Talisman Metals Plc · LSE:TLM

Talisman Metals — Investor Presentation (May 2026)

16 slides from Talisman Metals's investor presentation, May 2026

  1. Slide 1: Corporate Presentation | May 2026

    Corporate Presentation | May 2026

  2. Slide 2: Disclaimer & Forward-Looking Statements

    DISCLAIMER & FORWARD-LOOKING STATEMENTS This presentation has been prepared by Talisman Metals PLC (“Talisman” or the “Company”) and is being distributed on request of the recipient only. This presentation contains background information about Talisman and its proposed acquisition of Tadeen Internat

  3. Slide 3: Snapshot: Talisman at a Glance

    SNAPSHOT ▪ Talisman at a Glance: Share Table and Ownership Structure ▪ Morocco – a new, premier destination for mineral Issued and Outstanding Shares 64,174,918 exploration and development. New mining code enacted in 2016 opens up country for exploration. Warrants 1,691,428 ▪ Copper – a metal with w

  4. Slide 4: Invest in Morocco

    INVEST IN MOROCCO ▪ Morocco is a strong mining industry and export country, with world-class geological potential. ▪ Strategic Location: Morocco’s proximity to Europe makes it an ideal supplier of critical raw materials for the EU’s energy transition, including renewable infrastructure. ▪ Emerging h

  5. Slide 5: Three Project Areas – Targeting sediment-hosted copper deposits

    PROJECT PORTFOLIO Three Project Areas – Targeting sediment-hosted copper deposits Tizert North/South and Fougnar Project: Sediment-hosted copper within same basin and formation as the Managem Group’s (Managem) Tizert deposit which has a Measured and Indicated Mineral Resource of 76Mt with an average

  6. Slide 6: Tizert North and Fougnar Project

    TIZERT NORTH AND FOUGNAR PROJECT Tizert North + Fougnar represent early-stage options for Managem Tizert deposit type 71km2 of ground on Igherm Inlier, host to the world class Tizert deposit held by Managem, with a Measured and Indicated Mineral Resource of 76Mt with an average grade of 0.8% Cu + 17

  7. Slide 7: Fougnar Focus

    FOUGNAR FOCUS Talisman is targeting copper of the sediment-hosted- copper type, the nearby Tizert deposit owned by Managem is an example of this type The geological formations that host Managem’s Tizert deposit (Basal Series) are present over the full length (8km) of the Fougnar permits, and channel

  8. Slide 8: Fougnar Focus - Stratigraphy

    FOUGNAR FOCUS - STRATIGRAPHY Fougnar Project Multiple copper occurrences present, at geologically anticipated target level in the stratigraphy. This is encouraging based on the Tizert Deposit comparison, where some of the outcropping zones are thin, thickening down dip (see cross-section on next pag

  9. Slide 9: Fougnar and Tizert South Focus – Stratigraphy Targets

    FOUGNAR AND TIZERT SOUTH FOCUS – STRATIGRAPHY TARGETS On Fougnar, mineralisation is in the form of malachite within greenish siltstones as scattered occurrences within two or possibly three stratigraphic levels within the Basal Series which typically has a dip of 15° to 30° to the west. The Basal Se

  10. Slide 10: Tizert North

    TIZERT NORTH Tizert North has potential to host down-dip extensions to the Managem Tizert Deposit The Tizert North project is approximately 8km northeast of the northern limit of Managem’s Tizert Deposit. Talisman is targeting down-dip extensions of the Tizert deposit that may continue onto Talisman

  11. Slide 11: Tirzzit Project

    TIRZZIT PROJECT The Tirzzit Project is geologically classified as a sediment-hosted stratiform Cu-Ag system. Tirzzit consists of two mining licenses covering 16.5km2 and located 225km east of the city of Agadir, Morocco and 85km north-east of Talisman’s Tizert Project. A summary of past exploration

  12. Slide 12: Tirzzit Project – Ready to Explore

    TIRZZIT PROJECT – READY TO EXPLORE Historic data base form strong basis for target selection, immediate field work and resource definition. In addition to past exploration work by Moroccan Government agency BRPM recent work undertaken and reported during 2019-2025 incorporated ASTER remote sensing t

  13. Slide 13: Argana Project

    ARGANA PROJECT Argana Project is targeting copper +/- silver and uranium, of the ‘red-bed’ deposit type, of which there are examples in the area Approximately 58km2 of ground of permits covering Triassic sandstones, approximately 60km northeast of Agadir. Cu is hosted within sandstone lenses, minera

  14. Slide 14: Board of Directors

    BOARD OF DIRECTORS Timothy McCutcheon Jonathan Henry CEO & Director Non-Executive Chair Mr. McCutcheon is a capital markets professional and corporate manager Mr. Henry has over 25 years' experience in the mining industry, successfully with 30 years’ business experience. In 2006 he was a founder of

  15. Slide 15: Technical Team & Advisory Board

    TECHNICAL TEAM & ADVISORY BOARD Fabien Linares - Head Geologist Hsain Baoutoul – Advisor Geologist Mr. Linares is a professional geologist with 20 years of experience and is a Mr. Baoutoul is a geologist and former senior executive at Managem (largest member of the AusIMM with a Master’s Degree in m

  16. Slide 16: Timothy McCutcheon

    Timothy McCutcheon Chief Executive Officer and Director E: t.mccutcheon@talismanmetalsplc.com P: +353 (0) 1 525 6710

Talisman Metals — Investor Presentation (May 2026) on 6ix