Slide 1: Emerging World Class Earaheedy Base Metals Discovery
ASX: RTR Emerging World Class Earaheedy Base Metals Discovery Diggers & Dealers Mining Forum 2022 Investor Presentation - Booth 44 ASX: RTR August 2022
Slide 2: Rumble Value Drivers
Rumble Value Drivers Earaheedy – Emerging World Class Base Metal Discovery • 13km’s of Zn-Pb mineralisation – Zinc sulphide dominant, shallow, flat lying and open • High grade, well defined (>5% Zn-Pb) domains – Ongoing drilling/resource focus • Initial Exploration Target 100-120Mt (3.5% - 4.5% Zn-P
Slide 3: Corporate Overview
Corporate Overview Capital Structure (RTR:ASX) Share Price Performance Shares On Issue (m) 621.4 Unlisted Options1,2,3 (m) 23.6 Market Capitalisation4 (A$m) 175 Cash (30 June 2022) (A$m) 17.9 Debt (A$m) Nil Enterprise Value (A$m) 157.1 Notes: 1. 4.6 million 15c Options (Various Expiry), 2. 4.0 milli
Slide 4: Building a Team to Deliver Earaheedy
Building a Team to Deliver Earaheedy Board of Directors Shane Sikora Peter Venn Geoff Jones Matthew Banks Michael Smith Managing Director Non-Executive Director Non-Executive Director Non-Executive Director Non-Executive Director • Founding member of Rumble • Geologist with over 30 years • Civil eng
Slide 5: Major Zinc Dominant Sulphide Discovery
Major Zinc Dominant Sulphide Discovery • Major sedimentary hosted base metal discovery in the Earaheedy Basin announced on 19 April 2021 Chinook discovery hole intersected: o 34m @ 4.22% Zn+Pb from 66m, incl. 15m @ 6.97% Zn+Pb, from 74m • Exceptional exploration has uncovered an open 13x2km Zn-Pb-Ag
Slide 6: Zinc Supply and Role in a Low-Carbon Economy
Zinc Supply and Role in a Low-Carbon Economy • Critical Mineral in USA • Strong future role in renewable energy storage in solar, wind farms & batteries • Galvanised steel is the preferred material for electric vehicles • Supply - Expected to fall 3.5% pa to 2030 due to depleted mines • Demand - Sig
Slide 7: Earaheedy – Globally Significant Discovery
Earaheedy – Globally Significant Discovery • Initial Exploration Target: Open pit proposition 100-120Mt (3.5% - 4.5% Zn-Pb Sulphide)* • Globally only 8% of zinc is mined open pit - significantly lower mining costs • Exceptional potential to increase the Initial Exploration Target to Super Giant (>30
Slide 8: Emerging World Class Base Metal System
Emerging World Class Base Metal System Targets 1 & 2 - Unconformity Target • Discovered flat lying Zn-Pb-Ag by Rumble at the Chinook, Tonka and Navajoh Prospects in the Navajoh Unconformity Unit • Only style currently drill testing Target 3 - MVT Type Target • Supported by limited historic drilling
Slide 9: Provincial Scale Discovery Potential
Provincial Scale Discovery Potential 42km Prospective Unconformity (Types 1-2) Strike • Chinook Prospect mineralised footprint is 5km x 2km - open in all directions • Tonka - Prospect mineralised footprint is 8km x 2km - open in all directions • 15km of the Sweetwater Trend – initial RC campaign com
Slide 10: Chinook: Large Open Pit with Higher-Grade Domains
Chinook: Large Open Pit with Higher-Grade Domains • Multiple east-west and northwest feeder structures hosting higher-grade (>5%) Zn-Pb domains up to 3km long x 300m wide – Current drilling focus • Wide, shallow & flat lying 5km x 2km Zn-Pb mineralised footprint • Mineralisation remains open in all
Slide 11: Tonka/Navajoh: Large Open Pit with Higher-Grade Domains
Tonka/Navajoh: Large Open Pit with Higher-Grade Domains • Multiple east-west feeder structures hosting large higher-grade (>5%) Zn-Pb domains up to 5km long and 500m wide – Drilling focus • Wide, shallow & flat lying 8km x 2km Zn-Pb mineralised footprint • Mineralisation remains open in all directio
Slide 12: Tonka High-Grade Feeders, Shallow & Flat Lying
Tonka High-Grade Feeders, Shallow & Flat Lying • Multiple higher grade (>5%) domains associated with interpreted feeder zones – near term drill focus • Shallow and flat lying mineralisation provides potential for large scale open pit mine development • Potential free dig scenario – Low-cost waste re
Slide 13: Potential DMS & Ore Sorting benefits
Potential DMS & Ore Sorting benefits • Rumble is trialing DMS and Ore Sorting for the mineralisation outside the higher-grade Zn-Pb zones - benefits include; o Technique can increase on average ore grade by 2-5 times o Removes waste early which can significantly lower the CAPEX and OPEX o Flotation
Slide 14: Analogy: Pering Open Pit Mine, South Africa
Analogy: Pering Open Pit Mine, South Africa • Pering Zinc-Lead discovery made in 1978 by BHP Billiton Pering Zn-Pb Open Pit Mine, South Africa • 70km Southwest of Vryburg, Northwest region of South Africa • Mined by a joint venture comprising Shell & BHP Billiton • 20.5Mt mined at 2.6% Zn & 0.6% Pb
Slide 15: Interactive 3D fly through
Interactive 3D fly through 15
Slide 16: Sustainability
Sustainability • Diversity in the workforce • Utilising the local community stakeholders and suppliers to create a positive contribution to the region • Recognise and engagement with traditional owners • Growing employment opportunities • Incorporate best practice environmental principles • Sponsor
Slide 17: Near Term Catalysts at Earaheedy
Near Term Catalysts at Earaheedy 1. Major 50,000m Drilling Program in 2022 – 26,000m completed ▪ Target (>5% Zn+Pb) high-grade domains at the Chinook and Tonka- Navajoh Prospects – >20,000m drilled - assays pending ▪ Target Chinook extension and new discoveries along the 15km strike of the untested
Slide 18: Appendix
Appendix 18
Slide 19: Rumble’s Pipeline of Projects Strategy
Rumble’s Pipeline of Projects Strategy Project Pipeline Strategy Targeting Valuable Discovery Project Development • Generate a pipeline of projects at various • Fast track low-cost drill target generation • Establish a Board and Management stages of development • Drill first order targets for discov
Slide 20: Earaheedy Discovery: Initial Exploration Target
Earaheedy Discovery: Initial Exploration Target Earaheedy Project Initial Exploration Target Range Tonnes Grade Lower 100,000,000 3.5% Zn + Pb Sulphide Upper 120,000,000 4.5% Zn + Pb Sulphide Notes: Rumble’s initial first stage exploration target at the Earaheedy Project is between 100 to 120 Includ
Slide 21: Earaheedy – Infrastructure in World Class Jurisdiction
Earaheedy – Infrastructure in World Class Jurisdiction 21
Slide 22: Global Zinc Uses
Global Zinc Uses Overview Uses • Zinc is one of the most versatile and essential materials known to mankind. It is the fourth most used metal in the world behind iron, aluminum, and copper. Galvanising 5% 2% • The primary use of zinc is in the galvanizing process, which protects 9% iron and steel fr
Slide 23: Green Metal - Zinc’s Role in a Low-Carbon Economy
Green Metal - Zinc’s Role in a Low-Carbon Economy Zinc is 100% recyclable – it can be recovered and reused without a loss in quality Offshore wind turbines require a zinc coating to Zinc handle extreme coatings environmental conditions protect solar panel • Zinc is a key ingredient in 1 battery tech
Slide 24: Zinc Uses in Renewables
Zinc Uses in Renewables Accelerated investment and adoption of renewable energy is leading to growing zinc demand 61% 136,000 Zinc (Tonnes) 107% 14,000 162,000 150,000 300 85,000 62,000 66,000 24,000 2020 2025* 2030* Source: CRU, IRENA Offshore wind Solar Storage battery * Projected 24
Slide 25: Contacts
Contacts Shane Sikora Managing Director info@rumbleresources.com.au +61 8 6555 3980 www.rumbleresources.com.au Level 1, 16 Ord Street, West Perth, WA 6005 https://www.linkedin.com/company/ rumble-resources-ltd https://twitter.com/RumbleResources 25
Slide 26: Disclaimer
Disclaimer Disclaimer This presentation has been prepared by Rumble Resources Limited (Rumble or the Company). It contains general information about the Company’s activities current as at the date of the presentation. The information is provided in summary form and does not purport to be complete. T