Industrial Minerals Limited · ASX:IND

Industrial Minerals — Non-Deal Roadshow (June 2022)

15 slides from Industrial Minerals's roadshow presentation, Jun 14, 2022

  1. Slide 1: Diversified Industrial Mineral Developer with a Primary Focus on High Purity Silica Sands

    DIVERSIFIED INDUSTRIAL MINERAL DEVELOPER WITH A PRIMARY FOCUS ON HIGH PURITY SILICA SANDS Asia Non-Deal Roadshow - June 2022 ASX: IND

  2. Slide 2: Our Strategy

    OUR STRATEGY Industrial Minerals’ high purity silica sand production aspirations are based on producing from several sites that are on predominantly cleared farmland and close to existing road and port infrastructure. The mining plan sees the removal of unwanted deep unfertile sand from paddocks, th

  3. Slide 3: Project Selection – High Purity Silica Sands

    QUALITY PROJECT SELECTION – Tier 1 quality HPSS product, >99% SiO2, Low Fe2O3, Ti2O3 & Al2O3, optimum size distribution HIGH PURITY SILICA SANDS LOCATION THEMATIC Private landholders – extraction of sand improves soil & has minimum “Dynamics of High Purity Silica Sands industry are changing fast. en

  4. Slide 4: High Purity Silica Sands Market

    HIGH PURITY SILICA SANDS MARKET HIGH PURITY SILICA SANDS

  5. Slide 5: Chinese Market

    CHINESE MARKET • Importing of silica sands is increasing • Domestic supply is interrupted due to increasing compliance with higher environmental standards • Shortage in low iron feed stock • Australian exports to China are on the rise • >90 million tonne annual market and ~45 million tonnes used in

  6. Slide 6: Building a Portfolio of High Purity Silica Sands Projects

    BUILDING A PORTFOLIO OF HIGH PURITY SILICA SANDS PROJECTS • From 7 HPSS Project when listed, IND has built a portfolio of 14 HPSS projects covering over 3100 km2 • Selection has been directed by the 3 key drivers of Quality, Location and Profitability • Focus is now on systematic exploration and eva

  7. Slide 7: Stockyard Project Update

    STOCKYARD PROJECT UPDATE • Located 4km from the Brand Hwy, and 180km by road to the Geraldton port; • Substantial granted tenement package of 477km2 and a further ~97km2 under application; • Private Land Access Agreements in place and Native Title extinguished land; • Mining Lease Application lodged

  8. Slide 8: Stockyard Exploration Target

    STOCKYARD EXPLORATION TARGET WARRA-WEST EXPLORATION TARGET • Exploration Target of 8 to 15M tonne of HPSS at a grade ranging between 96% to 99.4% SiO2 • The Exploration Target is based upon auger drilling across the project to date, with the following parameters used in the estimation: • Mineralised

  9. Slide 9: Stockyard Metallurgy

    STOCKYARD METALLURGY • Fe2O3 averaging 199ppm and Al2O3 averaging 462ppm for the key sizing ranges; • Key deleterious metals (Fe and Al) screened out in the -150 micron sizing; • Bodes well for a simple mobile processing route producing a high value DSO product with full refining to premium glass sp

  10. Slide 10: Stockyard Project Development

    STOCKYARD PROJECT DEVELOPMENT • Mining Lease application lodged June 22 • Significant progress on Scoping Study advancing: • Maiden Mineral Resource Estimate • Updated Metallurgical test work • Logistics study - complete • Desktop and Level 1 Environmental surveys - complete • Mining proposal and mi

  11. Slide 11: 2022 HPSS Exploration Plan

    2022 HPSS EXPLORATION PLAN STOCKYARD PROJECT Q2 2022 Q3 2022 Q4 2022 Mining Lease Application Maiden Mineral Resource Trial Mining, Bulk Sample and Trial Shipment Scoping Study Report Project Commencement Decision High Purity Silica Sand Exploration Project Priority • High – Stockyard, Bookara, Waro

  12. Slide 12: Strategic Industrial Minerals Projects

    Tabba Tabba STRATEGIC INDUSTRIAL • Strategically located in close proximity to Port Hedland • Existing solar marine salt operations adjacent to exploration licence MINERALS PROJECTS • Favourable weather conditions for solar evaporation • Salt is fundamental for chemical industries, food manufacturin

  13. Slide 13: Corporate Snapshot

    CORPORATE SNAPSHOT Non-Executive Chair – Ashley Pattison Total Shares on Issue 63.5M Mr Pattison has over 20 years’ experience in the resources sector from both a corporate finance and operational perspective. A qualified chartered accountant, he has extensive Options on Issue 11.75M experience in o

  14. Slide 14: Have Questions? Get in Touch with Industrial Mineral Ltd

    HAVE QUESTIONS? GET IN TOUCH WITH INDUSTRIAL MINERAL LTD Unit 38, 460 Stirling Highway Peppermint Grove, WA, 6011 Australia +61 8 6270 6316 | admin@industmin.com www.industmin.com

  15. Slide 15: Disclaimer / Competent Person Statement

    DISCLAIMER This presentation contains summary information about Industrial Minerals Ltd (IND) and is current as of 10 June 2022. The information in this presentation is of a general background and does not purport to be complete. This presentation is not investment or financial product advice (nor t

Industrial Minerals — Non-Deal Roadshow (June 2022) on 6ix