Andrada Mining Limited · LSE:ATM

Andrada Mining — AfriTin Mining — Non-Deal Roadshow (April 2021)

21 slides from Andrada Mining's roadshow presentation, April 2021

  1. Slide 1: Developing a New Tech-Metals Province

    Slide 1: Developing a New Tech-Metals Province

    DEVELOPING A NEW TECH-METALS PROVINCE Low cost, high margin tin producer with significant lithium and tantalum potential April 2021

  2. Slide 2: Disclaimer

    Slide 2: Disclaimer

    DISCLAIMER These presentation slides (the “Slides”) do not comprise an admission document, listing Any investment, investment activity or controlled activity to which the Slides relates is particulars or a prospectus relating to AfriTin Mining Limited (“the Company”) or any available only to such pe

  3. Slide 3: Becoming an African Tech-Metals Champion

    Slide 3: Becoming an African Tech-Metals Champion

    BECOMING AN AFRICAN TECH-METALS CHAMPION  A portfolio of production, development and exploration assets in Africa  Flagship asset: Uis Tin Mine, Namibia  Fully permitted and compliant, simple, low strip, low cost, open cast mine  Nameplate tin concentrate production target exceeded for Phase 1 i

  4. Slide 4: Tin Market Fundamentals

    Slide 4: Tin Market Fundamentals

    TIN MARKET FUNDAMENTALS  International Tin Association reporting tin demand could double - Business Insider Markets by 2050  The tin price has recovered to pre-COVID-19 levels, topping Tin price tops US$30 900/t – the highest since 2011 and is expected to be a Tin Price (US$/t) at 15/03/2021 US$30

  5. Slide 5: Namibia: A Stable, Tier Mining Jurisdiction with Access to Infrastructure

    Slide 5: Namibia: A Stable, Tier Mining Jurisdiction with Access to Infrastructure

    NAMIBIA: A STABLE, TIER 1 MINING JURISDICTION WITH ACCESS TO INFRASTRUCTURE  A stable investment jurisdiction, stable democracy with Walvis Bay Port upgrade Road between Uis completed and Walvis Bay an independent, strong legal system  Long established Mining Act – regulated by the Minerals Act 33

  6. Slide 6: Environmental, Social and Governance

    Slide 6: Environmental, Social and Governance

    ENVIRONMENTAL, SOCIAL AND GOVERNANCE  AfriTin Mining is working towards compliance with the International Finance Corporation's Performance Standards and provides a conflict-free source of tin. We strive to use resources sparingly to reduce our operations' impact on the environment, stakeholders, a

  7. Slide 7: Namibian Assets

    Slide 7: Namibian Assets

    NAMIBIAN ASSETS Historical mining footprint only a fraction of existing licence areas in a proven tin province. AfriTin aims to expand the company's footprint across the region. EPL 567 0 EPL5 445 ML 13 ML 4 129 ML 133  Brandberg West: Exploration licence EPL5445 covering 35 089 Ha  Historically p

  8. Slide 8: Uis – Flagship Asset

    Slide 8: Uis – Flagship Asset

    UIS – FLAGSHIP ASSET HISTORICAL (CIRCA 1989)  Historically the largest hard-rock tin mine in the world  A globally significant JORC-compliant mineral resource estimate  Exceeded the historical resource estimate by 70%:  95,539t of tin  6,091t of tantalum  450,265t of lithium oxide  Fully perm

  9. Slide 9: UTMC – FY2021 Production Update

    Slide 9: UTMC – FY2021 Production Update

    UTMC – FY2021 PRODUCTION UPDATE Concentrate Production 2021 FY - Targets and Actuals (% QoQ increases in production indicated) 250 200  Nameplate capacity 60t of Tonnes of Tin Concentrate 29% Inc 150 concentrate per 64% Inc month 100  Total tonnes of 167% Inc concentrate for 50 the 2021FY = 473t 

  10. Slide 10: Uis Phased Expansion

    Slide 10: Uis Phased Expansion

    UIS PHASED EXPANSION Phase 1 expansion (financed by existing cash flows) will maximise the existing plant whilst studies are ongoing for Phase 2. Phase 1 construction complete, nameplate capacity exceeded Ore feed: 80tph Tin feed grade: 0.139% Sn Current Phase 1 Tin recovery: 60% Tin conc. grade: 65

  11. Slide 11: Additional Revenue Streams at Uis

    Slide 11: Additional Revenue Streams at Uis

    ADDITIONAL REVENUE STREAMS AT UIS  Both lithium and tantalum already mined with globally significant resources within the same ore body (zero additional mining costs)  Lithium  450 kt of Li20 @ 0.63% grade  Lithium market continues to be buoyed by the Li-battery USGC - Minespans by Mckinsey mark

  12. Slide 12: Exploration Upside

    Slide 12: Exploration Upside

    EXPLORATION UPSIDE  Concurrent exploration programmes targeting higher grade pegmatites with low stripping ratios  Regional mapping programme completed  Visual confirmation of cassiterite mineralisation for over 180 pegmatites within 5km of processing plant  Identified higher grade areas within

  13. Slide 13: Growth Strategy

    Slide 13: Growth Strategy

    GROWTH STRATEGY Horizon 1: Horizon 2: Horizon 3: Consolidate operations and Lay Expansion and Growth An integrated Pan-African tech growth foundation minerals operator • Project finance for Phase 2 construction • Consolidation of other assets in • Expansion of existing operations different jurisdict

  14. Slide 14: Summary

    Slide 14: Summary

    SUMMARY DEVELOPING A NEW TECH-METALS PROVINCE  Low cost, high margin tin producer with significant lithium and tantalum potential  Clear development timeline with catalysts for value creation:  Fully permitted and compliant operation in production  Phase 1 nameplate capacity production target ex

  15. Slide 15: Appendices

    Slide 15: Appendices

    Y Lu 2 (a) Zz Lu fal ‘au <x

  16. Slide 16: Uis JORC-Compliant Mineral Resource Estimate

    Slide 16: Uis JORC-Compliant Mineral Resource Estimate

    UIS JORC-COMPLIANT MINERAL RESOURCE ESTIMATE Multiple globally significant maiden resources declared for Uis  Multiple mineralised pegmatites mapped  Historical ISCOR drill data for V1 and V2 pegmatites has been validated by AfriTin’s Phase 1 exploration programme  V1/V2  Maiden resource is 1 of

  17. Slide 17: Mining & Metallurgy

    Slide 17: Mining & Metallurgy

    MINING & METALLURGY  Conventional open pit mining methods, with a truck and excavator mobile equipment Hanging Wall combination  Mine design exploits outcropping pegmatites allowing for low mining costs V2 Pegmatite  Large pegmatite footprint allows for economies of scale  Coarse grained cassite

  18. Slide 18: Process Flow Diagram

    Slide 18: Process Flow Diagram

    PROCESS FLOW DIAGRAM 0.5 TPH 0.2 TPH 0.7 TPH ROM Sn 4.59% Sn 1.35% Sn 3.57% 173 TPH Rougher Scavenger 23.5 TPH Sn 0.14% Spiral Sn 0.04% Spiral 0.7 TPH Sn 2.30% Fine 24 TPH VGF and Sn 0.12% Shaking Primary Table Crushing De- 0.1 TPH Thickener Sliming 4 TPH Sn 0.03% Sn 0.13% 0.04 TPH Sn 56.5% 28 TPH S

  19. Slide 19: Infrastructure and Power/Water

    Slide 19: Infrastructure and Power/Water

    INFRASTRUCTURE AND POWER/WATER  10-year supply agreement concluded with Namibia Power Corporation:  Provides for the full on-site power requirements for Phase 1 mining and processing facility  Significantly more cost effective than diesel generated power  Supply voltage of 66 kV  Supply agreeme

  20. Slide 20: Team

    Slide 20: Team

    TEAM Professional team with over 120 years of combined mining experience. Glen Parsons Terence Goodlace Laurence Robb Non-executive Chairman Non-executive Director Non-executive Director  CEO of Awale Resources Limited, a TSXV listed West  40+ years’ experience in mining; currently NED at  Visiti

  21. Slide 21: Contact

    Slide 21: Contact

    Anthony Viljoen, CEO info@afritinmining.com www.afritinmining.com Registered office PO Box 282, Oak House, Hirzel Street, St Peter Port, Guernsey, GY1 3RH Representative office 2nd Floor, Building 3 Illovo Edge Office Park Corner Harries & Fricker Road Illovo Johannesburg, 2116 South Africa 2 Park S

Source: Internet Archive copy of andradamining.com

More decks from Andrada Mining Limited

All 20 Andrada Mining decks