Rokmaster Resources Corp. · TSXV:RKR

Rokmaster Resources — Investor Presentation (November 2022)

32 slides from Rokmaster Resources's investor presentation, November 2022

  1. Slide 1: Update on the Gold–Polymetallic Revel Ridge Project

    Slide 1: Update on the Gold–Polymetallic Revel Ridge Project

    ROKMASTER RESOURCES CORP. TSX.V: RKR OTCQB: RKMSF FSE: 1RR1 Update on the Gold – Polymetallic REVEL RIDGE PROJECT “B.C’s largest undeveloped high-grade precious & polymetallic deposits” November 2022 J www.rokmaster.com

  2. Slide 2: Cautionary Statement

    Slide 2: Cautionary Statement

    2 Cautionary Statement This presentation contains “forward-looking information” within the meaning of applicable Canadian securities regulations and “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 (collectively, “forward-looking i

  3. Slide 3: The Team

    Slide 3: The Team

    3 The Team John Mirko – President, CEO & Director Michael (“Mike”) Cowin – Chairman & Director Adam Pankratz, MBA, MA – Director Dennis Cojuco – CFO and Corporate Secretary Connor Malek - VP, Exploration Mike Kordysz – VP, Business Development and Strategy Craig Parry – Senior Advisor Mark Rebagliat

  4. Slide 4: Share Structure

    Slide 4: Share Structure

    4 Share Structure Share Information: Trading Symbols: Issued and Outstanding 139,695,023 RKR (TSX.V) Stock Options 11,430,000 RKMSF (OTCQB) Share Purchase Warrants 69,029,720 1RR1 (Frankfurt) Agent Comp. Options/Warrants 5,024,421 Duncan acquisition warrants* 7,200,000 Contact: *Relate solely to the

  5. Slide 5: Revel Ridge Project – 14,715 Ha

    Slide 5: Revel Ridge Project – 14,715 Ha

    5 Revel Ridge Project – 14,715 Ha • 40 km north of Revelstoke with year- round road access • >3 km of operational underground workings • 41,000 m of historic diamond drilling in 315 holes, pre RKR • Mining equipment, underground & surface facilities, 40-person camp, rail load out • Surface drilling

  6. Slide 6: Geology and Mineralization

    Slide 6: Geology and Mineralization

    6 Geology and Mineralization • RRMZ (Main Zone) is a remarkably continuous, large, tabular, structurally controlled, orogenic gold system. • RRMZ averages 6-8 g/t AuEq over 2.5 m True Width • RRYZ (Yellowjacket Zone) stacked subparallel carbonate hosted Ag-Zn-Pb zones. • RRYZ averages 60 g/t Ag + 12

  7. Slide 7: Geology and Mineralization

    Slide 7: Geology and Mineralization

    7 Geology and Mineralization • RRMZ has been drill-tested for 3.5 km, with the deformation zone present in every drillhole • Geological mapping and geochemistry suggests the structure is approximately 6.0 km in strike length

  8. Slide 8: Main Zone (RRMZ) Style Mineralization

    Slide 8: Main Zone (RRMZ) Style Mineralization

    8 Main Zone (RRMZ) Style Mineralization DDH RR20-11: 288.6 m to 294.77 m 288.64 – 290.47 • 1.83 m @ 9.54 g/t Au, 75.66 g/t Ag, 3.81% Pb, 10.91% Zn (17.30 g/t AuEq) 288.64 – 292.56 • 3.92 m @ 5.28 g/t Au, 43.22 g/t Ag, 1.95% Pb, 6.96% Zn (9.97 g/t AuEq) 286.40 – 294.77 • 8.37 m @ 2.76 g/t Au, 23.35 g

  9. Slide 9: Main Zone (RRMZ) Style Mineralization

    Slide 9: Main Zone (RRMZ) Style Mineralization

    9 Main Zone (RRMZ) Style Mineralization ▪ Ag – Zn hosted by deformed marble. ▪ Predictable deformational style, recumbent folds. ▪ Target structural periodicity. ▪ Target million tonne Ag – Zn shapes.

  10. Slide 10: Yellowjacket Ag-Zn Expansion

    Slide 10: Yellowjacket Ag-Zn Expansion

    10 Yellowjacket Ag-Zn Expansion (July 16, 2021 NR) • DDH RR21-41: 1,093 g/t AgEq or 14.39 g/t AuEq over 3.60 m. • DDH RR21-43: 471.9 g/t AgEq or 6.21 g/t AuEq over 7.08 m. • DDH RR21-44: 520.5 g/t Ag or 6.85 g/t Au over 2.70 m. • DDH RR21-47: 426.4 g/t AgEq or 5.61 g/t AuEq over 5.60 m.

  11. Slide 11: Merits Of The Project

    Slide 11: Merits Of The Project

    11 Merits Of The Project Gold Equivalent Mineral Resource Estimate: Main, Hanging Wall, Foot Wall, NW Extension and Yellowjacket Zones: Measured & Indicated (M&I): 6,730,000 t / 1,357,800 ounces AuEq @ 6.27 g/t AuEq * Inferred (Inf): 6,000,000 t / 1,220,400 ounces AuEq @ 6.33 g/t AuEq * • Orogenic R

  12. Slide 12: Resources – November 17, 2021

    Slide 12: Resources – November 17, 2021

    12 Measured, Indicated and Inferred Gold Equivalent Resources – November 17, 2021 *see footnotes 1-6

  13. Slide 13: Footnotes 1-6

    Slide 13: Footnotes 1-6

    13 Footnote 1 - 6 (1) Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, socio- political, marketing, or other relevant issues. (2) The Inferr

  14. Slide 14: 2021 historic PEA Highlights

    Slide 14: 2021 historic PEA Highlights

    14 2021 historic PEA Highlights (using historic resource and metallurgy) ▪ High-grade underground mine - Mill-feed averaging $300/T NSR value (diluted) - Based only on all drilling up to 2012, no optimization ▪ Years 1-4 mill-feed will average $400/T NSR (diluted) ▪ After-tax NPV5.0% of C$423M and 2

  15. Slide 15: 2022 Groundbreaking Metallurgical Solution

    Slide 15: 2022 Groundbreaking Metallurgical Solution

    15 2022 Groundbreaking Metallurgical Solution ▪ For more than two years, Rokmaster has undertaken numerous metallurgical tests to advance the flowsheet from an initial overall gold recovery of 74.3% ▪ Recent metallurgical test work and repeatable Locked Cycle Tests (“LCT”) provided an updated flowsh

  16. Slide 16: Development of Free Gold: Gold Zonation

    Slide 16: Development of Free Gold: Gold Zonation

    16 Development of Free Gold: Gold Zonation Late-Stage Quartz Gold Veins at Deeper RRMZ ▪ DDH RR21-40 cored a 4 m intercept, 460 m vertically below the 830 m level of Main Zone with: 11.55 g/t Au and 0.021 % As over a 3 m interval ▪ Decrease in As content two orders of magnitude below deposit average

  17. Slide 17: Fosterville compared to Revel Ridge at same scale

    Slide 17: Fosterville compared to Revel Ridge at same scale

    17 Fosterville compared to Revel Ridge at same scale

  18. Slide 18: Drilling Km Scale Geochem – Structural Trend

    Slide 18: Drilling Km Scale Geochem – Structural Trend

    18 Drilling Km Scale Geochem – Structural Trend

  19. Slide 19: 2022 Drilling: RRMZ - RRYZ

    Slide 19: 2022 Drilling: RRMZ - RRYZ

    19 2022 Drilling: RRMZ - RRYZ Targeting Resource Expansion: ▪ Expand RRMZ 925 m to the southeast ▪ Expand RRMZ 290 m to the northwest; RRYZ 115 m to NW ▪ 2022 Drilling: 8,049m NQ surface drilling in 25 broadly spaced DDH’s ▪ Average drillhole spacing: ~120 m ▪ Most (18) of the 2022 DDH’s are outside

  20. Slide 20: 2022 Drilling: RRMZ - RRYZ

    Slide 20: 2022 Drilling: RRMZ - RRYZ

    2022 Drilling: RRMZ - RRYZ SE Ss Revel Ridge Project: Figure 2 Longitudinal MB sen 2022 oviting with 2021 Resource Estimate Volume RORMASTER Resources.Gorm|Soptombor 26, 2022 Looking Southwest (286" Azimuth) esoures Estimate Blogk Medel* git AUEq 200M tdeasured anc indicated Mineral Resource: 1.36 m

  21. Slide 21: 2022 Drilling: RRMZ – RRYZ NW Expansion

    Slide 21: 2022 Drilling: RRMZ – RRYZ NW Expansion

    21 2022 Drilling: RRMZ – RRYZ NW Expansion

  22. Slide 22: Cutting Channel Samples of Main Zone

    Slide 22: Cutting Channel Samples of Main Zone

    22 Cutting Channel Samples of Main Zone

  23. Slide 23: Corporate and Exploration Highlights 2020-2022

    Slide 23: Corporate and Exploration Highlights 2020-2022

    23 Corporate and Exploration Highlights 2020-2022 ▪ 2020-2021 Completed first pass UG program 16,395 m, 75 - 80% hits, expansion of RRMZ ▪ Identify free gold; quantum change in metal? ▪ NW expansion of RRYZ. ▪ 2021 Surface drilling 10,753 m, test new Au volumes, > 5 km of RRMZ trend. ▪ 2021 UG metal

  24. Slide 24: Jack Denny and mascot at Revel Ridge

    Slide 24: Jack Denny and mascot at Revel Ridge

    24 Jack Denny and mascot at Revel Ridge

  25. Slide 25: 2022 Work Plan and Budget

    Slide 25: 2022 Work Plan and Budget

    25 2022 Work Plan and Budget 2nd Option Payment (paid): $4,000,000 >27,000 m surface and underground diamond drilling: $7,500,000 Mine Permitting, Variability $500,000 Sampling & Metallurgy: Update PEA, Mine & mill $500,000 engineering: Revelstoke rail concentrate load-out facility Contingency $1,00

  26. Slide 26: Corporate Objectives, 2022-2023

    Slide 26: Corporate Objectives, 2022-2023

    26 Corporate Objectives, 2022-2023 ▪ Update PEA by Q1 2023 ▪ Grow interest of select investors ▪ Spinout Zinc – Copper Newco, trading, Q1 2023 ▪ Grow deposit size to > 3 M oz AuEq MRE update, Q1 2023 ▪ Continue drill testing RRMZ at depth, NW, and SE to facilitate further MRE growth into 2023 ▪ Cont

  27. Slide 27: Revel Ridge: the Right Targets = Keep Exploring

    Slide 27: Revel Ridge: the Right Targets = Keep Exploring

    27 Revel Ridge: the Right Targets = Keep Exploring (41,980 m drilled in 2020-2022 and growing)

  28. Slide 28: RKR Tier One Pipeline

    Slide 28: RKR Tier One Pipeline

    28 RKR Tier One Pipeline ▪ PEA (Update) Stage: Orogenic Au - Revel Ridge: ~2.5 Million oz AuEq, in all categories - Including 10’s km exploration targets ▪ Advanced Prospect: CRD – Duncan Lake Zn – Ag, proven metallogenic belt: ~30 Million tonne target ▪ Drill Ready Prospect: Sediment hosted Cu/Ag:

  29. Slide 29: RKR Project Pipeline: Duncan Lake CRD Ag/Zn

    Slide 29: RKR Project Pipeline: Duncan Lake CRD Ag/Zn

    29 RKR Project Pipeline: Duncan Lake CRD Ag/Zn ▪ Major metallogenic belt, dozens mines & occurrences, Kootenay Arc Zn-Pb-Ag ▪ Duncan Lake – President zonation Zn to Ag

  30. Slide 30: RKR & Ag/Zn Duncan Regional Zn-Ag Trend

    Slide 30: RKR & Ag/Zn Duncan Regional Zn-Ag Trend

    30 RKR & Ag/Zn Duncan > 10 km Regional Zn - Ag Trend ▪ 5 major Zn - Ag occurrences on RKR property ▪ Road access, excellent infrastructure ▪ Drill ready Tier 1 targets

  31. Slide 31: RKR & Silver–Zinc: Duncan North – President Zone

    Slide 31: RKR & Silver–Zinc: Duncan North – President Zone

    31 RKR & Silver – Zinc: Duncan North – President Zone C89-5: 7.1% Zn and 4.6% Pb over 8.0 m C91-7:11.4 % Zn and 0.8% Pb over 4.8 m C97-12: 6.2% Zn and 6.3% Pb over 7.5 m 2022: Three drillholes totalling 681.2 metres D22-02: 2.06% Zn, 2.56% Pb, and 8.38 g/t Ag over 20.85 m

  32. Slide 32: RKR Project Pipeline: Big Copper Sediment Hosted Cu-Ag

    Slide 32: RKR Project Pipeline: Big Copper Sediment Hosted Cu-Ag

    32 RKR Project Pipeline: Big Copper Sediment Hosted Cu - Ag ▪ Cu demand: price escalation $4.50/lb ▪ Cu supply: exploration escalation ▪ Known occurrence: 4.5 km Cu trend, Cominco drilling, 1965: • 4.4 m of 3.30% Cu, within 29.7 m of 1.4% Cu (no Ag assays) • 4.1 m of 1.20% Cu (no Ag assays) ➢ Permit

Source: Internet Archive copy of rokmaster.com

More decks from Rokmaster Resources Corp.

All 22 Rokmaster Resources decks