Thank You