Talisman Metals Plc · LSE:TLM
Talisman Metals — Investor Presentation (2025)
17 slides from Talisman Metals's investor presentation, 2025
Slide 1: Corporate Presentation | Q4 2025
Corporate Presentation | Q4 2025 Private & Confidential
Slide 2: Disclaimer & Forward-Looking Statements
DISCLAIMER & FORWARD-LOOKING STATEMENTS This presentation has been prepared by Ovoca Bio PLC (“Ovoca” or the “Company”) and is being distributed on request of the recipient only. This presentation contains background information about Ovoca and its proposed acquisition of Tadeen International Limite
Slide 3: Talisman at a Glance
SNAPSHOT Talisman at a Glance: Anticipated Share Table and Ownership Structure on Admission Morocco – a new, premier destination for mineral Current Sharecount 29,486,269 exploration and development. New mining code in 2015 opens up sector for exploration. Target Acquisition 19,688,652 Copper
Slide 4: Invest in Morocco
INVEST IN MOROCCO Morocco is a strong mining industry and export country, with world-class geological potential. Morocco is a growing global copper producer with multiple new copper mines presently being commissioned. Mining code reform in 2015 made to attract sector investment. Morocco’s GDP
Slide 5: Two Project Areas – Targeting sediment-hosted copper deposits
PROJECT PORTFOLIO Two Project Areas – Targeting sediment-hosted copper deposits Tizert North and Fougnar Project: Sediment-hosted copper within same basin and formation as the Managem Group’s (Managem) Tizert deposit which has a Measured and Indicated Mineral Resource of 76Mt with an average grade o
Slide 6: Tizert North and Fougnar Project – Igherm Inlier
TIZERT NORTH AND FOUGNAR PROJECT Tizert North + Fougnar represent early-stage options for Managem Tizert deposit type 71km2 of ground on Igherm Inlier, host to the world class Tizert deposit held by Managem, with a Measured and Indicated Mineral Resource of 76Mt with an average grade of 0.8% Cu + 17
Slide 7: Fougnar Focus
FOUGNAR FOCUS Talisman is targeting copper of the sediment-hosted-copper type, the nearby Tizert deposit owned by Managem is an example of this type The geological formations that host Managem’s Tizert deposit (Basal Series) are present over the full length (8km) of the Fougnar permits, and channel
Slide 8: Fougnar Focus - Stratigraphy
FOUGNAR FOCUS - STRATIGRAPHY Fougnar Project Multiple copper occurrences present, at geologically anticipated target level in the stratigraphy. This is encouraging based on the Tizert Deposit comparison, where some of the outcropping zones are thin, thickening down dip (see cross-section on next pag
Slide 9: Fougnar and Tizert South Focus – Stratigraphy Targets
FOUGNAR AND TIZERT SOUTH FOCUS – STRATIGRAPHY TARGETS On Fougnar, mineralisation is in the form of malachite within greenish siltstones as Illustration of planned drillholes at Fougnar scattered occurrences within two or possibly three stratigraphic levels within the Basal Series which typically has
Slide 10: Tizert North
TIZERT NORTH Tizert North has potential to host down-dip extensions to the Managem Tizert Deposit The Tizert North project is approximately 8km northeast of the northern limit of Managem’s Tizert Deposit. Talisman is targeting down-dip extensions of the Tizert deposit that may continue onto Talisman
Slide 11: Argana Project
ARGANA PROJECT Argana Project is targeting copper +/- silver and uranium, of the ‘red-bed’ deposit type, of which there are examples in the area Approximately 58km2 of ground of permits covering Triassic sandstones, approximately 60km northeast of Agadir. Cu is hosted within sandstone lenses, minera
Slide 12: Development Plan
DEVELOPMENT PLAN Proposal for the first 24-month period the following outline for field spend is: 2026 H1 PHASE 1 Project Work Details Cost (USD) Transaction completion end- Q4 Fougnar and Tizert South pXRF analyses on soil samples, 400 soil samples on lines spaced 2025. Continue integration of mapp
Slide 13: Board of Directors
BOARD OF DIRECTORS Timothy McCutcheon Jonathan Henry CEO & Director Proposed Non-Executive Chair Mr. McCutcheon is a capital markets professional and corporate manager Mr. Henry has over 25 years' experience in the mining industry, successfully with 30 years’ business experience. In 2006 he was a fo
Slide 14: Advisory Board & Technical Team
ADVISORY BOARD & TECHNICAL TEAM Ian Stalker Neil Herbert Mr. Stalker is a senior mining executive with 50+ years in resource Mr. Herbert is a Fellow of the Association of Chartered Certified Accountants development, raising over US$1.0B in capital during that period. He has led and has over 30 years
Slide 15: Copper Demand
COPPER DEMAND Rapid adoptions of copper-intensive technologies continue to drive high future demand. Expected above average 2.0% annual global refined consumption growth over the next decade. Digital aspects driving demand include IoT, data centres and increasingly energy- intensive AI + Block
Slide 16: Copper Supply
COPPER SUPPLY Current copper mines are expected to provide only half of the copper required to meet global demand over the next 10 years. By 2035, global copper production is estimated to decrease by 15%, leaving a supply gap of 10Mtpa and requiring significant supply investment past 2030. The
Slide 17: Timothy McCutcheon
Timothy McCutcheon Chief Executive Officer and Director E: t.mccutcheon@talismanmetalsplc.com P: +353 (0) 1 525 6710