Industrial Minerals Limited · ASX:IND
Industrial Minerals — Non-Deal Roadshow (June 2022)
15 slides from Industrial Minerals's roadshow presentation, Jun 14, 2022
Slide 1: Diversified Industrial Mineral Developer with a Primary Focus on High Purity Silica Sands
DIVERSIFIED INDUSTRIAL MINERAL DEVELOPER WITH A PRIMARY FOCUS ON HIGH PURITY SILICA SANDS Asia Non-Deal Roadshow - June 2022 ASX: IND
Slide 2: Our Strategy
OUR STRATEGY Industrial Minerals’ high purity silica sand production aspirations are based on producing from several sites that are on predominantly cleared farmland and close to existing road and port infrastructure. The mining plan sees the removal of unwanted deep unfertile sand from paddocks, th
Slide 3: Project Selection – High Purity Silica Sands
QUALITY PROJECT SELECTION – Tier 1 quality HPSS product, >99% SiO2, Low Fe2O3, Ti2O3 & Al2O3, optimum size distribution HIGH PURITY SILICA SANDS LOCATION THEMATIC Private landholders – extraction of sand improves soil & has minimum “Dynamics of High Purity Silica Sands industry are changing fast. en
Slide 4: High Purity Silica Sands Market
HIGH PURITY SILICA SANDS MARKET HIGH PURITY SILICA SANDS
Slide 5: Chinese Market
CHINESE MARKET • Importing of silica sands is increasing • Domestic supply is interrupted due to increasing compliance with higher environmental standards • Shortage in low iron feed stock • Australian exports to China are on the rise • >90 million tonne annual market and ~45 million tonnes used in
Slide 6: Building a Portfolio of High Purity Silica Sands Projects
BUILDING A PORTFOLIO OF HIGH PURITY SILICA SANDS PROJECTS • From 7 HPSS Project when listed, IND has built a portfolio of 14 HPSS projects covering over 3100 km2 • Selection has been directed by the 3 key drivers of Quality, Location and Profitability • Focus is now on systematic exploration and eva
Slide 7: Stockyard Project Update
STOCKYARD PROJECT UPDATE • Located 4km from the Brand Hwy, and 180km by road to the Geraldton port; • Substantial granted tenement package of 477km2 and a further ~97km2 under application; • Private Land Access Agreements in place and Native Title extinguished land; • Mining Lease Application lodged
Slide 8: Stockyard Exploration Target
STOCKYARD EXPLORATION TARGET WARRA-WEST EXPLORATION TARGET • Exploration Target of 8 to 15M tonne of HPSS at a grade ranging between 96% to 99.4% SiO2 • The Exploration Target is based upon auger drilling across the project to date, with the following parameters used in the estimation: • Mineralised
Slide 9: Stockyard Metallurgy
STOCKYARD METALLURGY • Fe2O3 averaging 199ppm and Al2O3 averaging 462ppm for the key sizing ranges; • Key deleterious metals (Fe and Al) screened out in the -150 micron sizing; • Bodes well for a simple mobile processing route producing a high value DSO product with full refining to premium glass sp
Slide 10: Stockyard Project Development
STOCKYARD PROJECT DEVELOPMENT • Mining Lease application lodged June 22 • Significant progress on Scoping Study advancing: • Maiden Mineral Resource Estimate • Updated Metallurgical test work • Logistics study - complete • Desktop and Level 1 Environmental surveys - complete • Mining proposal and mi
Slide 11: 2022 HPSS Exploration Plan
2022 HPSS EXPLORATION PLAN STOCKYARD PROJECT Q2 2022 Q3 2022 Q4 2022 Mining Lease Application Maiden Mineral Resource Trial Mining, Bulk Sample and Trial Shipment Scoping Study Report Project Commencement Decision High Purity Silica Sand Exploration Project Priority • High – Stockyard, Bookara, Waro
Slide 12: Strategic Industrial Minerals Projects
Tabba Tabba STRATEGIC INDUSTRIAL • Strategically located in close proximity to Port Hedland • Existing solar marine salt operations adjacent to exploration licence MINERALS PROJECTS • Favourable weather conditions for solar evaporation • Salt is fundamental for chemical industries, food manufacturin
Slide 13: Corporate Snapshot
CORPORATE SNAPSHOT Non-Executive Chair – Ashley Pattison Total Shares on Issue 63.5M Mr Pattison has over 20 years’ experience in the resources sector from both a corporate finance and operational perspective. A qualified chartered accountant, he has extensive Options on Issue 11.75M experience in o
Slide 14: Have Questions? Get in Touch with Industrial Mineral Ltd
HAVE QUESTIONS? GET IN TOUCH WITH INDUSTRIAL MINERAL LTD Unit 38, 460 Stirling Highway Peppermint Grove, WA, 6011 Australia +61 8 6270 6316 | admin@industmin.com www.industmin.com
Slide 15: Disclaimer / Competent Person Statement
DISCLAIMER This presentation contains summary information about Industrial Minerals Ltd (IND) and is current as of 10 June 2022. The information in this presentation is of a general background and does not purport to be complete. This presentation is not investment or financial product advice (nor t