Slide 1: _— : Palwation ating nspection FAERIMRAH
_— : Palwation ating nspection FAERIMRAH evaluation, rating, inspection
Slide 2: HA ERI AA
HA ERI AA
Slide 3: 4,280 4,480 4,607 3,987 4,001 3,966 2.5% 1.3% 6.0% 120 63 56 285 2.8%
4,280 4,480 199 4,607 3,987 4,001 14 3,966 106 57 49 276 2.5% 1.3% 6.0% 120 63 56 285 2.8% 1.4% 6.2% 3
Slide 4: HA ERI AA
HA ERI AA
Slide 5: 2,350 2,802 3,249 2,056 2,323 2,608 1,015 2 187 870 914 794 119 99
2,350 2,802 451 3,249 179 2,056 2,323 266 2,608 1,015 883 132 187 870 914 794 119 99 487 4,280 4,480 199 106 4,607 5
Slide 6: 22,766 19,600 3,166 21,172 16,449 15,600 15,115 10,075 ,300 2,775 7,008 5,252 6,000 748
22,766 19,600 3,166 21,172 16,449 15,600 849 15,115 10,075 7,300 2,775 7,008 5,252 6,000 748 14,570 6
Slide 7: 12,377 8,908 10,075 7,318 8,246 22,083 41 3,086 44 188 63 81 27 1,161
12,377 275 8,908 233 10,075 382 7,318 279 8,246 100 22,083 341 3,086 44 188 63 81 27 1,161 583 7
Slide 8: Valuation ating
Valuation ating Att
Slide 9: HA ERI AA
HA ERI AA
Slide 10: 10
10
Slide 11: HA ERT feat
1 HA ERT feat 11
Slide 12: 8,863 9,278 10,126 8,279 8,313 8,939 .3% 3.0% 1.7% 309 289 20 187 3.5%
8,863 9,278 414 10,126 8,279 8,313 34 8,939 293 277 15 172 3.3% 3.0% 1.7% 309 289 20 187 3.5% 3.1% 1.8% 287 255 32 264 11,145.85 9,893.16 1252.69 10,238.33 12
Slide 13: HA ERT feat
1 HA ERT feat rT] 35S 13
Slide 14: NET)
Valuation ating 14
Slide 15: ¾ ¾ ¾ ¾ ¾ ¾ 1,000 ¾ ¾
¾ ¾ 21 12 8 22 12 ¾ ¾ ¾ 30 ¾ 1,000 ¾ ¾ 15
Slide 16: in HAR ERI RASH
in HAR ERI RASH 35 20 16
Slide 17: 17
517 579 634 715 687 350 395 444 509 491 163 222 300 329 315 17
Slide 18: 18
18
Slide 19: ating nspection HAERI Att
ating nspection HAERI Att _JASDAQ_ 7 19
Slide 20: TASDAQ Beeston ating ospection AARERTHARH
TASDAQ Beeston ating ospection AARERTHARH antl 20