Impala Platinum Holdings Limited · JSE:IMP
Impala Platinum — FY2022 Earnings Presentation
42 slides from Impala Platinum's earnings presentation, Sep 1, 2022

Slide 1: Annual Results FY2022
ANNUAL RESULTS FY2022 1 September 2022

Slide 2: Forward-Looking and Cautionary Statement
FORWARD-LOOKING AND CAUTIONARY STATEMENT Certain statements contained in this presentation, other than the statements of historical fact, contain forward-looking statements regarding Implats’ operations, economic performance or financial condition, including, without limitation, those concerning the

Slide 3: Agenda
AGENDA 01 Group 02 Operational 03 Financial 04 Market 05 Business overview overview review review outlook Nico Muller Mark Munroe Meroonisha Kerber Sifiso Sibiya Nico Muller Gerhard Potgieter IMPLATS 3 ANNUAL RESULTS FY2022

Slide 4: Group Overview
01 GROUP OVERVIEW Nico Muller IMPLATS ANNUAL RESULTS FY2022

Slide 5: Performance Against Strategic Objectives
PERFORMANCE AGAINST STRATEGIC OBJECTIVES SUSTAINABLE OPERATIONAL ORGANISATIONAL OPTIMAL CAPITAL COMPETITIVE ASSET FUTURE VALUE DEVELOPMENT EXCELLENCE EFFECTIVENESS STRUCTURE PORTFOLIO FOCUSED We aspire to deliver an We generate superior value We place people at the We pursue value creation We seek t

Slide 6: Group Safety and Health Overview
GROUP SAFETY AND HEALTH OVERVIEW Description FY2022 FY2021 14 FATALITIES AND LOST-TIME INJURY FREQUENCY RATE 7 LTIFR** 6.01 6.5 Fatalities No. 7 3 12 6 10 FATALITIES 5.30 5.5 LTIFR pmmhw 4.21 4.92 8 7 4.54 4.92 7 5 TIFR pmmhw 9.76 9.84 4.5 6 5 5 4.21 4 Covid-19 vaccination rate (fully) % 91 26 4 3 3

Slide 7: Environmental
ENVIRONMENTAL CO2 RENEWABLE WATER ENVIRONMENTAL NEUTRALITY ENERGY SECURITY IMPACT 30% reduction by 2030 2 Initiated renewable energy 70% reuse/recycle target Construction of Zimplats smelter and SO2 abatement projects at the Group by 2030 Carbon neutrality by 2050 plant at a cost of 35MW solar proje

Slide 8: Social Projects
SOCIAL PROJECTS HEALTH AND INCLUSIVE INFRASTRUCTURE & EDUCATION WELLBEING PROCUREMENT HOUSING Improved health care services Programmes benefitted Trained and supported Completed 24 community benefitted more than 47 schools and >450 SMMEs infrastructure projects 32 800 people >21 000 learners sustain

Slide 9: Group Operational Performance
GROUP OPERATIONAL PERFORMANCE PRODUCTION* 23 210 Description FY2022 FY2021 Var (%) Tonnes milled (000) 22 363 19 355 19 469 19 576 Tonnes Milled# kt 22 363 23 210 -4% Concentrate production 6E koz 3 171 3 292 -4% Managed operations 6E koz 2 271 2 373 -4% FY2018 FY2019 FY2020 FY2021 FY2022 Impala 6E

Slide 10: Group Operational Performance: Production Movement and Challenges
GROUP OPERATIONAL PERFORMANCE PRODUCTION* GROUP MOVEMENT IN CONCENTRATE PRODUCTION – FY2022 VS FY2021 3 271 3 074 3 087 2 925 1 174 246 249 351 589 302 259 koz 6E in concentrate koz 2 813 -9% -6% -5% -2% 0% 1% 12% % variance from FY2021 3 292 118 6E koz in concentrate UNIT COST** 17 364 14 840 13 34

Slide 11: Group Metal Price Performance
GROUP METAL PRICE PERFORMANCE IMPALA BASKET PRICE PLATINUM PRICE Description FY2022 FY2021 Var (%) 60 000 4 000 1 400 3 500 1 200 50 000 Platinum (US$/oz) 1 008 1 043 -3% 3 000 US$/6E oz 1 000 R/6E oz US$/oz 40 000 2 500 800 2 000 30 000 600 Palladium (US$/oz) 2 211 2 419 -9% 1 500 20 000 1 000 400

Slide 12: Group Business Overview
GROUP BUSINESS OVERVIEW 6E OUNCES SOLD Description FY2022 FY2021 Var (%) 3 274 3 147 3 049 2 709 2 793 koz 6E ounces sold koz 3 147 3 274 -4% Revenue per 6E ounce sold R/oz 37 703 39 478 -4% FY2018 FY2019 FY2020 FY2021 FY2022 REVENUE Revenue Rm 118 332 129 575 -9% 129 575 118 332 Cost of sales Rm (7

Slide 13: Mineral Resources and Mineral Reserves
MINERAL RESOURCES AND MINERAL RESERVES Attributable Group Mineral Resources decreased 3.1% ATTRIBUTABLE MINERAL RESERVES BY ASSET MINERAL RESERVES by 8.7 million 6E ounces to 268.6 million ounces: Pt Pd Rh OPGMs • Expired prospecting right at Afplats 6% 5% 25 000 9% 20 000 2 000 Reserves, koz 6E 39%

Slide 14: RBPlat Acquisition
RBPLAT ACQUISITION Mandatory offer to all RBPlat shareholders comprised of R90 cash and 0.3 Implats scrip Comp Com Offer initiated RBPlat Board DTIC agreement Current holding* Closing date recommendation (Nov 2021) (Feb 2022) (Aug 2022) (38.86%) (Sep 2022)** (Apr 2022) COMPELLING OFFER WITH SIGNIFIC

Slide 15: Major Projects Update
MAJOR PROJECTS UPDATE TWO RIVERS GROWTH ZIMPLATS GROWTH SMELTING REFINING New Merensky Expanded Bimha and Mupani New furnace and Increased base metal mine and plant mine and plant SO2 abatement plant capacity at Impala Refineries and Zimplats +180koz 6E from FY2025 +80koz 6E from FY2024 +600koz 6E c

Slide 16: Operations Review
02 OPERATIONS REVIEW Mark Munroe IMPLATS ANNUAL RESULTS FY2022

Slide 17: Impala
17 IMPALA PRODUCTION* 1 298 1 312 Description FY2022 FY2021 Var (%) Remarks 1 263 1 198 koz 1 115 • Extended safety stoppages, industrial action, power instability Tonnes milled kt 9 801 10 686 -8% and interruptions, community disruptions, cable theft • Impacted by changes in ore mix – production lo

Slide 18: Impala 6E Ounces Stock-Adjusted vs FY2021
6E OUNCES STOCK-ADJUSTED VS FY2021 1350 4 2 4 5 8 5 13 Contractor industrial action, DMR Cable theft Ramp up Additional surface material 1300 13 Industrial action, Eskom, cable theft 14 Closed shaft 21 DMR, industrial action, fire incident DMR, Eskom, cable theft, rope change 1250 25 DMR 28 6E koz I

Slide 19: Operations Review
02 OPERATIONS REVIEW Gerhard Potgieter IMPLATS ANNUAL RESULTS FY2022

Slide 20: Marula
MARULA PRODUCTION* 259 224 231 Description FY2022 FY2021 Var (%) Remarks 217 210 koz Tonnes milled kt 1 995 1 802 11% • Operational continuity and improved quality of mining delivery • Higher centares and increased sweepings, improved 6E head grade g/t 4.53 4.37 4% stoping:development ratio COST** 1

Slide 21: Two Rivers
TWO RIVERS PRODUCTION* 348 313 300 302 Description FY2022 FY2021 Var (%) Remarks 261 koz • Higher due to the new plant expansion. Previous year impacted Tonnes milled kt 3 458 3 283 5% by Covid-19 • Milling lower grade stockpiles, safety stoppages impacted 6E head grade g/t 3.22 3.43 -6% mining prod

Slide 22: Zimplats
22 ZIMPLATS PRODUCTION* 583 Description FY2022 FY2021 Var (%) Remarks 580 580 579 koz 578 Tonnes milled kt 6 882 6 821 1% • Stable milled volumes at installed capacity • Impact of lower grade ore stockpile milled during maintenance 6E head grade g/t 3.42 3.44 -1% contractor changeover at Mupfuti COS

Slide 23: Mimosa
MIMOSA PRODUCTION* 266 Description FY2022 FY2021 Var (%) Remarks 261 261 248 koz 246 Tonnes milled kt 2 816 2 861 -2% • Increase in power outages experienced in the year 6E head grade g/t 3.82 3.87 -1% COST** 915 832 • Recoveries impacted by reagent availability and quality; poor 771 768 716 6E in c

Slide 24: Impala Canada
IMPALA CANADA PRODUCTION* 271 280 260 249 Description FY2022 FY2021 Var (%) Remarks 232 koz • Critical skill shortage and supply chain constraints resulted in poor availability of underground fleet, exacerbated by plant Tonnes milled Kt 3 685 3 901 -6% maintenance and an extreme weather event, which

Slide 25: IRS
IRS MINE-TO-MARKET RECEIPTS 1 412 Description FY2022 FY2021 Var (%) Remarks 1 392 1 354 1 379 koz 1 214 Receipts 6Ekoz 1 763 1 737 2% Mine-to-market 6Ekoz 1 412 1 379 2% • Increased deliveries from Zimplats and Marula THIRD PARTY RECEIPTS • Lower receipts as third parties faced operational challenge

Slide 26: Financial Review
03 FINANCIAL REVIEW Meroonisha Kerber IMPLATS ANNUAL RESULTS FY2022

Slide 27: Income Statement
INCOME STATEMENT VARIANCE R MILLION FY2022 FY2021 • Revenue decreased by R11.2 billion to R118.3 billion (%) • 5% decrease due to lower sales volumes -R6.6 billion Revenue 118 332 129 575 -9% • 3% decline because of lower dollar metal prices -R3.6 billion • Relatively flat exchange rate achieved -R0

Slide 28: Stock Adjusted Unit Costs
STOCK ADJUSTED UNIT COSTS • Stock adjusted unit costs increased by 17% to R17 364 17 364 235 per 6E ounce – within the guidance provided to the market 164 290 121 • Overall Implats mining inflation of 8.3% 733 • Inflation for SA operations +8.9% • Zimplats US$ inflation +5.4% • Impala Canada C$ infl

Slide 29: Cash Flow and Net Cash Position
2 9 CASH FLOW AND NET CASH POSITION FREE CASH FLOW • Cash generated from operations remained elevated at R34.9 billion for the year 38 304 • Capital expenditure of R9.0 billion was 43% higher due to: 28 840 Rm • Accelerated project spend at Zimplats • Capital spend at Impala in the prior year impact

Slide 30: Capital Allocation
CAPITAL ALLOCATION CASH FROM OPERATIONS OF R46.0bn BALANCE SHEET STRENGTH OTHER NET INCOME R2.8bn inflow • Future rehabilitation obligations (R0.3 billion) R4.5bn • Cash retained (R4.2 billion) INTEREST PAID R0.4bn outflow 15% TAXES PAID R10.6bn outflow RETURNS TO SHAREHOLDERS CAPEX R9.0bn outflow 4

Slide 31: Market Review
04 MARKET REVIEW Sifiso Sibiya IMPLATS ANNUAL RESULTS FY2022

Slide 32: PGM Revenue Baskets FY2022
PGM REVENUE BASKETS FY2022 REVENUE CONTRIBUTION BY METAL 3% 8% 6% 16% 7% 9% -10% 23% 0% 19% 23% -18% 4% 1% 2% TWO IMPALA MARULA RIVERS IMPLATS Revenue of Revenue of 35% Revenue of 29% Revenue of 45% R43.6bn R8.4bn R9.4bn 38% R118.3bn 23% 31% 52% 58% 10% 7% 8% 3% 10% 21% -4% 21% -7% 20% -8% 4% 13% IM

Slide 33: Supply and Demand Balances
SUPPLY AND DEMAND BALANCES SUPPLY/DEMAND BALANCES* 2022 PLATINUM MARKET to remain in surplus 1 200 - Demand expected to decrease by 2% • Automotive production recovery on easing chip shortages 1 000 • Stable jewellery demand as Zero-Covid policy in China policy offsets good growth elsewhere • Indust

Slide 34: PGM Market Outlook
PGM MARKET OUTLOOK PRIMARY AND UNCERTAIN PLATINUM PRICING PALLADIUM AND GLOBAL MARKET SECONDARY MACRO OUTLOOK RHODIUM DEMAND TRENDS SUPPLY Pt Pd Rh Operational Zero-covid policy in Near-term platinum Robust medium- Continually assess impact headwinds China continues to pricing dictated by term deman

Slide 35: Business Outlook
05 BUSINESS OUTLOOK Nico Muller IMPLATS ANNUAL RESULTS FY2022

Slide 36: Group Outlook
GROUP OUTLOOK ACTUAL GUIDANCE BUSINESS AREA UNIT FY2022 FY2023 REFINED PRODUCTION: 3 087 3 000 – 3 150 Group 6E oz refined CONCENTRATE PRODUCTION: 6E oz (in conc) 3 171 3 100 – 3 300 Impala 6E oz (in conc) 1 174 1 175 – 1 275 Zimplats 6E oz (in conc) 589 620 – 650 Two Rivers 6E oz (in conc) 302 300

Slide 37: Annual Results FY2022
ANNUAL RESULTS FY2022 1 September 2022

Slide 38: Major Projects – Refineries
MAJOR PROJECTS – REFINERIES NEW FINAL METALS BMR DEBOTTLENECKING R1 305m Capital Budget R496m Capital Budget Erection of a new final metals building to house new processing equipment, Debottlenecking of identified sections in BMR to expand matte treatment capacity by circa replacing the aging buildi

Slide 39: Major Projects – Eastern Limb
MAJOR PROJECTS – EASTERN LIMB TWO RIVERS MERENSKY MARULA PHASE II R5.7bn approved in February 2021 R5.1bn approved in Nov 2021 Develop a Merensky mine and concentrator, expanding production by 180koz 6E/a Replace depletion of Marula LoM I and expand concentrator plant from 2.04 to 2.40 Mtpa Actual/

Slide 40: Major Projects - Zimplats
MAJOR PROJECTS - ZIMPLATS MINES REPLACEMENTS: MUPANI MINES REPLACEMENTS: BIMHA Mine development and upgrade - US$386m Mine upgrade - US$82m Development of Mupani Mine to replace Ngwarati, Rukodzi and Mupfuti Mines on Upgrade of Bimha Mine to replace Mupfuti Mine on depletion. Vote approved by Board

Slide 41: Major Projects - Zimplats
MAJOR PROJECTS - ZIMPLATS THIRD CONCENTRATOR PLAN SMELTER EXPANSION AND SO2 ABATEMENT Capital vote - US$104m Capital vote – US$521m 0.9Mtpa growth from current Phase 2 capacity of 6.7Mtpa to Phase 3A 7.6Mtpa. Expansion of the existing smelter to process concentrate throughput of 380ktpa, Vote approv

Slide 42: Production and Capital Outlook
PRODUCTION AND CAPITAL OUTLOOK MINE-TO-MARKET 6E CONCENTRATE VS GROUP CAPEX 4 000 14 3 500 12 3 000 10 2 500 Rbn 8 6E koz 2 000 6 1 500 4 1 000 2 500 0 0 FY2020 FY2021 FY2022 FY2023 FY2024 FY2025 FY2026 FY2027 Concentrate Capex IMPLATS 42 ANNUAL RESULTS FY2022
Source: company website
More decks from Impala Platinum Holdings Limited
FY2026 Earnings Presentation30 slides · Sep 3, 2026
Technical Presentation (March 2026)34 slides · Mar 25, 2026
H1 FY2026 Earnings Presentation34 slides · Mar 5, 2026
FY2025 Earnings Presentation40 slides · Aug 28, 2025
H1 FY2025 Earnings Presentation40 slides · Feb 27, 2025
Fact Sheet (February 2025)8 slides · February 2025